f' IM O April 10, 1997
's i
Mr. D. M. Smith, President PECO Nuclear Nuclear Group Headquarters Correspondence Control Desk P. O. Box 195 Wayne, PA 19087-0195
SUBJECT:
REQUEST FOR WITHHOLDING OF AN INVESTIGATION REPORT l
Dear Mr. Smith:
in a letter, dated November 13,1996, Mr. J. C. Rullo, the Manager of the PECO Security Division, forwarded to the Regional Administrator, a copy of PECO internal investigation report (PECO File No. 40-80-96-3522) that addressed alleged instances of record falsification at Limerick Generating Station. The letter and its attached affidavit requested j
that the report be withheld from public disclosure, in accordance with the provisions of 10 CFR 2.790. Based on the affidavit, we understand that your request is being made pursuant to sections 2.790(a)(6) and 2.790(a)(7).
i The NRC Region I staff reviewed the investigation report and the affidavit. Regarding your request pursuant to section 2.790(a)(7), the staff denies your request because that section applies only to investigations by agencies involved in law enforcement. Regarding your request pursuant to section 2.790(a)(6), the staff concludes that, while certain information in the report, such as the names of individuals, could be withheld to prevent an unwarranted invasion of their personal privacy, there are insufficient bases provided for withholding the entire report. The staff believes that the investigation report could be redacted in such a manner as to commundte the scope and depth of the PECO investigation along with conclusions reached e.nd the factual bases for those conclusions.
Also, the staff determined that the NRC needs to retain the investigation report as part of its regulatory record for Limerick.
l Consequently, we request that you forward a version of the investigation report to us l
within 60 days that has " bracketed" the specific information you seek to be withheld. We intend to place a redacted version of the report in the PDR and withhold the original report.
0 9704170119 970410 i
PDR ADOCK 05000352 O
PDR lhl,I!ll3llflf(,lkll[,ll,l$
Mr. D. M. Smith 2
f If you have any questions, please call J. Bradley Fewell at (610) 337-5301.
4 Sincerely, James T. Wiggins, Director Division of Reactor Safety
)
Docket Nos. 50-352;50-353
)
cc w/ encl:
J. C. Rullo, Manager, Security, PECO Energy Company G. A. Hunger, Jr., Chairman, Nuclear Review Board and Director - Licensing W. MacFarland, Vice President - Limerick Generating Station J. L. Kantner, Regulatory Engineer - Limerick Generating Station Secretary, Nuclear Committee of the Board Nuclear Safety Informat on Center (NSIC) i Commonwealth of Pennsylvania
Mr. D. M. Smith 3
Distribution w/ encl:
Region i Docket Room (with concurrences)
J. Wiggins, DRS B. Fewell, RC K. Gallagher, DRP D. Screnci, PAO (1)
NRC Resident inspector
]
PUBLIC J
DRS File (2)
I W. Dean, OEDO F. Rinaldi, NRR J. Stolz, PDI-2, NRR Inspection Program Branch, NRR (IPAS)
R. Correia, NRR D. Taylor, NRR l
1 f
DOCUMENT NAME: A: A196212.JTW To rec;ive a copy or this document. Indicate lo the box: *C' = Copy without attaQnt/enclos[
- E" = Copy with attachment / enclosure
- N" = No copy OFFICE Rl/DRS Rl/RC g,
Rff gg, Rl/
Rl/
NAME JWiggins V BFewell(jy DATE 04/03/97 4 04/4/97 T 04/ je7 \\
04/ /97 04/ /97 OFFICIAL REC RD COPY