MONTHYEARML20196J3291999-06-28028 June 1999 Comment Supporting Proposed Rule 10CFR50 Re Industry Codes & Standards ML20206M7291999-04-30030 April 1999 Comment Supporting Draft RG DG-1083, Content of UFSAR IAW 10CFR50.71(e). Licensee of Listed Plants in Total Agreement with Comments Provided to NRC by NEI HL-5717, Comment Supporting Proposed Rule 10CFR50,52 & 72 Re Changes, Tests & Experiments.Util in Total Agreement with NEI Comments to Be Provided to NRC1998-12-18018 December 1998 Comment Supporting Proposed Rule 10CFR50,52 & 72 Re Changes, Tests & Experiments.Util in Total Agreement with NEI Comments to Be Provided to NRC HL-5715, Comments on Proposed Rule 10CFR50 Re Monitoring Effectiveness of Maint at Nuclear Power Plants.Util Is in Total Agreement with NEI Comments1998-12-14014 December 1998 Comments on Proposed Rule 10CFR50 Re Monitoring Effectiveness of Maint at Nuclear Power Plants.Util Is in Total Agreement with NEI Comments HL-5702, Comment Supporting NEI Comments Totally on Proposed Draft RG DG-4005, Preparation of Supplemental Environmental Repts for Applications to Renew Nuclear Power Plant Ols1998-10-23023 October 1998 Comment Supporting NEI Comments Totally on Proposed Draft RG DG-4005, Preparation of Supplemental Environmental Repts for Applications to Renew Nuclear Power Plant Ols HL-5695, Comment Supporting Nuclear Energy Institute (NEI) Comments on 10CFR50.55(a) Pr, Streamlined Hearing Process for NRC Approval of License Transfers1998-10-13013 October 1998 Comment Supporting Nuclear Energy Institute (NEI) Comments on 10CFR50.55(a) Pr, Streamlined Hearing Process for NRC Approval of License Transfers HL-5690, Comment on Integrated Review of Assessment Process for Commercial Nuclear Plants. Util in Total Agreement with NEI Comments Provided to NRC1998-10-0505 October 1998 Comment on Integrated Review of Assessment Process for Commercial Nuclear Plants. Util in Total Agreement with NEI Comments Provided to NRC HL-5983, Comment on Proposed Rule 10CFR50 Re Reporting Requirements for Nuclear Power Reactors. Snoc in Total Agreement with NEI Comments,To Be Provided to Nrc.Requests That NRC Provide Guidance to Application of NUREG-1022,rev 1 as Listed1998-09-21021 September 1998 Comment on Proposed Rule 10CFR50 Re Reporting Requirements for Nuclear Power Reactors. Snoc in Total Agreement with NEI Comments,To Be Provided to Nrc.Requests That NRC Provide Guidance to Application of NUREG-1022,rev 1 as Listed ML20153B2391998-09-15015 September 1998 Comment on Draft NUREG-1633, Assessment of Use of Ki as Protective Action During Severe Reactor Accidents. Endorses NEI Comments HL-5682, Comment Opposing Draft NUREG-1633, Assessment of Use of Potassium Iodide (Ki) as Protective Action During Severe Reactor Accidents, & Endorsing Comments Submitted by Nuclear Energy Institute1998-09-15015 September 1998 Comment Opposing Draft NUREG-1633, Assessment of Use of Potassium Iodide (Ki) as Protective Action During Severe Reactor Accidents, & Endorsing Comments Submitted by Nuclear Energy Institute HL-5602, Comment Opposing Proposed Rule 10CFR50 Re Industry Codes & Stds1998-04-0303 April 1998 Comment Opposing Proposed Rule 10CFR50 Re Industry Codes & Stds HL-5586, Comment on Proposed Generic Ltr, Year 2000 Readiness of Computer Sys at Npps1998-03-0404 March 1998 Comment on Proposed Generic Ltr, Year 2000 Readiness of Computer Sys at Npps HL-5582, Comment on Draft Reg Guide DG-5008, Reporting of Safeguards Events1998-02-27027 February 1998 Comment on Draft Reg Guide DG-5008, Reporting of Safeguards Events HL-5564, Comment on Draft NUREG 1555, Updated Environ Standard Review Plan1998-01-30030 January 1998 Comment on Draft NUREG 1555, Updated Environ Standard Review Plan HL-5554, Comment Supporting NEI Comments on PRM 50-63A by P Crane Recommending Emergency Planning Standard for Protective Actions Be Changed to Require Explicit Consideration of Prophylactic Use of Potassium Iodide for General Public1998-01-15015 January 1998 Comment Supporting NEI Comments on PRM 50-63A by P Crane Recommending Emergency Planning Standard for Protective Actions Be Changed to Require Explicit Consideration of Prophylactic Use of Potassium Iodide for General Public HL-5546, Comment Supporting Proposed Rule & Direct Final Rule on 10CFR50.68 & 10CFR70.24, Criticality Accident Requirements1997-12-31031 December 1997 Comment Supporting Proposed Rule & Direct Final Rule on 10CFR50.68 & 10CFR70.24, Criticality Accident Requirements HL-5529, Comment Opposing Rule 10CFR50 Re Codes & Standards,Ieee National Consensus Standard1997-12-0101 December 1997 Comment Opposing Rule 10CFR50 Re Codes & Standards,Ieee National Consensus Standard ML20199J0031997-11-24024 November 1997 Comment Supporting Proposed Rule Re Financial Requirements for Decommissioning Nuclear Power Reactors & Draft RG 1060 HL-5424, Comment on NUREG-1606, Proposed Regulatory Guidance Re Implementation of 10CFR50.59 (Changes,Tests or Experiments). Encourages NRC Not to Abandon 30 Yrs of Effective Implementation of 10CFR.50.59 for New Positions1997-07-0707 July 1997 Comment on NUREG-1606, Proposed Regulatory Guidance Re Implementation of 10CFR50.59 (Changes,Tests or Experiments). Encourages NRC Not to Abandon 30 Yrs of Effective Implementation of 10CFR.50.59 for New Positions ML20148N0741997-06-19019 June 1997 Comment on Proposed Suppl to Bulletin 96-001 Re Control Rod Insertion Problems.Util in Complete Agreement That Incomplete Rcca Insertion Not Acceptable HL-5407, Comment Opposing NRC Proposed Strategies to Address Licensees Need to Establish & Maintain safety-conscious Work Environ1997-05-27027 May 1997 Comment Opposing NRC Proposed Strategies to Address Licensees Need to Establish & Maintain safety-conscious Work Environ ML20137C2581997-03-18018 March 1997 Summary of Director'S Decision Under 10CFR2.206 of Mb Hobby & AL Mosbaugh, ML20137C4261997-03-18018 March 1997 Director'S Decision Under 10CFR2.206 Re Petition Re Allegation of Illegal Transfer of OLs to Southern Nuclear Operating Co.Petitions Filed by Mb Hobby & AL Mosbaugh Denied HL-5268, Comment Supporting Draft RG DG-1047, Std Format & Content for Applications to Renew NPP Ols1996-11-27027 November 1996 Comment Supporting Draft RG DG-1047, Std Format & Content for Applications to Renew NPP Ols ML20133H1131996-11-25025 November 1996 Petition for Enforcement,Per 10CFR2.206,to Revoke Northeast Utils Operating Licenses for CT Nuclear Power Stations Due to Chronic,Systemic Mismanagement Resulting in Significant Violations of NRC Safety Regulations ML20129J5481996-10-30030 October 1996 Order.* Extends Time within Which Commission May Take Sua Sponte Review of Memorandum & Order LBP-96-16 to 961129. W/Certificate of Svc.Served on 961030 ML20129K4291996-10-0202 October 1996 Comment Supporting Proposed Rule 10CFR25 & 95, Access to & Protection of Classified Info HL-5247, Comment on Proposed Generic Communication, Primary Water Stress Corrosion Cracking of Control Rod Drive Mechanism & Other Vessel Head Penetrations1996-10-0101 October 1996 Comment on Proposed Generic Communication, Primary Water Stress Corrosion Cracking of Control Rod Drive Mechanism & Other Vessel Head Penetrations ML20128K2791996-09-30030 September 1996 Order.* Time within Which Commission May Take Sua Sponte Review of Memo & Order LBP-96-16 Extended Until 961030. W/Certificate of Svc.Served on 960930 ML20116J8921996-08-0202 August 1996 Withdrawal of AL Mosbaugh.* AL Mosbaugh Voluntarily Withdraws Intervention,Opposition & Contention in Proceedings.W/Certificate of Svc & Svc List ML20116J8551996-08-0202 August 1996 Joint Notice of Termination.* AL Mosbaugh Voluntarily Withdrew Intervention,Opposition & Contentions in Proceeding.W/Certificate of Svc & Svc List ML20116J8431996-08-0202 August 1996 Intervenor Response to Georgia Power Motion for Reconsideration.* Intervenor Supports Motion for Reconsideration.W/Certificate of Svc & Svc List ML20116N5881996-07-31031 July 1996 Comment Re Proposed Rule 10CFR26, Mods to Fitness-For-Duty Program Requirements. Supports NEI Comments ML20116A4931996-07-15015 July 1996 Georgia Power Company Motion for Reconsideration of 960628 Memorandum & Order Or,In Alternative,For Certification.* Gpc Requests That Board Not Require Submittal or Approval of Settlement Between Gpc & Mosbaugh.W/Certificate of Svc ML20115H2671996-07-0808 July 1996 Comment Supporting Final Rule 10CFR51, Environ Review of Renewal of Nuclear Power Plant Operating Licenses HL-5195, Comment Supporting Proposed Rule 10CFR50 Re Financial Assurance Requirements for Decommissioning Nuclear Power Reactors1996-06-24024 June 1996 Comment Supporting Proposed Rule 10CFR50 Re Financial Assurance Requirements for Decommissioning Nuclear Power Reactors ML20114E6491996-06-20020 June 1996 Joint Motion to Defer Issuance of Initial Decision.* Requests That ASLB Defer Issuance of Decision in Proceeding Until 960920,in Order to Allow Gpc & Mosbaugh to Reach Settlement Agreement.W/Certificate of Svc IA-95-211, Transcript of 920507 Interview of Mc Wilkins in Waynesboro, Ga.Pp 1-391996-05-0707 May 1996 Transcript of 920507 Interview of Mc Wilkins in Waynesboro, Ga.Pp 1-39 ML20129H7151996-05-0707 May 1996 Transcript of 920507 Interview of Mc Wilkins in Waynesboro, Ga.Pp 1-39 HL-5103, Comment Supporting NEI Comments on Petition for Rulemaking PRM-50-63 Re Planning Std for Protective Actions for General Public Includes Stockpile or Predistribution of Ki for Prophylactic Use1996-02-0606 February 1996 Comment Supporting NEI Comments on Petition for Rulemaking PRM-50-63 Re Planning Std for Protective Actions for General Public Includes Stockpile or Predistribution of Ki for Prophylactic Use ML20096A4911995-12-22022 December 1995 Georgia Power Co Reply to Intervenor & NRC Staff Proposed Findings of Facts & Conclusions of Law.* W/Certificate of Svc ML20095D9821995-12-12012 December 1995 Georgia Power Co Motion to Correct Record of Exhibits of Diesel Generator Reporting Issues Allegation Hearing.* W/Certificate of Svc ML20095D9771995-12-0808 December 1995 Comment on Proposed Generic Ltr Boraflex Degradation in Spent Fuel Pool Starage Racks. Request for Licensees to Demonstrate Subcriticality Margin in Unborated Water,Seems Inconsistent W/Stated Benefit of Borated Water ML20094S2751995-11-30030 November 1995 Intervenor Final Statement of Fact & Conclusions of Law.* Board Finds That Util & Applicant Failed to Meet Burden of Proof Re Ultimate Issue of Character,Competence & Integrity. W/Svc List ML20094S2411995-11-22022 November 1995 Georgia Power Co Response to Intervenors Motion for Continuance.* Intervenor Motion Unjustified & Prejudicial & Should Be Denied.W/Certificate of Svc & Svc List ML20094S2931995-11-21021 November 1995 Intervenor Motion for Continuance for Good Cause.* Requests Deadline for Filing Post Hearing Brief Be Extended Until 951130.W/Certificate of Svc & Svc List ML20094K1161995-11-0909 November 1995 Intervenor Motion to Admit Supplementary Exhibits.* Moves That Naslp Admit Encl Documents Into Evidence for Listed Reasons.W/Certificate of Svc & Svc List ML20094J9301995-11-0606 November 1995 Georgia Power Company Motion to Correct Record of Diesel Generator Reporting Issues Allegation Hearing.* Moves Licensing Board to Order That Corrections Be Made to Transcript.W/Certificate of Svc & Svc List ML20094J9281995-11-0606 November 1995 Gap Proposed Findings of Fact & Conclusions of Law on Diesel Generator Reporting Issues.* Findings of Fact & Conclusion Accepted.W/Certificate of Svc ML20094J9201995-11-0101 November 1995 Affidavit of Ck Mccoy to Correct Info Contained in Intervenor Exhibit II-97,which Consists of Portions of Deposition in a Mosbaugh Complaint Against Gap 1999-06-28
[Table view] Category:PLEADINGS
MONTHYEARML20133H1131996-11-25025 November 1996 Petition for Enforcement,Per 10CFR2.206,to Revoke Northeast Utils Operating Licenses for CT Nuclear Power Stations Due to Chronic,Systemic Mismanagement Resulting in Significant Violations of NRC Safety Regulations ML20116J8431996-08-0202 August 1996 Intervenor Response to Georgia Power Motion for Reconsideration.* Intervenor Supports Motion for Reconsideration.W/Certificate of Svc & Svc List ML20116A4931996-07-15015 July 1996 Georgia Power Company Motion for Reconsideration of 960628 Memorandum & Order Or,In Alternative,For Certification.* Gpc Requests That Board Not Require Submittal or Approval of Settlement Between Gpc & Mosbaugh.W/Certificate of Svc ML20114E6491996-06-20020 June 1996 Joint Motion to Defer Issuance of Initial Decision.* Requests That ASLB Defer Issuance of Decision in Proceeding Until 960920,in Order to Allow Gpc & Mosbaugh to Reach Settlement Agreement.W/Certificate of Svc ML20095D9821995-12-12012 December 1995 Georgia Power Co Motion to Correct Record of Exhibits of Diesel Generator Reporting Issues Allegation Hearing.* W/Certificate of Svc ML20094S2411995-11-22022 November 1995 Georgia Power Co Response to Intervenors Motion for Continuance.* Intervenor Motion Unjustified & Prejudicial & Should Be Denied.W/Certificate of Svc & Svc List ML20094S2931995-11-21021 November 1995 Intervenor Motion for Continuance for Good Cause.* Requests Deadline for Filing Post Hearing Brief Be Extended Until 951130.W/Certificate of Svc & Svc List ML20094K1161995-11-0909 November 1995 Intervenor Motion to Admit Supplementary Exhibits.* Moves That Naslp Admit Encl Documents Into Evidence for Listed Reasons.W/Certificate of Svc & Svc List ML20094J9301995-11-0606 November 1995 Georgia Power Company Motion to Correct Record of Diesel Generator Reporting Issues Allegation Hearing.* Moves Licensing Board to Order That Corrections Be Made to Transcript.W/Certificate of Svc & Svc List ML20093F9171995-10-13013 October 1995 Georgia Power Co Position on Effect of DOL Case 90 ERA-30.* Recommends Board Should Refrain from Considering or Giving Any Effect to Secretary of Labor Determination in 90 EAR-30. W/Certificate of Svc ML20093F9441995-10-13013 October 1995 Georgia Power Co Response to Intervenor Motion to Conduct Discovery Re Dew Point Instruments.* Recommends That Intervenor Motion to Conduct Discovery Re Dew Point Instruments Be Denied.W/Certificate of Svc ML20093F8681995-10-13013 October 1995 Intervenor Response to Board Memorandum & Order (Effect of DOL Case 90-ERA-30).* Bloomburg & Comanche Peak Precedents Demonstrate Applicability of Issue Preclusion to Matl Fact Containing to Hobby Decision.W/Certificate of Svc ML20093F9901995-10-12012 October 1995 Ga Power Company Response to Intervenor Motion to Admit Certain Admissions of Ga Power.* Intervenor Motion to Admit Certain Admissions of Ga Power,Dtd 951006,should Be Denied. W/Certificate of Svc & Svc List ML20093G1081995-10-12012 October 1995 Georgia Power Co Response to Intervenors Motion to Conduct Further Discovery Against NRC Staff.* Motion to Conduct Further Discovery Denied.W/Certificate of Svc ML20093F9751995-10-12012 October 1995 Ga Power Company Response to Intervenors Motion to Admit Exhibit II-247 (Transcript of Tape 99B).* Intervenor Motion to Admit Intervenor Exhibit II-247 Into Evidence Should Be Denied.W/Certificate of Svc & Svc List ML20093F9541995-10-12012 October 1995 Ga Power Company Response to Intervenor Motion to Strike Affidavit of H Handfinger.* W/Certificate of Svc ML20093B9301995-10-0606 October 1995 Intervenor Motion to Admit Certain Admissions of Georgia Power.* Intervenor Requests That Admission Responses & Corresponding OI Paragraphs Listed Be Admitted Into Record. W/Certificate of Svc ML20093B8901995-10-0606 October 1995 Intervenor Motion to Conduct Discovery Re Dew Point Instruments.* Intervenor Requests to Conduct Addl Discovery & to Obtain Further Relief.W/Certificate of Svc ML17311B3631995-10-0505 October 1995 Intervenor Motion to Admit Exhibit II-247 (Transcript of Tape 99B).* Intervenor Requests That Intervenor Exhibit II-247 Be Admitted Into Evidence.W/Certificate of Svc & Svc List ML20093B7101995-10-0505 October 1995 Intervenor Motion to Complete Discovery Against NRC Staff Expert Witness (Mgt Panel).* W/Certificate of Svc & Svc List ML20093B8291995-10-0505 October 1995 Intervenor Motion to Strike Affidavit of H Handfinger.* Affidavit of H Handfinger Should Be Stricken,In Entirety, from Record of Proceeding.W/Certificate of Svc & Svc List ML20098B7981995-10-0303 October 1995 Georgia Power Company Supplemental Response to Intervenor Addl Discovery Request Dtd 950905.* W/Certificate of Svc & Svc List ML20098B4671995-10-0202 October 1995 Intervenor Request for Continuance to File Response to Georgia Power Co Petition for Review.* W/Certificate of Svc ML20098B4691995-10-0202 October 1995 Intervenor Opposition to Georgia Power Company Petition for Review of Order to Produce Attorney Interview Notes.* W/Certificate of Svc & Svc List ML20092M6071995-09-26026 September 1995 Georgia Power Co Response to Intervenor Addl Discovery Request Dtd 950905.* Request Granted.W/Certificate of Svc ML20092H6571995-09-11011 September 1995 Georgia Power Company Opposition to Intervenor Motion to Strike Testimony of Hill & Ward & to Conduct Addl Discovery.* W/Certificate of Svc & Svc List ML20092H6771995-09-11011 September 1995 Ga Power Company Motion for Stay of Licensing Board Order Requiring Production of Attorney Notes of Privileged Communications.* W/Certificate of Svc & Svc List ML20092A4821995-09-0505 September 1995 Intervenor Motion to Strike Expert Testimony of Hill & Ward & to Conduct Addl Discovery.* Intervenor Requests That Hill & Ward Testimony Be Stricken & Gap File Expedited Responses to Requested Discovery.W/Certificate of Svc ML20091S3861995-08-22022 August 1995 Georgia Power Co Response to Intervenor Motion to Admit Certain Admissions & Sections of OI Rept Into Evidence.* Georgia Power Neither Admit Nor Deny Admissions.W/ Certificate of Svc & Svc List ML20087K2911995-08-15015 August 1995 Response to Licensee Motion for Reconsideration Re Notes of E Dixon Noted & Brief on Attorney Client Privilege.* Requests That Board Order Immediate Production of Interview Notes.W/Certificate of Svc & Svc List ML20087K2801995-08-14014 August 1995 Intervenor Response to Georgia Power Company Motion to Exclude Admission of OI Conclusions.* W/Certificate of Svc & Svc List ML20087K4731995-08-0808 August 1995 Gap Opposition to Intervenor Supplemental Motion to Compel Interview Notes & Other Documents Known to Gap Counsel When Preparing Response to Nov.* Informs That Motion Should Be Denied.W/Certificate of Svc & Svc List ML20087K4021995-08-0808 August 1995 Georgia Power Co Motion for Reconsideration of Order Re Request for Discovery Re E Dixon.* Believes That Board Should Deny Intervenor Motion.W/Certificate of Svc & Svc List ML20087K3501995-08-0404 August 1995 Licensee Position on Admissibility of Staff Exhibits II-5 & II-10.* W/Certificate of Svc & Svc List ML20087A6961995-07-28028 July 1995 Georgia Power Company Motion to Exclude Admission of OI Conclusions.* W/Certificate of Svc & Svc List ML20087A6871995-07-28028 July 1995 Ga Power Company Motion for Issuance of Subpoena.* W/Certificate of Svc & Svc List ML20087A5711995-07-24024 July 1995 Intervenors Supplemental Motion to Compel Interview Notes & Other Documents Known to Ga Power Company Counsel When Preparing Response to Nov.* Board Should Order Production of Notes of E Dixon.W/Certificate of Svc & Svc List ML20086P7801995-07-17017 July 1995 Georgia Power Co Response to Intervenor Motion to Compel Production of Licensee Notes of Interview of Ester Dixon.* Intervenor Motion Should Be Denied.W/Certificate of Svc ML20086P5961995-07-10010 July 1995 Intervenor Motion to Clarify Record.* Requests Board to Clarify Record to Reflect That on 950517,exhibits Identified in List of Stipulated Exhibits,Were Received Into Evidence. W/Certificate of Svc ML20086H2271995-06-30030 June 1995 Intervenor Motion to Compel Production of Licensee Notes of Interview of Ester Dixon.* W/Certificate of Svc & Svc List ML20085C8871995-05-29029 May 1995 Intervenor Response to Motion to Quash Subpoenas of C Coursey,M Hobbs & RP Mcdonald.* Motion to Quash Should Be Denied.W/Certificate of Svc & Svc List ML20084L2871995-05-24024 May 1995 Motion by Georgia Power Company Cl Coursey,Ml Hobbs & RP Mcdonald to Quash Subpoenas of C Coursey,Ml Hobbs & RR Mcdonald.* W/Certificate of Svc & Svc List ML20083R0291995-05-18018 May 1995 Georgia Power Company Brief on Inadmissibility of OI Rept or in Alternative Motion for Certification to Commission.* Advises That Exhibits Should Not Be Admitted Into Evidence in Proceeding.W/Certificate of Svc & Svc List ML20083C8421995-05-12012 May 1995 Intervenor Response to Util Motion for Order Preserving Licensing Board Jurisdiction.* Intervenor Requests That Commission Deny Util Motion for Order Preserving Licensing Board Jurisdiction.W/Certificate of Svc & Svc List ML20083C8461995-05-10010 May 1995 Georgia Power Co Response to Board Question Re 900410 IIT Questions.* Licensing Board Requests That Util Advise Board of Response to a Chaffee 900410 Request for Calcon Sensor Data.W/Certificate of Svc & Svc List ML20083C8241995-05-0909 May 1995 Georgia Power Co Response to Board Question Re Diesel Testing Transparency.* Util Believes That Cash Did Not Include Start 128-131 Since Starts Were Not Included on Typed List.W/Certificate of Svc & Svc List ML20083L7781995-05-0909 May 1995 Georgia Power Co Response to Board Question Re Definition of Successful Start.* W/Certificate of Svc ML20083L7251995-05-0707 May 1995 Intervenor'S Response to Gpc Motion to Strike Partially Intervenor'S Prefiled Testimony.* Requests That Gpc Motion to Strike Partially Intervenor'S Prefiled Testimony Be Overruled in Entirety.W/Certificate of Svc & Svc List ML20083K2971995-05-0202 May 1995 Intervenor Motion for Enlargement of Time.* Requests Enlargement of Time to Respond to Georgia Power Co Motion to Strike Partially Prefiled Testimony.W/Certificate of Svc & Svc List ML20082T3871995-04-27027 April 1995 Georgia Power Co Motion for Order Preserving Licensing Board Jurisdiction.* Requests That Commission Grant Relief Request.W/Certificate of Svc & Svc List 1996-08-02
[Table view] |
Text
- Te- B L ,
000 METED l
USNRC February 14, 1986 l
UNITED STATES OF AMERICA. '86 FEB 18 41:40 NUCLEAR REGULATORY. COMMISSION OFFICE Gr mcc .;,v l BEFORE THE ATOMIC SAFETY AND uICENSING BOA @CKEilNG 15EPVlM,'
BRANCH
! In the Matter of )
)
GEORGIA POWER COMPANY, et al. ) Docket Nos. 50-424
- ) 50-425 (Vogtle Electric Generating Plant, )
Units 1 and 2) )
APPLICANTS' STATEMENT OF MATERIAL FACTS AS TO WHICH NO GENUINE' ISSUE EXISTS TO BE HEARD REGARDING CONTENTION EP-2/EP-2(c)
(USE OF NOAA TONE ALERT RADIOS)
Pursuant to 10 C.F.R. S 2.749(a), Applicants state in sup-port of " Applicants' Motion for Summary Disposition of Joint Intervenors' Contention EP-2/EP-2(c)" that no genuine issue ex-ists to be resolved with respect to the following material facts:
- 1. As admitted by the Board, Joint Intervenors' Conten-tion EP-2/EP-2(c) concerns the use of NOAA tone alert radios (in lieu of some other type of radio alerting system) for pub-lic alerting within the Vogtle plume exposure pathway Emergency Planning Zone ("EPZ").
- 2. The National Oceanographic and Atmospheric Adminis-tration ("NOAA") operates the National Weather Radio Network' ,
providing continuous broadcasts of the latest weather in-formation directly from National Weather Service offices. In 8602190425 PDR 8ADOCMO30$0424 PDR-O
9 severe weather, the routine weather information is interrupted for broadcast of special warning messages, and a signal can be transmitted to automatically activate NOAA weather radio re-ceivers within the broadcast area so that the warning message is disseminated to all NOAA weather radio receivers in that area. Keast Affidavit, 1 3.
- 3. The NOAA weather radio system has been well-received across the country. This support reflects the system's useful-ness to all areas of the nation in providing valuable -- and sometimes lifesaving -- information to government officials and members of the public involved in agriculture, recreation, transportation, energy conservation, marine travel and emergen-cy management. Keast Affidavit, 1 4.
- 4. Unlike other radio alerting systems (which lack l day-to-day utility and therefore may not be as widely used by 1
members of the public), the NOAA weather radio system has utility to the public on a routine, daily basis. This is a unique feature of the NOAA weather radio system as opposed to l other radio alerting systems for the public. Keast Affidavit, T 4.
- 5. Because the NOAA weather radio broadcasts have proven I to be a widely-accepted, highly valuable public service else-1 l
l where across the nation, they can be expected to enjoy similar popularity within the Vogtle plume exposure pathway Emergency Planning Zone ("EPZ"). Keast Affidavit, 44.
1 I
- 6. The NOAA weather radio system has been in use across the country for about a decade, and is a proven technology. -
There is no other radio alerting system for the general public I that is as proven in its reliability and effectiveness as the NOAA system. Keast Affidavit, 1 5.
- 7. The extensive operating experience with NOAA weather radios demonstrates that they do not "go off frequently without reason". While temporary, minor problems sometimes occur dur-ing installation testing and system " shakedown", they are read-ily resolved and do not affect the long-term utility and reliability of the NOAA weather radio system. Keast Affidavit, 1 6.
- 8. The NOAA weather radio system within the Vogtle EPZ l
will not broadcast weather information which is inapplicable to the Vogtle area. The Vogtle system will include a new trans-mitter at the Vogtle site, which will be controlled from nearby Bush Field. The routine weather information, as well as the 6
weather emergency broadcasts, will therefore be applicable to the Vogtle area. Keast Affidavit, 1 7.
- 9. The automatic activation of the NOAA weather radios within the EPZ due to weather conditions will be limited to l those storm " watches" and " warnings" directly applicable to the t
four counties in the EPZ, as well as the Georgia counties of Screven and Jenkins. Analysis of National Weather Service data indicates that the NOAA weather radios within the Vogtle
. O
?
s EPZ would be activated a maximum of 25 times per year (on aver-age) due to severe weather. Keast Affidavit, 11 7-8.
- 10. Storm watches and warnings in the Vogtle area are j concentrated during " storm season", when oublic awareness is high, and public acceptance of safety in'ormation f at its peak.
Keast Affidavit, 1 9.
- 11. Approximately 93% of storm watches and warnings occur between 6:00 a.m. and midnight, when any disruptive effect of a severe weather message not applicable to an individual listener would be minimized. Keast Affidavit, 1 9. l l
- 12. There is no indication that the credicted automatic ;
activation pattern for the'NOAA weather radios in the Vogtle EPZ will be likely to cause any significant number of house-holds to disable their radios, particularly considering the usefulness of the up-to-date weather information broadcast on a day-to-day basis. Keast Affidavit, 1 9.
- 13. There is no reason to believe that members-of the public would be more likely to retain and use some other tyoe of radio alerting system having no utility on a day-to-day basis. Keast Affidavit, 1 9.
- 14. Even if some EPZ residents did turn off their NOAA weather radios, those individuals would still be warned of an emergency at Vogtle, via the fixed siren system being installed throughout the EPZ. This siren system has been designed to provide a minimum of 60 dBC coverage to all residences within a
a s
the EPZ, in accordance with NUREG-0654/ FEMA-REP-1 (Rev. 1),
" Criteria for Preparation and Evaluation of Radiological Emer-gency Response Plans and Preparedness in Support of Nuclear Power Plants". Keast Affidavit, 1 10.
- 15. No other nuclear plant in the country has installed a public alert / notification system which provides both tone alert radio and fixed siren coverage to all residences within the EPZ. Keast Affidavit, 1 10.
Respectfully submitted, r
, I c
Bruce W. Churchill, P.C.
Delissa A. Ridgway David R. Lewis SHAW, PITTMAN, POTTS & TROWBRIDGE 1800 M Street, N.W.
Washington, D.C. 20036 (202) 822-1000 James E. Joiner, P.C.
Charles W. Whitney Kevin C. Greene Hugh M. Davenport TROUTMAN, SANDERS, LOCKERMAN
& ASHMORE 1400 Candler Building Atlanta, Georgia 30043 (404) 658-8000 Counsel for Applicants Dated: February 14, 1986