Forwards Rev 12 to Organization Plan W/Proposed Changes for Transition to Production Phase of Defueling.Rev Achieves More Efficient Conduct of Defueling Activities & Facilitates Transition Into Future Phases of Defueling.Fee Paid
ML20137U869
Person / Time
Site: Crane 
Issue date: 02/11/1986
From: Standerfer F
GENERAL PUBLIC UTILITIES CORP.
To: Travers W
Office of Nuclear Reactor Regulation
References
0397A, 397A, 4410-86-L-0031, 4410-86-L-31, NUDOCS 8602190362
Download: ML20137U869 (4)


Text

GPU Nuclear Corporation Nuclear

e=s:r8o o

Middletown, Pennsylvania 17057-0191 717 944 7621 TELEX 84-2386 Writer's Direct Dial Number:

(717) 948-8461 4410-86-L-0031 Document ID 0397A February 11, 1986 TMI-2 Cleanup Project Directorate Attn: Dr. W. D. Travers Director US Nuclear Regulatory Commission c/o Three Mile Island Nuclear Station Middletown, PA 17057

Dear Dr. Travers:

Three Mile Island Nuclear Station, Unit 2 (TMI-2)

Operating License No. DPR-73 Docket No. 50-320 TMI-2 Organization Plan - Revision 12 As you are aware, we initiated defueling operatic,1s on October 30, 1985 and are currently transitioning to the production phase of defueling. As such, it is desirable to adjust the current organizational structure of the TMI-2 Recovery Project. Enclosed is a revised Organization Plan for TMI-2 which proposes those changes for your approval.

The purpose of this organizational adjustment is to achieve more efficient conduct of present defueling activities and to facilitate the transition into future phases of defueling by accomplishing the following:

y 1.

Establish an organization with singular responsibility for defueling activities and have this organization report directly to the Office of the Director, TMI-2.

2.

Consolidate the responsibility for all defueling related operations, engineering, and support functions into the defueling organization.

h y

[d D

0 l

P e l l

GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation

'Dr. Travers February 11, 1986 4410-A6-L-0031 The propbsed modifications to the Organization Plan are described separately in Enclosure 2.

The result should be improved operational effectiveness of the TMI-2 organization.

Per the requirements of 10 CFR 170, an application fee of $150.00 is enclosed.

Sincerely,

/

M.ad k2 -

A

)

F. R. Standerfer Vice President / Director, TMI-2 FRS/JJB/eml Enclosures Attached: GPU Nuclear Corp. Check No. 00020382

ORG A NIZ A TION PLAN TMI-2 OFFICE OF THE olRECTOR ENCLOSURE.I TMI-2 DIRECTOR FIGURE I.2 I

DEPUTY DIREC TOR crm,-.

I

~" w.wa~-

M"!h

. divan,

'~s# W ar*

~ggy

,y,mg, i

i

,gf,,h,,.,;,

o,

. "EHA".,

.2ii!".

."n E.

.32!".

..wan..

.nura.

u ns m a art.

'" m a ar-

"'"' flBS'~'

.."'!sE"..

. inn".

-dEh -

i

~w"1%w" EEs.

a.n-i

""Mfyn*"

'"'.wtu

  • l 3.Uf".

(I) A D VISOR Y TO THE OFFICE OF THE DIREC TOR TMI-2 WITH RESPONSIBILITY REVISION 82 AND A U THORIT Y TO NO TIF Y THE OFFICE OF THE PRE SIDEN T OF INADEQUATE CONSIDERA TIONS OF NUCLEAR AND RADIOLOGICAL SAFETY ISSUES.

F r'

ENCLOSURE 2 DEFUELING At present the Project's defueling operations are performed by the Site Operations Department with engineering and systems support primarily from the Recovery Programs Departs;nt.

The defueling functions.of engineering, operations and support will be consolidated into one organization with the single responsibility of defueling. The organization will be directed by a manager who reports to the Office of the Director, TMI-2.

The organization will plan, schedule, perform, evaluate, and report the results of defueling activities. It will also conduct necessary training of defueling workers and develop appropriate techniques and equipment for performance of its work. This group will interface appropriately with other groups to ensure effective communications concerning defueling activities.

The organization will perform defueling activities using Site Operations Department procedures and with the concurrence of the Site Operations Director.

The Fuel Handling SRO's will take direction from the Manger of Operations,

.Defueling Organization, and will discharge their licensed responsibilities under the purview of the Site Operation's Department's Plant Operations Section. The " Hands-On" personnel performing the defueling will remain within the Site Operations Department; however, Fuel Handling SRO's will directly control core alterations.