ML20137U442

From kanterella
Jump to navigation Jump to search
Mod 4,increasing Obligated Funds & Contract Cost Ceiling,To Technical Assistance in Reviewing Work of Licensee Idvp Contractor for Specific Nuclear Project
ML20137U442
Person / Time
Issue date: 09/24/1985
From: Edgeworth P, Sargent I
NRC OFFICE OF ADMINISTRATION (ADM), WESTEC SERVICES, INC.
To:
Shared Package
ML20137U426 List:
References
CON-FIN-B-8728, CON-NRC-05-85-160, CON-NRC-5-85-160 NUDOCS 8510030149
Download: ML20137U442 (2)


Text

'

f ( [

3. ONTRACT10 CODE PAGE OFPAGES l AMENDMENT OF SOLICITATION /MonlFICATION OF CONTR ACT 3 g g l
2. AMENOMENT/MOOlFICA140N NO. 3. EF F CT4VE DATE 4. R EQU154 T ION / PURCHASE REQ. No. S. PROJECT NO. (if applicable)
6. essuEO ev 4 C///4//8 RFPA No. 0IE-85-160

.<g <f F. AO*AIN65T E R EO BY (f/ other then item 6) . CODE!

U. S. Nuclear Regulatory Commission Division of Contracts Washington, DC 20555

a. NaME AND ADOREss OF CONT R ACTOR <no., et, ret. co.nty, siete .nd zir cod,s g .A. AMENOMENr OF soticiTATiON NO.

WESTEC Services, Inc.

Attn: I. H. Sargent, Vice President ... DAT ED ,3EE ,rEu s si Eastern Operations 2240 Butler Drive, Suite 100 s loa. MOOiFICAT(ON OF CON T R ACT/ ORDER Plymough fieeting, PA 19462 X kk-05-85-160 son.DATEO(SEEITEu 23)

CODE l FACILITY CODE 9/11/85

11. THIS ITEM ONLY APPLIES TO AMENDMENTS.OF SOLICITATIONS The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is entended, is not ex.

tended.

Offers must acknowiedge remipt of this amendment prior to the hour and dete specified in the solicitetion or es amended, try one of the following methods:

(4) By completing items 8 and 15.and returning copies of the amendment: (b) By acknowledging receipt of this amendment on each copy of the offer subrnitted; or (c) By separate letter or telegram which includes e reference to the solicitation end amendment numbers. FAILURE OF YOUR ACKNOWLEDG.

MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS prior TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF 'fOUR OFFER. If by virtue of this amendment you desire to change en offer already submitted, such change may be made by telegram or letter provided each telegram or letter makes reference to the solecitation and this emendment,and is remived prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRI ATION DATA (if reemired)

B&R No. 30-19-06-04 FIN 88728 Increase: $220,000

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS, IT MODIFIES THE CONTR ACT/ ORDER NO. AS DESCHIBED IN ITEM 14.

"'" *"5"*"' ' '""*"'**'""'C"*"'"***' " ' " ' " " ' " * * ^ "'"^"'""'

VI ^' In5 '"8ROER C NO.M Tl5e5Nf.

O. THE ABOVE NUMBEREO CONTR ACT/ ORDER IS MOOtFIED TO REFLECT THE ADMINISTR ATIVE CHANGES (such as changes in paying office.

eppropriation dele, etc.s SET FORTH IN ITEM 34, PUR5UANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT 45 ENTEREO INTO PUR$UANT TO AUTHORITY OFs

0. OTHER (Spectly type of modifseation and authonty) 8510030149 850924 gy X Mutual Agreement of the Parties NR C-05 -160 PDR E. IMPORTANT: Contractor. is not, X is required to sign this document and return 3 Cop;es to the issuing Office.

S e. OESCRIPTSON OF AMENOMENT/MOOlF tCAT 80N (Ortenized by UCF oretion headinee, inetudsng eolicitationteontreet eukieet metter sehere frenible.)

The purpose of this modification is to revise Section G.l., entitled Contract Ceiling and Obligation. Accordingly, the following revisions are accomplished:

Section G.l., - Contract Ceiling and Obligation, is modified as follows:

1. , First paragraph, first sentence is revised as follows:

"The contract ceiling for performance of work under this contract is increased from $1,000,000 by $160,000 to $1,160,000."

E

  • as provided here6n, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in fuit force 1$A. N AME AND TITLE ue blGNER (Type or prinfJ 16A. N AME AND ToTLE OF CONT R ACTING OFFICER (Type or pnnt) fan II. Sargent Paul J. Edgeworth Senior Vice President, Eastern Operations ISB CONTRACT /OF F E R O R 8 SC. OATE SKiNE O 16 fs . T EM 5 T,A S OFg AMf RIC A / 3 6C. O A f t SIGNE L

<5 .t.,

A of py..n e.th.nnd <. ..ans___

1/h / 4 s A yp.t.,

  1. % A c.p eAM w On - , c}//9/bx

/

N5N 7540-01352-so7o e 3o105  ! STANDARD FORM 0 R 10 el

( Contr{ No. NRC-05-85-160

,, Modifution No. 4 Page 2 of 2

2. Second paragraph is revised as follows:

"T.ne am)unt presently obligated by the NRC with respect to this contract is increased from $940,000 by $220,000 to $1,160,000."

All other ternis and conditions set forth under this contract remain unchanged.

4 5

- - - ~, , ~ -,- , , - - - -