a April 4, 1997 4
Southern Nuclear Operating Company, Inc.
ATTN: Mr. H. L. Sumner. Jr.
i Vice President j
P. O. Box 1295 Birmingham, AL 35201-1295 j
SUBJECT:
PLANT PERFORMANCE REVIEW (PPR) - HATCH
Dear Mr. Sumner:
On March 14, 1997, the regional staff completed the semiannual Plant Performance Review (PPR) of Hatch.
The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by regional management to facilitate i
planning and allocation of inspection resources.
The PPR for Hatch involved the participation of all technical divisions in evaluating inspection results 1
and safety performance information for the period from September 1.1996 j
through February 28, 1997.
PPRs provide regional management with a current i
summary of licensee performance and serve as inputs to the NRC Systematic i
Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews.
1 This letter advises you of our planned inspection effort resulting from the Hatch PPR review.
It is 3rovided to minimize the resource impact on your 4
staff and to allow for scleduling conflicts and personnel availability to be i
resolved in advance of inspector arrival onsite.
The enclosure details our inspection plan for the next six months.
The rational or basis for each inspection outside the core inspection program is provided so that you are 4
aware of the reasors for emphasis in these program areas. Resident inspections are not listed due to their ongoing and continuous nature.
During each NRC inspection planned during this period, specific attention will be given to the s erification of selected Updated Final Safety Analysis Report (UFSAR) commitamts. Applicable portion (s) of the UFSAR that relate to t1e inspection activities will be reviewed and verification made that the UFSAR commitments have been properly implemented into plant practices, arecedures i
and/or parameters. The goal is to determine the accuracy of the JFSAR regarding existing plant practices and conditions by providing specific attention to the UFSAR when performing various reactor inspections.
j Inspectors will not be judging the overall completeness of the UFSAR: rather.
the inspectors will focus on identifying differences between the UFSAR 1
description and the plant.
i d
I i
~
l 5
9704170137 970404 PDR ADOCK 03000321 G
PDR l$lflhlllllllfl,lllll,l%
l aa
SNC 2
We will inform you of any changes to the inspection plan.
If you have any opestions, pleaco conte:4 P..b. Skinr.3c at*(404) 331-6299. " -
Sincerely, (Original signed by Pierce H. Skinner)
Pierce H. Skinner, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket 40s.
50-321, 50-366 Licenst Nos.
Inspection Plan cc w/ encl:
W. G. Hairston, III President and Chief Executive Officer Southern Nuclear Operating Company. Inc.
P. O. Box 1295 Birmingham, AL 35201-1295 J. D. Woodard Executive Vice President Southern Nuclear Operating Company Inc.
P. O. Box 1295 Birmingham, AL 35201-1295 P. W. Wells General Manager, Plant Hatch Southern Nuclear Operating Company. Inc.
11030 Hatch Parkway North Baxley, GA 31513 D. M. Crowe Manager Licensing Southern Nuclear Operating Company, Inc.
P. O. Box 1295 Birmingham, AL 352C1-1295 Ernest L. Blake. Esq.
Shaw, Pittman, Potts and Trowbridge 2300 N Street, NW i
Washington, D. C.
20037 cc w/enci cont'd:
(See Page 3) 1
~
SNC 3
cc w/ encl:
Continued Charles H. Badger -
9
~
Office of Planning and Budget Room 610 270 Washington Street, SW Atlanta. GA 30334 Harold Reheis. Director Department of Natural Resources 205 Butler Street. SE. Suite 1252 Atlanta, GA 30334 Thomas Hill, Manager Radioactive Materials Program Department of Natural Resources 4244 Interriational Parkway Suite 114 Atlanta, GA 30354 Chairman Appling County Commissioners County Courthouse Baxley. GA 31513 Thomas P. Mozingo Manager of Nuclear Operations Oglethorpe Power Corporation 2100 E. Exchange Place Tucker, GA 30085-1349 Charles A. Patrizia Esq.
Paul, Hastings, Janofsky & Walker 10th Floor 1299 Pennsylvania Avenue Washington, D. C.
20004-9500 Distribution w/ encl:
H. N. Berkow, NRR K. N. Jabbour NRR P. H. Skinner RII R. P. Carrion, RII PUBLIC Distribution w/ encl cont'd:
(See Page 4)
t I
?
d c.
SNC 4
t j
i Distribution w/ encl:
- NRS Senior. Resident Inspector i
U.S. Nuclear Regulatory Commission r
11030 Hatch Parkway North j.
Baxley. GA 31513
-j b
i 1
j
?
i I
1 l
i i
e 4
2 i
l SEND TO PUetTC DOCUMENT R00M1 L YES NO l
h RII:0RS:E8 RII:0R4MB RII:0RS: SIB RII:0RS;PSB
[
OFFICE RII:.0RP RI
[b SIGNATURE
' NAME RPCarrion:dka PPSkinner WHolland PFreduckson kar l
8 / 97 04 /
/ 97 04 f ] / 97 04 / 1 / 97 04/7 / 97 04 / N/ 97 l
OATE 04 / 0 l
COPY?
M NO YES NO
[YES ) N0 h
NO YES N0 h
NO i
v SEND TO PUBLIC DOCUMENT R00M7 YES NO OFFICE R!l:0RS:0LN,P RilkRPf RII %
I SIGNATURE NAME TPee61 s JJ.ns n Reyes DATE 04 / [ /N
[04 / k / 97/
04 /
/ 97 04 /
/ 97 04 /
/ 97 04 /
/ 97 COPY?
YES
/N0/
/ YES N0/
YES L NO YES NO YES NO YES NO otticir stwkU WFY /
DOCUMLM NAM A:\\h WFKLIR.39/
[
t HATCH INSPECTION PLAN MARCH 1997 TO SEPTEMBER 1997 IP - inspection Procedure TI - Temporary Instruction Core Inspection - Minimum NRC Inspection Program (mandatory all plants)
V I
INSPECTION TITLE /
NUMBER OF PLANNED TYPE OF INSPECTION -
PROGRAM AREA INSPECTORS INSPECTION DATES COMMENTS IP 81700 Security 1
4/14-4/18/97 Core j
IP 62700 Maintenance 1
6/2-6/6/97 Regional Initiative.
Corrective action on i
equipment failures and fol1owup on MR items.
IP 40500 Effectiveness of licensee 4
6/9-6/13/97 Core controls l
IP 84750 Radioactive Waste 1
6/23-6/30/97 Core and Safety Issues IP 86750 Treatment / solid Radwaste 8 f
TI 133 Transportation IP 71500 Balance of Plant 1
7/7-7/11/97 Regional Initiative Inspection l
IP 64704 Fire Protection 1
7/14-7/18/97 Regional Initiative IP Emergency Preparedness 2
8/18-8/22/97 Core 82301/82302 Inspections j
IP 71001 Control Room Observation 1
9/8-9/12/97 Regional Initiative i
IP 37001 10 CFR 50.59 Safety 2
TO BE ANNOUNCED Regional Initiative (NRR and Evaluation Program Resident staff) a f
Enclosure f