Forwards SE Re Third ten-year Interval Inservice Insp Request for Relief RR-1-17 & RR-2-21.Proposed Alternative Contained in Relief Requests Acceptable
ML20137U490
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/10/1997
From: Hannon J
NRC (Affiliation Not Assigned)
To: Grigg R
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20137U493 List:
References
TAC-M94982, TAC-M94983, NUDOCS 9704170016
Download: ML20137U490 (3)


Text

l April 10, 1997 Mr. Richard R. Grigg Chief Nuclear Officer l Wisconsin Electric Power Company 231 West Michigan Street, Room P379 4 Milwaukee, WI 53201

SUBJECT:

EVALUATION OF THE THIRD TEN-YEAR INTERVAL INSERVICE INSPECTION REQUEST FOR RELIEF NOS. RR-1-17 AND RR-2-21 FOR POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 (TAC NOS. M94982 AND M94983)

Dear Mr. Grigg:

The staff, with technical assistance from its contractor, the Idaho National Engineering Laboratory (INEL), has reviewed and evaluated the information provided by Wisconsin Electric Power Company in its letter dated March 1, 1996, as supplemented December 6, 1996, and January 22, 1997, regarding alternatives to the ASME Code. The submittal included proposed alternatives as described in Requests for Relief Nos. RR-1-17 and RR-2-21 for Point Beach Nuclear Plant, Units 1 and 2, Third 10-Year Inservice Inspection Program Plan.

The staff has reviewed your request and has determined that the proposed alternatives contained in RR-1-17 and RR-2-21 are acceptable. The staff finds that these alternatives will provide an acceptable level of quality and safety and authorizes their use pursuant to 10 CFR 50.55a(a)(3)(i). The staff's safety evaluation and the INEL Technical Letter Report are enclosed.

If you have any questions, please contact Linda L. Gundrum at (301) 415-1380.

Sincerely, ORIGINAL SIGNED BY John N. Hannon, Director Project Directorate III-l Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation Docket Nos. 50-266 l and 50-301 l 1

Safety Evaluation

Enclosures:

1.

2. INEL Technical Letter Report j cc w/encls: See next page DISTRIBUTION: See attached page ,

i DOCUMENT NAME: G:\WPDOCS\PTBEACH\PTB94982.RR Ta veceive a copy of this document, indicate in the boa: 'C" = Copy without attachme sure *E' = Copy with attachment / enclosure "N" = No copy 0FFICE PM:PD31 E LA:PD31 E OGC '7/f V # D:PD31 }/ l NAME LGundrum:dbg/ff CJamerson @ ( M os.c.a n t JHannonV i ,

DATE ///3 /97 8/ / '1- /97 // y //o /97 f)/1 /97 n ['l OFFICIAL RECORD COPY l U

~

9704170016 970410 PDR ADOCK 05000266 G PDR

l . .

l' l

l' i _

l Mr. Richard R. Grigg Point Beach Nuclear Plant Wisconsin Electric Power Company Unit Nos. I and 2 l cc:

l Ernest L. Blake, Jr.

Shaw, Pittman, Potts & Trowbridge 2300 N Street, N.W.

Washington, DC 20037 Mr. Scott A. Patulski  !

Vice President Point Beach Nuclear Plant i Wisconsin Electric Power Company 6610 Nuclear Road Two Rivers, Wisconsin 54241 Mr. Ken Duveneck )

i Town Chairman j Town of Two Creeks '

13017 State Highway 42 Mishicot, Wisconsin 54228 Chairman Public Service Comission of Wisconsin P.O. Box 7854 Madison, Wisconsin 53707-7854 ,

Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, Illinois 60532-4351 Resident Inspector's Office U.S. Nuclear Regulatory Commission '

6612 Nuclear Road Two Rivers, Wisconsin 54241 Ms. Sarah Jenkins Electric Division Public Service Commission of Wisconsin

, P.O. Box 7854 Madison, Wisconsin 53707-7854 March 1997

.. y Evaluatien of Point Beach Relief Requests RR-1-17 and RR-2-21 l dated: Aoril 10.1997 i DeicketifileC(502266/50-301)2;/

PUBLIC PDIII-l Reading J. Roe C. Jamerson L. Gundrum OGC G. Hill (4)

M. T. Anderson, INEL T. McLellan, ECGB B. McCabe ACRS ,

J. McCormick-Barger, RII,: '

SEDB (TLH3) l j

i l

l 4

1 i

(

i r

I' i 1