f fj,

~

)

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT NO. 85-11 o

APPROVED BY:

/L e__

STATION MANAGER h

860219003G B51130 PDR ADOCK 05000280 R

PDR.

l s

i 1.

~7 r

~

Z a_ _ __..._. u.-

,a

.2

,g _ _ _

m m. m._z.

T.,

8.

Section Page Operating Data Report-Unit #1 1

- Operatmg Data Report - Unit #2 2

Unit Shutdowns and Power Reductions - Unit #1 3-Unit Shutdowns and Power Reductions - Unit #2 4

Load Reductions Due to Environmental Restrictions - Unit #1-5 Load Reductions Due to Environmental Restrictions-Unit #2 6

Average Daily Unit Power Level-Unit #1 7

Average Daily Unit Power Level-Unit #2 7

Summary of Operating Experience 869 Facility Changes Requiring NRC Approval 10 Facility Changes That Did Not Require NCR Approval 10 - 12 Tests and Experiments Requiring NRC Approval 13

, Tests and Experiments That Did Not Require NRC Approval 13 Other Changes Tests and Experiments 14 Chemistry Report 15 Description of AllInstances Where Themal Discharge Limits Were Exceeded 16 Fuel Handling 17818-Procedure Revisons That Changed the Operating Mode Described in the FSAR 19 s

Description of Periodic Tests Which Were Not Completed Within the Time Limits Specified in Technical Specifications 20 1

e L

[

11 Page Section Maintenance of Safety Related Systems During Outage or 21 - 24 Reduced Power Periods - Unit #1 - Mechanical Maintenance Maintenance of Safety Related Systems During Outage or 21 - 24 Reduced Power Periods - Unit #1 - Electrical Maintenance i

Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit #1 - Instrument Maintenance 21 - 24 Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit #2 - Mechanical Maintenance 25 - 33 Maintenance of Safety Related Systems During Outage or 25 - 33 Reduced Power Periods - Unit #2 - Electrical Maintenance

~.

Maintenance of Safety Related Systems During Outage or 25 - 33 Reduced Power Periods - Unit #2 - Instrument Maintenance 4

~

/

I t

w

a-

-. = + -

-s n

ADM-49 p3p 3 ATTACEMEh"I 5 i

Ptg2 1 of 3 OPERATING DATA REPORT FEB 0 21984 DOCKET NO. 50-280 DATE 12-03-85 COMPLETED BT V. Jones TELEPHONE 357-3184 OPERATING STATUS 1.

Urit Name:

Surry Unit 1 Notes 2.

Reporting Period:

11-01-11-30-85 3.

Licensed Thermal Power (MWt): 2441 4.

Nameplate Rating (Gross MWe): 847.5 5.

Design Electrical Rating (Net MWe):

788 6.

Nav h = Dependable Capacity (Gross MWe):

820

[.

7.. Maximus Dependable Capacity (Net MWe):

781 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last j

Report, Give Reasons: N/A 9.

Power Level To Which Rastricted. If Any (Net MWe):

j

10. Reasons For. Restrictions, If Any:

i i

I l

This Month Tr.-to-Date Cummulative

11. Ecurs In Reporting Period 720.0 8016.0 113448.0 i
12. Number of Bours Raactor Was I

Critical 720.0 7191.4 71568.1 i

13. Reactor Reserve Shutdown Bours 0

0 3774.5

14. Ecurs Generator On-Line 720.0 7085.4 70094.5
15. Unit Reserve Shutdown Bours n

n a72n 9 i

16.

Gross Thermal Energy Generated (MWE) 1671198.6 16138807.3 162152984.4

17. Gross Electrical Energy Generated (MWE) 557230.0 5348710.0 52200673.0
18. Net Electrical Energy Generated (MWE)

$29289.0 5075962.0 49491025.0*

1

19. Unit Service Factor 100.0 %

88.4 %

61.8%

l

20. Unit Available Factor 100.0 %

a8.4 %

u b.1 %

)

,21.

Unit Capacity Factor

56. 5 %
  • i (Using MDC Net) 94.1 %
81. 2%
22. Unit Capacity Factor (Using DER Net) 93.3 %

80.4%

60.8 %

23. Unic Forced Rate 0 -

2.2 %

18.9 %

24.

Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

1 Snubber Insnection March 14.1988 - 10 davn 1

I 25.

If Shut Down At End Of Report Period Estimated Date of Startup:

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved i

E Changes made to correct errors in previous years.

INITIAL CRITICALITY

~

INITIAL ELECTRICITY j

COMMERCIAL OPERATION (9/77)

~ i.

~

ADM-49

. Pag 3 2 ATTACHMENT 5 Pegs 1 of 3 1

FEB 0 2 W OPERATING DATA REPORT DOCKET NO. 50-281 DATE 12-03-85 COMPLETED BY. v. Jones.

TELEPHONE Jo/-3184 OPERATING STATUS l.

Unit Name:

Surry Unit #2 Notes 2.

Reporting Period:

11-01-85 to 11-30-R5 3.

Licensed Thermal Power (MWt): 2441 4.

Nameplate Rating (Gross MWe): 847.5 5.

Design Electrical Rating (Net MWe):

788 6.

Mar h Dependable Capacity (Gross MWe):

811 i

7.. yar h Dependable Capacity (Net MWe):

775 8.

If Changes Occur in Capacity Ratings (Items Eumber 3 Through 7) Since Last Report, Give Reasons:

N/A 4

9.

Power Level To Which Rastricted. If Any (Not MWe):

10. Reasons For. Restrictions, If Any:

a l

j This Month Tr.-to-Date Cummulative I

~

11.
  • Lours in Reporting Period 72n_n n n t s.o 110328.0
17. Jumber of Hours Raactor Was Critical 575.9 5192.5 71198.7 i
13. 2eactor Reserve Shutdown Bours 0

0 328.1 14.

Hours Generator On-Line 570.0 5113.8 70021.4

15. Unit Reserve Shutdown Hours 0

0 0

i

16. Gross Thermal Energy Generated (MWE) 1340324.0 11568514.2 163566919.5
17. Gross Electrical Energy Generated (MWE) 443105.0 3725555.0 53016029.0 j

i 18.,. Net Electrical Rnergy Carerated (MWE)-

421297.0 3529308.0" 5024'3446,0 *

19. Unit Service Factor 79.2%

63.8%

63.5%

20.

Unit Available Factor

?. 1 63.8 %

63.3 %

.21.

Unit Capacity Factor (Using MDC Net) 75.5 %

56.8 %

58.5g,

22. Unit Capacity Factor

.(Using DER Net)

'4.3 %

55.9 %

61.6%

23. Unit Forced Rate 1.0 %

.3 %

13.6 %

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Snubber Insnection March 28,1986 - 10 <tavs 25.

If Shut Down At End Of Report Period Estimated Date of Startup:

i 26.

Units In Test Status (Prior to Commercial Operation):

Forecast Achieved

  • Changes made to correct previous years.

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (9/77) j

i 50-280 IX)CKET No.

UNITslIUTi>0WHs ant) POWER REspVC110N5 llNIT NAME Surry 1

  • DA1E December 6 1985 00MPl.ETEl) Ry V. H. Jones REPORT MONill Nov. 85 TEl.Eril0NE (804) 357-3184 "t-t.lcensee

[4, k"L Conse A Coveeceive

.Ij

3. $

Event i

Acehm to l

he.

Date h

g, ak jag Repuet #

j

  • g*

rsevent Recessenice ye F

oE 3

85-17 11-05-85 F

0.0 A

1 Unit was reduced to 79 % power. 630 MW's due to high polisher DP while IF bed was I

removed from service. Polisher was re-f generated and TRS.

4-Unit was reduced to 80 % power,650 MW's j

85-18 11-21-85 S

0.0 A

1 to allow removal of 1-CN-DC-1 A to repair

/

tube leak. Ileater is still 000. Cannot get isolation to allow maintenance of heater.

t i

It l

I 2

3 4

Methat:

Enliibit G. Instancehms F: Fenced Ressan:

5: Scheduled A Equipmene Fallae(6 splein) 1-Menwel for reepseethm of Oss:

5 Maineeseence ett Test 2-Manual Screm.

Entry Sheets fa I.leensee 3-Ameomstic Scram.

Event Reyes (LER) File (NUREG-C.RefueMag 4Oher (Emplain) 0161)

D Reguisemy Resseleties l

E4)peesene Teetning& Uce 'se Emanienstimi 5

F.Administestlee EsMble I-Same Sonoce G-Opesashmst Ereve(Emplain) y tas/77) liehee (Emplaint g

(D i

Cd

.c f

F U.

L)NITsettlit)0 Wits ant)l'OWER REDUCI1ONS u ry 2

  • DA1E December 6 1985 -

COMPLETED BY V. II. Jones REPORTMONill Nov. 85 TELErilONE (804) 357-3184 4

1 3

j

~

g-

  • ** U

(.gcenne g4 g

Cause & Coevective f

k,.

Date E.

  • I

)h Event -

g,i

~

}

Ae880# l#

4 ff j

gg gepas a vO hevent Recuesence

}

85-11 10-19-85 S

144.1 B

1 Unit was shutdown for scheduled snummber outage.

i 85-12 11-07-85 F

5.9 G

3 85-013 Rx trip caused by "B" S/G high level f

which was attributed to inexperience of operator on feed control and poor i

1

'f coordination of personnel. Personnel briefed on importance of coordinationaand using at least one experience operator on feel control.

l i

~

5 5

4

?

?

3 4

3 I

2 Methed:

Enlilbit G. insiewethms 1-Manuel Tw pee psesekni ut D sta l!

F: Fwced Ressen:

i 5: Scliedeled A Eigalpoisent Fallme(Emplain) 2-Mannst Seesm.

Entry $heets fm 1.icensee i<

3-Maintenance of Tess a

3-Ameanistle Sceans.

Event Repat (LER) File INUREG-e C-Refseling 4Ohes (Empieln) 0161) m l

D-Reguissay Resselcelan

- 2 l1 E4)pessem Tosining & IJeense Esseninselon 5

4 4

F-Adadnestesolve Eshlbis 1 5sme Simece i

G-Opeeschmet Esew(Emplain) j P8/77)

IlOhes (Emplain) l i

?

[

.a,. ;.. _ -.. _.

.. ~. _.. _,... _ _ --

P:g25

+

LOAD REDUCTIONS DUE TO ENVIRONMENTAL RESTRICTIONS UNIT NO. 1 MONTH: November DATE TI!E HOURS LOAD, FM REDUCTIONS, IM

?NH REASON'.

None During This Reporting Per od i

{

e dom e

G 0

S D

0 O

MONTHLY, TOTAL l

. ~ -

-- --.---- ----.. -.----..c.

7.

Pcg2 6 I

LOAD REDUCTIONS DUE TO ENVIRONYENTAL RESTRICTIONS

~ UNIT NO. 2 MONTH: November l

DATE-TI E HOURS LOAD. MW REDUCTIONS. W HWH REASON' l

A None During This Reporting Perfod t

l l

s l

l 8

t l

l l

?

6 a

1, h

MONTHLY TOTAL -

r i

.'. * (,

..[.

e i,

3 W EPLO awe A 4 bt D A IL Y uni l Po nE R LE vF L SonRY power 57A710h PHOb4AM N05126Al 12/r2/85 l*.56.07 f:

1,.

  1. E PO SI I NG MONIH - NOviMefe 1995

.h 4

l' 00CRE 7 NO. 50-200 DOLKE7 NO. 90-4A1 OATE DE C E Md E R 2. 1985 sT

. E UMPL E T ED tiv W.

JONFS uN I7 0ME uN I 7 7w0

'{4

(,

AvFuabF DAILY PDwER LEVEL AvFR AGE D AILV PUwfR EfvEL Dav

-MwE-NFT-

- MW E -Ne g.

t '.

1 770 8 0.e 2

770 4 0.n

)

771 6 p.a

);

770.9 0.9 l [ -;

5 714 2 0.0

-) g t t '

6 743 1 0."

l t'

7 755.5 258.1 s

768.7 719 1

.s v

773.1 763.7 i'-

10 769.5 768.5

~

11 775 6 765.1 4-12 775.4 772.3

+

13 775.8 771.4 14 775.0 769.9 14 777.2 769.0 16 778.5 774.1

}l 17 758.9 771 8 Is 778.8 770.9 y

19 777.5 Tie.)

20 TP3 0 767.7 21 644.6 765.6 24 069.9 769.8

?)

612 1 764.9 2,

613 5 766.2

)

2S e50.6 769.8 20 726.0 770.2 27 728.4 766.n

-g Te.1 n

2e 729.3 29 727.9 604.7 10 7?f.0 614.4

's t

i t.

1m

~,

f 1

4

..:.._..__.C.._._.._____..

" ~ _ _

- _m

SUMMARY

OF OPERATING EXPERIENCE Page 8 MONTH / YEAR Nov., 85 Listed below in chronological sequence by unit is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.

UNIT ONE ~

11-01-85 0000 This reporting period begins with the unit at 100 % powcr,805 MW's.

11-05-85 1245 Commenced rampdown at 150 MW/hr. to allow removal of '1F polisher bed.

1350 Holding power at 79 %,630 MW's.

1728 Commenced power increase at 3 % /hr.

11-06-85 0005 Holding power at 98 %,785 MW's due to polishing bldg. high AP.

11-08-85 0942 Commenced power increase at 3 % /hr.

i 1139 Unit at 100 % power, 810 MW's.

11-17-85 0013 Commenced ramp down at 150 MW/hr. to allow cleaning of polish bldg.

strainers.

0109 Holding power at 85 %,700 MW's.

0305 Commenced power increase at 3 %/hr.

0735 Unit at 100 % power, 815 MW's.

. 11-20-85 0443 Commenced ramp down at 150 MW/

to allow removal of 1A polisher bed.

0534 Holding power at 87 %,.720 MW's.

11-21-85 1050 Commenced ramp down at 150 MW's/hr. to allow removal on 1-CN-DC-1A from

]

service.

1125 Holding power at 80 %,650 MW's.

11-25-85 1327 Commenced power increase at 3 % /hr.

1948 Holding power at 95 %,765 MW's.

This reporting period ends with the unit at 95 % power,765 MW's due t$ 1-CN-11-30-85 2400 DC-1A being out of service.

f

= -.. -

I

SUMMARY

OF OPERATING EXPERIENCE p;g; g MONTH / YEAR ' NOV. 85 Listed below in chronological seq'uence by unit is a summary of operating experiences for this month which required load reductions or resulted in significant

.non-load related incidents.

UNIT TWO 11-01-85 0000 This reporting period begins with the unit being coole I down to allow flushing of M OV-RH-2720B.

I 0330 RCS < 350 F/450 psig.

l 1120 RCS >350 F/450 psig.

2100 Commenced RCS cooldown from 540 F. MOV-RH-2720B stillleaking l

past seat.

13-02-85 0205 RCS < 350 F/450 psig.

1125 RCS < 200 F.

11-05-85 1415 RCS > 200 F.

1858 RCS > 350 F/450 psig.

11-06-85 0417 RCS at IISD 2033 Reactor critical.

. 11-07-85 0007 Generator on the line.

0016 Reactor trip caused by high steam generator levelin "B" S/G.

0347 Reactor critical.

l 0610 Generator on the line.

l 0730 Holding power at 30 %,180 MW's for cbemistry.

i

)

1216 Commenced power increase at 100 MW/hr.

11-08-85 1002 Holding power at 98 %,795 MW's due to "C" loop AT protection channel reading 100 %.

11-09-85 0655 Unit at 100 % power,810 MW's.

11-28-85 2112 Commenced rampdown at 150 MW's/hr. to allow removal of 2-FW-E-4A.

2250 Holding power at 80 %,650 MW's.

11-30-85 2400 This reporting period ends with the unit at 80% power,650 MW's.

l 4

k.

FACILITY CHAN"ES REQUIRIN7 NRC APPR" VAL Paga 10 None during this reporting period FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL DC 81-119C NUREG 0696 Short Term IEC Project Data Acquisition System Installation Unitj This design change installed a complete and independent Data Acquisition System (DAS). The DAS provides information to the Energy Response Facilities and the Control Room for improved emergency response per guidelines and recommendations established in NUREG-0696.

SUMMARY

OF SAFETY ANALYSIS The modification provides a separate source of plant status and information, therefore increasing overall plant safety.

DC 81-119D Short Term -IS C Project Data Acquisition System Installation Unit 2 This design change installed the remaining equipment of the Data Acquisition System and their power supplies. The Data Acquisition System profides information to the Emergency Response Facilities and the Control Room for improved emergency response.

SUMM ARY OF SAFETY ANALYSIS The modification provides a separtate source of plant status and information therefore increasing overall plant safety.

- DC 81-119H NUREG-0696 Short Term IEC Project DCP, ERF-1/O, TSC Computer Console Installation Unit 2 This design change installed the Data Communication Processor (DCP), Emergency Response Facilities I/O (ERF-I/0) processor, related computer / display, hardware and peripherals, communications systems, DAS master receivers, and a computer console consisting of seven work stations.

SUMMARY

OF SAFETY ANALYSIS The modification provides a separate source of plant status and information, therefore increasing overall plant safety.

P ga 11 FACILITY CHANCES THAT DID NOT REQUIRE NRC APPROVAL (continued)

DC 83-32 Class IE Transmitter Replacement Unit 2 This design change removed existing safety related electronic transmitters and installed equivalent transmitters that have adequately demonstrated environmental qualification per the guidelines set forth by IEEE Std. 323-1974 and 10CFR50.49.

SUMM ARY OF SAFETY ANALYSIS The modification does not affect the performance of the systems being modified.

Transmitters were replaced by environmentally qualified transmitters with equivalent functional characteristics. Power supplies were replaced with units required for proper performance of the replacement transmitters.

DC 84-07 Auto Actuation of Reactor Trip Breaker Shunt Trip Attachment Unit 2 This design change replaced the reactor trip breaker shunt trip attachment with a component which is safety related QA Category I Class 1E. The reactor trip breaker shunt trip attachment will actuate automatically upon the receipt of a reactor trip signal.

SUMM ARY OF SAFETY ANALYSIS The modification provides a higher level of reliability of reactor trip breaker operation and the operation of the reactor protection system. It will ensure successful operation of the reactor trip system during transient and accident conditions.

DC 64-29 BC 197 Flow Transmitter Replacement Modification Unit 2

- This design change replaced makeup flow-in and letdown flow-out transmitters with transmitters qualified in accenhnce with IEEE Std. 323-1974 and 344-1975.

The replacement transmitters were installed in the same locations and are seismically installed in accordance with manufacturer's instructions.

SUMM ARY OF SAFETY AN ALYSIS The replacement flow transmitters are environmentally and seismically qualified to provide indication to the operator to monitor station operation. Replacement power supplies are qualified to their environment and are required to assure transmitter qualification.

DC 84-83 Appendix "R" Emergency Radio Communication Upgrade Unit 2 This design change added an additional, reliable, emergency radio communications and pager system to meet the requirements to 10CFR50 Appendix R. The new system is located in separate fire zones from the existing system.

SUMMARY

OF SAFETY ANALYSIS This modification enhances the ability of the station to communicato during a fire emergency by the installation of a redundant means to communicato in accordance with the requirements of Appendix R.

P g312 FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL (continued)

DC 84-80 AUXILIARY FEEDWATER PUMP VALVE REPLACEMENT UNIT 2 t

This design change replaced existing auxiliary feedwater pump steam supply valves with valves that have greater seating force. The new valves are full port valves, eliminating a gasket system which was contributing to the valve failures. In addition, a high force piston actuator replaced the existing diaphragm actuator. Both seating surfaces, on the removable seating and the enlarged plug were hardfaced to reduce wear and prevent steam cutting.

SUMM ARY OF SAFETY ANALYSIS The modification is an enhancement over previous t :'.tipment due to improved availability of auxiliary fcedwater pump.

1 5

9

' P ge 13 3

TESTS AND EXPERIMENTS REQUIRING NRC APPROVAL None During TMs Reporting Period TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL None During TMs Reporting Period Y

l I e

t 4

h e

f 9

4 m

m

,7~.__.._.._._.___.,___,_

OTHER CHANGES, TESTS AND EXPERIMENTS

, s,'

4 None During This Repc,rting Period 9

e P

  • @4 k

t 9

9 f

i e

e e

L.
.;' p. r :.

,L..:.-

.L

_L.:

L.:

~... T :. r : ~ - ^ ~

L: g.~

PGt 28-06

<i Pig 3 ' 15 -

+

t VIMINIA PG D r

SURE PGER STATIT i

CHD!IS"'M REPORT 3

s s

t NOWNBER

,19 85 i

4 i

I U:'IT NO.1 LRiIT NO. 2 o

ANAI.YSIS MAXDiN MINDIE AVERNE MAXIEN MINDDI MERME Faross P=M nar-t., uCi/ml 1.88E*0 6.2SE-1 1.15E+0 2.22E-1 1.07E-2 1.12E-1

/

Suscended Solids, pczn 0.00 0.00 0.00 0.00 0.00 0.00 liross Tritim, uCi/ml 1.34E-1 2.95E-2 6.82E-2 7.34E-2 1.92E-5.02E-2 131 Iodine

, uCi/ml 4.80E-2 1.50E-2 2.07E-2 2.70E-2 T6. ole-!

1.19E-4 131 131

)

I

/I 0.49 0.19 0.30 0.32 0.07 0.13 1

' Efya g n, ec/ke 37.9 28.8 31.1 32.8 4.2 (A) 21.5 (A) j l

lJ.thim, pt:In 0.81 0.68 0.75 2.07 1.03 1.37 l

Ebron-10, pczn*

69.2 58.4 63.7 355.5 135.4 195.2 1,

}

0xyoen, (D.O.), txrn 50.005 60.005 60.005 60.005 6 0.0'05 6 0.005 i

o Chloride, ptzn 40.01 4 0.01 40.01 0.14 6 0.01 6.0.02-pH @ 25'C 6.79 6.58 6.72 6.54 5.86 6.10

  • Boron-10 = ' Ictal Boron x 0.196 i

/

l RD92KS tNIT 1: Cat bed was not placed in service this month for LiGI renoval. LiCH was j

not arw el this month. Started ranoing unit down to 83% on 11-5-85 for cxmdensate polish-ina oroblen. Unit back up to 100% 11-8-85.

Rarmed unit down to 80% on 11-20-85 for con--

c x

densate rolishina ornblarts. Unit ha<k up to 95% 11-26-85. Only reached 95% on 11-f6-85 i

i because of Feedwater heater problem. Unit still presently at 95% due to the Feedwa' er

  • t heatar eroblern. tNIT 2: Cat bed was clarwl in service on the following dates fc'r LiOH t.

T 4

l renoval 11-9.111-10. 11-12. 11-14. 11-16. 11-20, 11-24-85. LiCH was ar% =1 to the' unit l

on the followiAo datam 11-5, 11-6, 11-7-85 for a total of 2983 ams.

11-1-85 unit still i

<1<s.m fmm nruihhar inanar+1nn 11-7-R5 imit ranr*1 un to 30% fran outar=.

11-9-85 unit up t

to 100% power. 11-29-85 unit ranped down to 801, for Feedwater heater problans. Unit is presently at 80% for the same problems mentioned.d [(A) 'Ibese' values due to degassing for.

unit shutdown.

i

w ;. _ ;x.a..

DESCRIPTION OF ALLINSTANCES WHERE TH ED

' None During This Reporting Period

+

1-e

+

3 y

FUEL HANDLTNG UNIT 4 I

DATE l

NO. OF ANSI NO.

NEW OR SPENT FUEL HIPPED / RECEIVED ASSEMBLIES PER SHIPMENT INITIAL ENRICHMENT SHIPPING CASK ACTIVITY LEVEL None during this importin t period.

l S

e

. ~..

Page 18 FUEL HANDLING UNIT 4 2 DATE NO. OF ANSI NO.

NEW OR SPENT FUEL HIPPED / RECEIVED ASSEMBLIES PER SHIPMENT INITIAL ENRICHMENT SHIPPING CASK ACTIVITY LEVEL 11-15-85 Spent Fuel 3

LMO422 2.9

< Smrem JA M

Shipm:nt #8 LMO4 0V 2.9 LM0427 2.9

< Smrem 11-17-85 Spent Fuel 3

LM042B 2.9 Shipm:nt #9 LM041C 2.9 1

LM041H 2.9 11-27-85 1

Snent Fuel 9

T.M na nn

-'t 9 Shipment #10 LM040K 3.2 V

^

LM040R 3.2

< 5 mrem y

9 6

e-

.2-....__...._...

P2g2 19 PROCEDURE REVISIONS THAT CHANGED THE OPERATING MODE DESCRIBED IN THE FSAR None During This Reporting Period e

e d

6, 9

i 1

6 T

a 1

+

[

t i

e I

t a

3 ->

w 4

4

/

2

..w - --

Pcge 20 DESCRIPTION OF PERIODIC TESTS WHICH WERE NOT i

COMPLETED WITHIN THE TIME LIMITS i

SPECIFIED IN TECHNICAL SPECIFICATIONS None During This Reporting Period t

b 1

o e

48 9

__.___,i_.--

^

Page 21 '

,4

)

f MAINTENANCE OF SAFETY RELATED SYSTEMS DURING OUTAGE OR REDUCED POWEI: PERIODS UNIT NO.1-I November - 1985 The below listed codes denotes the following departments:

Mechanical 0228 or R03 4

Electrical 0229 or R04 Instruments 0237 or T22

~.

.)

s a

s s

e

/

4 e

a f

9 Y

i b

\\

s n

' ~

2 A-r -

r.

+-

..- - ~

~

.-~~ - -.- -.-.-.

EPC0 SAFETY FILATED DURING FEDUCED POUER SORTED BY LNZT NO IEPARTMENT FROGRAM WPT09860 12/09/85 30217 PAGE 22 FROM 11/21/85 Tmu 11/25/85 UNIT 01 SURW RETIRNED TO,

WO IEPT SERVICE MARK NUMIER M#tBER WO TITLE HISTORY SUMi%RY 0228 11/21/85 01-B3 -MISC-NA 024941 INSTALL SAFETY CHAIN AT TOP OF -IN3TALLED SAFETY CHAIN AND HOOK LADDER 04 LADDER 0228 11/21/85 01-CC -

-658 026280 FiPACK VALVE, NO AD 8JSTMENT REMOVED VALVE BONET AND STEM, LEFT FEMOVED ALL OLD PACKING, REPACKED NO BONNET GASKET IN STOCK.MADE NEW BONNET GASKET WITH 1/16" DLEABLE AND INSTALLED B0 m 0228 A1/21/85 01-CH -

-24 026382 PACKING LEAK.

ADJUSTED GLAND NUTS 2 FLATS. CatA.D NOT CLEAN CRYSTALS OFF VALVE DUE TO LOCATION OF VALVE.

NOTE NO VISABLE LEAK FOUND FRIOR TO START OF JOB 0228 11/21/85 01-CH -

-272 026364 PACKING LEAK.

'WHILE TRYING TO STRAIGHTEN OUT COCKED PACKING GLAND LEFT GLAND

' STUD SNAPPED. GLAND STILL COCKED SLIGHTLY. NOT LEAKING AS OF NOW.

HAD NO VISIBLE LEAK PRIOR TO BEGINI 0228 11/21/95 01-CH -

-273 026383 PACKING LEAK.

CLEANED CRYSTALLS OFF PACKING GLAND AND BONET AND ATTEWTED TO STRAIGH 2

TENED COCKED PACKING GLAND. NUTS BEGIN TO GET HARD TO TURN, STOPPED ADGUSTING GLAND.STILL COCKED SLIGHT 0228 11/21/85 01-CH -MOV -1286C C26363 PACKING LEAK.

CLEANED CRYSTALLS OFF PACKING GLAND AND BONET AND FulND GLAND FOLLDER BOTTOMED OUT, NO AILRJSTENT POSSIBL E. NEEDS REPACKED. NOTE NO VISABLE LEAK FOUND PRIOR TO START OF JDB.

0228 11/21/85 01-CH -MOV -1287C 026374 PACKING LEAK.

-CLEAED CRYSTALLS OFF PACKING GLAND AND BONET. ADJUSTED GLAND MJT S 2 FLATS NOTE! ND VISIBLE LEAK FOUND PRIOR TO START OF JOB 0228 11/21/95 01-SU -TCV -108A 026962 FEMOVE INTEFRALS VALVE BONNET NUTS E RE ONLY HAND TIGHT. REMOVED BONNET NUTS AND ffMOVED VALVE INTERNALS.-INTERNALS ERE BROKE, CHIPPED AND BEAT ON LIKE SOME0E HAD TRIED TO REMOVE TEM 0229 11/22/95 01-FW -

-43 027074 FIINJECT FLE% NITE. 2 DINE VOID COMPLETED ON WO 027083 0228 11/22/85 01-Su -f

-1A 023098 1-SW-P-1A WOULD NOT START NO PROBLEM FOUND 1-SW-P-1A OPERATED SAT WHEN TESTED 11/21/85 FROM TE CONTROL R00M11/22/85 0228 11/23/85 01-BD -TV -100F 027033 MANUFACTURE AND INSTALL TEMPOR-FOUND VALVE NOT BLOWING STEAM.

ARY BARRIER MM NITE AS M EALTH PHYSICS AROUND VALVE TO PREVENT STEAM FROM BLOWING ON CH-HCV-1186 0228 11/25/05 01-IS -MISC-NA 026786 PERMMENTLY MOLNT SIGN NEAR AIR RECIEVED THREE SIGNS FROM PERCY INTAKE ORILLE DAVIS AND INSTALLED i}EM IN AREAS

~IESIGNATED 0228 11/25/85 01-CH -MOV -1275A 027097 MOUNTING BOLTS AFE LOOSE FOLND BOLTS SLIGHTLY LOOSE,TIGHTEE D AS TIGHT AS ECHMIC CONSIDEFED SAFE 0228 81/25/85 01-FC -

-56 015772 VALVE CASING LEAK REMOVED VALVE FROM SYSTEM. CLEANED FLANGE AREA REMOVED 3 RINGS OF

' PACKING AND ALL 4 SEALS. CLEANED VA 4

LVE INTERNALS, VALVE BALL, SEAT ARE IN GOOD CONDITION. INSTALLED NEW 0228 11/25/05 01-VS -FL -3A 027069 BOLT FOR STRONG BACK FOR DOOR. CUT OFF OLD STUD WELDED NEW STUD IN TO FILTER HCUSING BROKEN.

PLACE-

. WELD NEW BOLT TO DOOR i

~~:...--.-.:.~~._.~-.--.1-

.~ -- -

L l.. - -.-

~-

' IPC0 "

SAFITY RELATED IfJRING REDUCED POWER SORTED BY tNIT AND DEPARTENT PROGRAM WPT09860 12/0W85 10:17 PAGE 23

~ FROM 1&/2A/85 Ts u 11/25/85 LNIV ' 01 SURRY RETLRNED TO' WO

]EPT SERVICE MAFE IfJMBER NUhBER WO TITLE HISTORY SUPNARY E29 31/21/85 01-CC -P

-1C 026890 IIENTIFY 4160 CABLE SPARE MOTOR LEADS WERE HANGING DOWN FROM CABLE TRAY. CABLE WAS ROLLED BACK ON TRAY AND MADE STABLE 3229 11/21/85 01-CC -P

-1C 026881 CONDUIT UPN00NED TO RTD FLEX WAS DISCONECTED FROM MOTOR EATER BOX. REPLACED FLEX TO TE MOTOR EATER BOX.NO LEADS IN FLEX 3229 11/21/95 01-CH -HTT -2A3 026870 CK 8 READS 121 DEG. REPAIR AS VOID NO REOUIRED 3229 11/21/95 01-CH -P

-2B 026357 PM - AUTO SCEDULE VOID C0lFLETED ON WO 026839 3229 -22/21/95 01-RP -RP

-B-6 027026 IRPI DRIFTED LOW ) 12 STEFS FR VOID C0lFLETED ON WO 026316 3229 81/21/95 01-SW -MOV -104D 026876 BFEAKER TERMALED WEN ATTEPPT-CHANGED SOLDER POTS BRIDGED 38.1R T1-T2 T24 M.R n-U M N ING TO OPEN 4EG0H1S TO GROLMD ON T2 LEAD. FLA

.95 OPEN AIFS CLOSE.90 T21.0 APPS OPEN /CLOSE 1 1 T3.90 OPEN/CLOSE 3229 11/21/85 01-WT -P

-8 026910 B WELL ftte CYCLES ON AND OFF 1 RIDGE READING T1-T2.79 T1-T3.80 T2-T3.81 APF T.29.5 EGGED 300 PR T2-29.5 X1 TO OROLND T3 28.9 RUN 11/19/85 NO PROBLEM FOLND. EAT ER 1046 LOW AIFS READ 33.6-35.5 IS 3229 21/22/85 01-MS -PCV -102A 027015 REMOVE /FEFLACE LIMIT SWITCH CYCLED VALVE SEVERAL TIES NO Fit 0BLEM. VOID NO M(PERFORED.

ADJUSTED LIMITS A6 PER OPS-SATS 3229 11/25/95 01-BS -MISC-NA 025134 INSTALL OROUND CABLE FOR CRAE MADE UP 100' GPOLMD CABLE AND INSTALLED 3229 11/25/85 01-CC -TV -1093 026699 VLV WOULD NOT CLOSE VALVE WAS CYCLED SAT ON 11/18/85 3229 1925/85 01-SW -P

-1A 026320 BATTERIES SPECIFIC GRAUITY OFF 4608282 STOCK NLMBER SCALEIREPLACE BATTERIES RDtACD BATTRIES AS PE W 3237 12/25/85 01-DA -LI -110A 026707 LI-DA-110A DOES NOT INDICATE TRANSMITTER FOR LI-DA-110A IS LOCAT LEVEL OROP ED IN TE RECIRC SPRAY SLfFN NOT CONTAIMENT SUFF '

')237 11/25/85 01-RM -RMS -131-1 026661 LOW SAMFtE FLOW twt 0VGH MONITOR TROUBLESHOT FLOW VALVE AND ELEENT, ADJUSTED VALVE LIMIT SWITCES, REPOSITION VALVE STEM TO VALVE DRIVE MOTOR. EXAMIED YALVE LIE LP FOR FLOW, FOUND FILTER ISOLATED 3237 11/25/85 01-RM -SV -111 027010 REPAIR /REFLACE GM. TUBE REFtACED GM TUBE. PERFORED CAL 045. CK SAT.

3237 11/25/85 01-RP -ANN -NA 025868 ROD BANK D LO & EXTRA LO LIMIT FOUND PA CONVERTER FOR BAMC D READI NG ZERO STEPS. MANUALLY PtLSE TE P TO A CONVERTER UP TO TE SAE INDICATION AS TE STEP COLMTERS FOR BANK D ALARM RESET.

r37 11/25/85 01-VG -RI -131-1 026704 INVESTIGATE AND REPAIR CAUSE CECKED RECORDER CHARTS ON RM-131-1 FOR LAMP BLINKING ON AND OFF FOR MCI /CC AND RATE RELEASE.RECGtDS SHOW A 72 HOUR PERIOD OF CONTINIOUS ACTIVITY. TE RATE ACKKNOW EDGE ALARM IS SET TO SHOW A RAPID 4

t

Fifa &_A _,_.:..

..u.. 1. i~_...~ _ a -..-. _ _

o~,c_-..._..

,_..a_-

u EPCO SAFETY RD.ATQ NURING prrami FfjWER SORTED BY UNIT AND IEPARTNENT FROGRAM WPT09960 '12/09/85 10:34 PAGE -24 FR(M 11/29/95 TEU 11/30/85

?.

LMIT -01 SLERY i

DEPT..RETLR O TO.

WO

.WO TITLE-HISTORY SUtttARY SERVICE MARK NJMBER NUMBER

'C237 '11/29/95 01-CC -P

-1A :-

027036 FEMOVE/ INSTALL THERM 0 COL 5tES REMOVED 01-CC-P-1A OUTBOARD T/C 11/26/85. INSTALLED T/C CHZCKED C0tFUTER POINT. OP SAT.

' ND (F REPORT i:

e

-b, n

9 O

r i,

.h ;

4 O

3 r

E

+

's

-i t

i 9

i t

,r v v

_ _ _ _. 1 _... _

~

, ~. _,.. _..... _

.~~_m..._..

P2g3_25 MAINTENANCE OF SAFETY RELATED SYSTEMS DURING OUTAGE OR REDUCED POWER PERIODS UNIT NO. 2 November - 1985 The below listed codes denotes tile following departments:

Mechanical 0228 or R03 Electrical 0229 or R04 0237 or T22 Instruments D

- i e %

A t -

t s

)

.. - ~. - -

s

eft 0 SAF'ETY RELATED DUR NG REDUCED F0WER SORTED BY LNIT MD DEPARTMENT FROGRAM WPT09060 12/09/85 10:26 PAGE 26 FROM 1VOU85 THRU 11/07/85 LNIT 02 SURRY RETLRNED TO WO DEPT SERVICE MARK NUMBER NutiER WO TITLE HISTORY SLNMARY 0228 11/0U85 02-CH -E

-2 020127 RCMOVE BOLTS RE NIE IN3FECTION CHANGE SWD'S ONE Tmu 36 OE AT A TIME

-0228 1V0UC5 02-CW -MOV -200A 025624 MANUAL LEVER WILL NOT DISASSEMBLED ONLY TO TRIP PIN,FOUND DISENGAGE -

IT BROKEN OFF, REFLACE EAR AND TR IP PIN. TESTED SATISFACTOR.

0228 11/0U85 02-FW -FCV -2488 025139 PACKING LEAK REMOVE OLD PACKING FUT IN EW PACKI NG 9 RINGS 0228 12/0UB5 02-MS -

-158 005252 REFUPBISH SEATING SURFACES VOID COMPLETED ON WO 019830 0228 aV0U85 02-MS -TV -201A 020100 FFACK VALVE PER TYFi A,B,AND. VOID COWLETED ON WO 020208 0220 12/01/95 02-MG -TV -201B 021980 HOLE IN 90DEG ELB04 HAS BEEN REPLACE 3/4" ELBOW WITH EW (CDPPE R)

, 0228 11/01/85 02-RC -

-133 026104,2g'gy HAS 7 MOFfiD TIGHTENED FLANGE 0228 1V01/95 02-RC -

-50 026109 SMALL BORIC ACID LEAK ADJUSTED PACKING 0228 12/01/85 02-RC -E

-1A 019207 FEMOVE ALL INSULATION FROM ALL VOID FERFORMED BY SERVICE REQUEST 0228 1VOU85 02-RC -E

-1C 019205 REMOVE INSULATION FROM ALL VOID PERFORED BY SERVICE REGLEST 0220 1VOUBS 02-RH -HOV -2700 020538 LEAK AROUND STUFFING BOX FOR ADJUSTED PACKING GLAND NUTS 1 1/2 T PACKING LRNS MS E NOT TIGiT AT EGIMI NG 6

0228 11/0 U85 02-SI --MOV -2867C 017810 VALVE LEAKS BY, WILL NOT CLOSE VOID COMPLETED ON WO 018316 0228 11/0U85 02-SW -EJ -204D 026028 EXPANSION JOINT PROTECTIVE COV INSTALLED COVER ER WAS NOT REINSTALLED 0228 1UO3/85 02-RH -HOV -2720B 026183 PM - ON E MAND VOID NOT REQUIRED AT THIS TIE TO B E WORKED EXT OUTAGE 0228 11/04/85 02-DA -TV -200B 025759 INVEST / REPAIR AS RED.

VOID NO FROBLEM FOUND 0228 12/04/85 02-RC -

-105 026105 20 DROD PER MIN PACKING LOOP ADJUSTED PACKING GLAND AS TIGHT AS IT WO(LD GO GLAND IS BOTT0ED OUT-L EAK APFEARED TO STOP 0228 aV04/85 02-RC -

-77 026165 ADJJST PACKING ADJUSTED PACKING ABOUT 1/2 FLAT ON EACH NUT UNABLE TO GET ANYMORE ON N UTS. NOT ABLE TO STOP LEAK 0228 1UO4/85 02-RC -E

-2 025987 MANWAY LEAKING TRY TO TIGHTEN TORGED TO 1800 FT. LBS. DIDN'T STO P LEAK REFLACE FLEXATILIC GASKET PR OCEDURE MMP-C-RC-099 REPLACED 11 B0 LTS SN 22900450 0228 1UO4/85 02-FC -HOV -2592 025668 PACKING LEAK OF 14 SPM TO PDTT REMOVED OL PACKING - 4 RINGS IN LPP UNACCEPTABLE ER SET, 5 RINGS IN MIDDLE SET AND 6 RINGS IN LOWER SETS ALL PACKING WA S REMOVED.

0228 1UO4/85 02-SS -TV -201A 020695 VALVE WILL NOT STAY OPEN ADJUSTED MICRO-SWITCES ON VALVE. V ALVE CYCLE AND LIGHTS INDICATION SA T.

0228 11/04/85 02-VS -f

-60B 025886 DAHetR DOESN'T OPERATE RAN B FAN DAMPER DID NOT OPERATE. S OLEN0ID THAT PROVIDES AIR TO DAWER ACTUATOR WAS CONNECTED ACTUATOR TO MAIN AIR SUPFtY AND ACTUAT(R WOULD NOT OPERATE ACTUATOR WAS LEAKING 0228 1U05/85 02 -MISC 026264 HATCH WILL NOT SEAL R*_ MOVE 0-RINGS AND REPLACED 0-RINGS FOR HATCH GROVES AND INSTALLED AND LUBRICATED WITH 0-RING LUBE

--m-

. UC0 -

SAFETY RELATED DLRING REDUCED POWER SORTED BY LNIT AND DEPARTMENT Fft0 GRAM WPT09860 12/09/85 10!26 PAGE 27 '

FROM 11/01/85 THRU 11/07/85 UNIT 02 StjRRf RETLRED TO WO

-DEPT SERVICE.

MATK NUMBER NUMER WO TITLE HISTORY

SUMMARY

! 0228 11/05/95 02-BS -DR -HATCH 026298 lt#EST/REDAIR INNER HATCH HYDR REMOVED EXISTING HYI6tAULIC CYLINER ALIC PUMP ~

AND INSTALLED NEW ONE. EW HYDRALLI C CYLINDER COMES AS A COPFtETE UNIT FROM MANUFACTUR OIL IS ALSO PUT IN BY BEM.TE ONLY WORK IS TO MOLNT l0228 11/05/95 02-CH -E

-2 024926 PEFf'ARE BOLTING (CUT) FOR CUT 36 STUDS TO 14 3/4" LONG AND CH NON PEGERATIVE HEAT EXHCANGER AEER ENDS BY QC WITESS

[2-CH-E] HAVE QC VERIFY 0228 11/06/85 02-CH -HCV -2310 021969 BODY TO BONNET LEAK, FtVME 2 REMOVED BONNET FOUND GASKETS BAD AN D 4 M GRADATED STUDS. REMOVED STUDS TO 3 FT*

1 WRUNG OFF. DRILLED AND TAFTED HDLE REFLACED STUDS. REASSEMBLED VALVE USING HEW GASKETS. REPACKED VALVE 0228 11/06/85 02-FW -

-74 025678 INSPECT VLV INTERNALS IN LEIU' REMOVED VALVE COVER FOR E LDERS OF PT 15.3 AND ENG AFTER ENG LO(EED AT VALVE AND ELDERS ELDED DIAPHtAGM BACK IN MECH INSTALLED COVER BACK ON VALVE AND TQ BODY BOLTS TO 600 F1LB 0228 11/06/95 02-RC -MV -2456 024450 VALVE LEAKS BY SEAT DISASSEMBLED VALVE INSPECT VALVE REFLACED STEM AND CAGE REASSEMBLED VALVE AND INSTALLED 0228 11/06/85 02-FH -HOV -2720B 026129 VALVE LEAKS BY, CLEAR SEAT-DISASSEMBLE VALVE LAP SEAT AND DISC BLOCKAGE AS ECESSARY HAVE 100% BLLE 0228 11/07/85 02-MS -

-200 026314 PACKING LEAK ON TRAP DRAIN ADJUSTED PACKING NO LEAKAGE ISOLATION VALVE 0228 11/07/85 02-RC -

-11 026107 VLV HAS SMALL PACKING LEAK -

ADJUSTED PACKING-0228 11/07/05 02-RC -HCV -2557C 026102 SMALL BORIC ACID LEAK AROUND YOID FLANGE TO E WORKED LNDER soLTs WO 021262 0228 11/07/95 02-RH -P

-1A 021092 SEALS LEAK VOID SEALS TO BE WORKED IN-CONICTION WITH WO 9025756 11/7/85.

0228 11/07/85 02-RS -MOV -255B 023948 CLUTCH BOX LEAKING TIGHTEN TOP BOLTS AND WIPE LP 4

EXCESS GREASE

.0229 11/01/85 02-BD -TV -200D 025966 TRIP VLV WILL NOT CPEN FOUND RELAY AFP3-4B RELAY BAD. INST ALL EW RELAY TESTED SAT 2 0229 11/01/85 02-CH -HCV -2200A 025657 DISCONN/FECONN LIMITS FOR ECH REMOVED AND REINSTALLED LIh1TS FOR ECHS/NO LIMIT ADJUSTFil WAS ECES SARY 0229 11/01/85 02-CH -HCV -22008 025659 DISCONNECT / RECONNECT LIMITS REMOUNTED LIMIT SWITCH PLATE AND AD-FOR MECH.

JUSTED LIMITS TO OPS SATISFACTION.

0229 11/01/95 02-CH -HCV -2200B 025996 Go0VND OCCURS ON DC BUS WEN DISCONNECTED PLUG 5 ON FEETRATION H-CV-2008 is opened 13E READ WIRES F(Nt EV-2200B; ALL W -

s IRES READ SAT EXCEPT FOR M IMICH WA S GROUNDED i

0229 11/01/85 02-CH -HCV -2200C 025658 DISCONNECT RECONNECT LIMITS REMOVED AND REINSTALLED LIMITS FOR i

FCR MECH.

HCV-CH-2200C

0229 11/01/05 02-CH -MOV -2270A 026110 PM - ON IEMAND CLEANED SWITCH,INSLL TEST T1-T2-38.81 T2-T3 38.73100Nt T1-T3-38.76 AND INSPECTED 11/1/85

-0229: 11/01/85 02-CH -P

-1A 025865 AUX OIL FtMP CYCLES ON AND OFF VOID WILL DO WHAT EnR 84-48 SAYS 0229 11/01/25 02-EP -BKR -24J9 026070 CHARGING SoRINGS WILL NOT FOUND THE MOTOR CRANK AXIS AND RAIA.

CHARGE CARRLIER WAS OUT OF SE0LENCE. ROTA TED MOTOR CRANKRAWL CARRIER. COEL ETED ALL ECESSARY STEPS OF PROCEDU

.: % w i L u l.

l

-._ - -.l.--

O L.:

s

~PCD SAFE;TY RCLATED IWNG REEED POWER SORTED BY UNIT AND DEPARTMENT PROGRAM WPT09860 12/09/85 -10826 PAGE 28-

'FROM 1V01/85 Tsu 31/07/85-LMIT 02 SWRY RETIRED TO WO-DEPT SERVICE MARK NUMBER HUP.IER WO TITLE HISTORY SUPMARY RE CECKED SAT l

0229 1V01/95 02-FW -MOV -251A 025950 INSFECT AND INSTALL T-DRAIN IF REFtACED CLD PLUGS WITH 2 BREATER.

PLWS IN MTR.

I REQUIRED 0229 11/01/95 02-FW -MOV -251B 025949 INSFECT AND INSTALL T-IRAIN IF REPLACED OLD PLUGS WITH 2 BREATER REGUIRED FtUGS IN MTR

,0229 11/01/95 02-FW -MOV -251C 025948 INSFECT A@ INSTALL T-DRAIN IF REPLACE OLD' PLUGS IWTH 2 BREATER P REQUIRED LLES IN MTR.

-l 1

i 0229 81/01/95 02-FW -HOV -251E 025946 INSFECT MD INSTALL T-DRAIN IF REPLACED OL PLUGS WITH 2 BREATER P REQUIREo LWS IN MTR.

+ 0229 AV01/85 02-NS -50V -202B 006651 IND'ERABLE ELECTRICIAN TO YOID COPFLETED ON WO 020543 INVESTIGATE

' 0229 81/01/85 02-NS -MOV -201A 020402. CECK TORQUE SWITCH SETTINGS

- VOID C0pftETED ON EM-85-224A RAW EMP-C-MOV-M3

, 0229 2V01/95 02-NS -MOV -201B 020401 CECK TODOLE SWITCH SETTINGS VOID COPFLETED ON EM-85-224A 0229 11/01/95 '02-RC -MOV -2535 020364 LNDOIb SETTINGS VOID C0lFLETED ON WD 024079 IAW EMP-C-MOV-143

0229 11/01/95 02-RC -MOV -2586 020363 CECK TOR 9JE SWITCH SETTINGS VOID C0rFLETED ON WO 024082 IAW EMP-C-MOV-143 0229 11/01/85 02-RC -MOV -2595 020756 MOTOR DOESN'T OFERATE, APPEARS VOID COPFLETED ON WO 020992 0229 AV02/85 02-RH -MOV -2720B 026186 PERFORM MOVATS TESTING ASSIST NOVATS WITH TESTING MOV. COM FtETED PROCEDURE EPF-C-MOV-151 0229 11/03/95 02-CH -MOV -2270B 025098 RESET TORQUE SWITCH IAW EWR 85-RESET TOROLE SWITCH /MADE MCC MODIFI 22ea CTION/ CYCLED VALVE SAT. 11-04-85 0229 11/04/85 02-BS -DR -HATCH 025789 SWITCH SPRUNG STAYS IN MID LIMITS OUT OF ADAISTENT AND TEST S 4

j Postitm OLE 01D MD OPERATE APS CLOSING OF j

FEN 0229 11/04/85 02-CH -NOV -2270B 026112 Pfl - ON DEMAND INSPECTED CHANGED TOROLE SWITCH SETTING AS PER 85-261.11/3/85 PERFORED PMS/ CYCLED VALVE SAT 11/4/85 I

0229 11/04/85 02-CH -MOV -2275C 026176 PM - ON IEMAND REPLACED OL CHANGED T(ROLE SWITCH SETTING. INSP 11/4/85 PERFORED PMS/ CYCLED VALVE SAT 11/04/85 j 3229 11/04/85 02-CH -POV -2289B 025916 ELECTRICALLY DISCOPMECT DISCOPMECTED MOTOR LIMITS AND TOROU i

E SWITCH.

3229 11/04/85 02-CW -NOV -200A 025104 RESET TOROUE SWITCH IAW EWR 85-REFtACED OVERLOADS AND RESET T(ROLE i

224A SWITCH /ADJSTED LIMITS / CYCLED SAT 3229 11/04/85 02-DA -TV -200A 024429 AjuuSTfMgAIRVALVEINDICA-DISCOPNECTED SOV AND INDICATIPE LIG IN 8-HTS ASSEMBLY EED 7/16 MJT IRIVER A ND SMALL 6 IN ADAISTABLE WEN 20KI l

NG BACKlP 3229 11/04/85 02-EPL-IER -24H11 024355 REFtACE IREAKER TE BRK WE TOOK OUT OF TE CUB. WAS TESTED AND IT CECKED SAT.

3229 12/04/85 02-eft-BKR -24H16 024354 TEST BREAKER FOR FfDPER SET-BREAKER WAS RACK IN TO FU.L COPM. P POINTS OSITION AS CFEM SAT.

1 0229 1V04/85 02-FW -MOV -251D 025947 INSCfCT AND INSTALL T-DRAIN IF REPLACED OLD PLUGS WITH (2) BREATE REQUIRED R PLUGS IN MTR I 0229' 11/04/95 02-FW -MOV -251F 025945 INSEECT AND INSTALL T-IRAIN IF REPLACED OLD PLUGS WITH 2 BREATER REQUIRED FtuG IN MTR-0229 11/04/85 02-RC -MOV -2535 025876 RESET TORGUE SWITCH CECKED TOROUE SWITCH SETTING AS PE f

m__.__

EPC0 SAF'ETY RELATED.IGING REDUCED FWER SORTET) BY UNIT AND DEPARTMENT FROGRAM WPT09860 12/09/85 10223 PAGE 29 FROM 1V0V85 Tm u -11/07/85 UNU 02 SURRY RETlRNED TO WO DEPT SERVICE MARK NUMBER NUMBER WO TITLE HISTORY

SUMMARY

R EMP-C-MOV-063. SETTINGS CORRECT.

VALVE CYCLED SAT 0229 11/04/85 02-RC -PCV -2456 025304 REPS /E LIrtITS FOR MECH.

REMOVED LIMIT SWITCES FROM VALVE.

REMOUNTED LIMIT SWITCES AND CYCLED

~

VALVE FOR LIGHT INIDICATIONS - TES TED SAT RETURNED TO SERVICE 0229 11/04/85 02-SI -MOV -2863A 025903 MOTOR SEAL LEAKING MOTOR WAS CLEANED AND PROFDLY MARK ED NO ACTUAL SEAL FOLND LEAKING 0229 AV04/95 02-SI -MOV -2869A 025108 FESET TORQUE SWITCH IAW EWR 85 SET TOROUE SWITCH AT 2 0 FEN AND 2 L 224 OSE. CYCLED VALVE ELECTRICALLY VALV E OFERATED SAT 0229 11/04/85 02-SW -P

-10A 025545 DISCONNECT / RECONNECT FOR DISCONNECT MOTOR 10-21-85. RECDPeEC MECH. REPAIRS TO PLNP TED MOTm LEADS - BRIICED/EGGDED.

CH 10-24-85. LEAK CECK OK.

0229 11/05/85 02-RI -ANN -A-A-8 025163 ALARM WILL NOT RESET, REFLACED CARD ALARM STILL IN. VERIF IED CHANNEL OPERTION AND ACCLEACY, OP. SAT. RESET ALARM OP SAT 0229 SV05/85 02-SI -MOV -2842 025111 FESET TOFOJE SWITCH IAW EWR 85* CHANGE TORQUE SWITCH SETTING 224A INSTALLED EW DVERLOADS AND MAKE WIRING CHANGE. NEW TORGE SWITCH SETTINGS 2.5 AND 2.5. CH CAT 4 1035 TERMAL OVERLCAD EATERS P0tSY14381 0229 11/05/85 02-SW -MOV -206A 025121 FESET TOR 0tE SWITCH IAW EWR 85-RESET TORQUE SWITCH TO OFEN 21/4 224A CLOSE 21/4. REPLACED EATER COILS TO 1031H 0229 11/06/85 02-CH -MOV -2275C 025101 FESET TOROUE SWITCH IAW EWR 85-89.5 FILLED OUT. CHANGED OL AS FER 22*A 85-261 CHANGED TOROUE SW SET 11/3/8 5 VALVE CYCLED SAT 11/3/85 OVERLOADS (2) 4607304 0229 11/06/85 02-EP -BKR -24H2 026069 CHAFSING SPRINGS WILL NOT FO'JND TE MOTOR CRANK AXIS AND RAll CHARGE CARRIER WAS OUT OF SEQUENCR. ROTATE D MOTOR CRANK RAWL CARRIER.

0229 11/06/85 02-EFH-BKR -NA 025836 INSFECT THE 4809 PTAKER REPLACED BREAKER AND BRIDGED AND MEGGERED. AW READINGS AND PROCEDUR E CO @ LETE 10/25/85 BREAKER (1) FB3040 0211717 0229 1UO6/85 02-RC -MOV -2536 024080 VERIFY /MUDIFY MCC CONTROL CIR-CHANCED WIRING ON MOV-253610/20/85 CUITRY PER EWR 85-018 RESET TORGIJE SWITCH TO 2.5 NEN 2.5 CLOSE. 10/2 U85 MOVAT TEST COMFtETE 0/L CHANGE CONtETE OVERLAODS (2) 1024 (4607296) 0229 1V06/85 02-SU -HOV -202D 025113 FiSET TOROUE SWITCH IAW EWR 85-CHANGE TOROVE SWITCH SETTING 10/22/

B5. CHANGED TERMAL OVERLOAD EATER 224A S 10/22/05 NEW TOROUE SWITCH SETTIN G 4 AND 4. CYCLED MOV ELECTRICALLY VALVE OPERATED SAT. 10/22/85 EWR-0229 11/06/85 02-SW -MOV -204C 025116 FiSET TOROUE SWITCH IAW EWR 85-RESET TOROUE SWITCH SETTING TO 1.5 224A 10/21/85. VALVE WILL NOT CYCLE.

RESET TOROUE SWITCH TO ORIGINAL SWI TCH TO ORIGINAL SETTING 10/24/85 OFEN 2 5 CLOSE 2.0. COMPLETED ALL 0229 AU06/85 02-SU -MOV -205C 025119 RESET TOROUE SWITCH IAW EWR 85-COMFtETED ON EWR-85-018 P2 TO STEP 224A 5.9. COMPLETED EW-C-MOV-063 TO STEP 6.0 COMPLETED EW-C-MCC-152 TO STEP 6.0 10/24/85. COTLETED ALL FROCEIGES 10/25/85. ANS EXCEED

'I

_w -.~

- - ~. - -. - -. -. -. ~ ~ - -. - - - - - - ~ - -

=. -

. EPC0 -

SAFITY RELATED ILRING REDUCED POWER SORTED BY UNIT AND DEPARTENT PROGRAM WPT09860 _12/09/95 10!26 PAGE.30 FROM 11/0s/85 Tm u 11/07/85 t#4IT.02 SLRRY RETLRED T3 WO IEPT-SERVICE MARK NUMBER NL22ER Wu TITLE HISTORY Sl#9tARY 0229 11/07/85 02-BS -DR -HATCH 026297 DISCONNECT / RECONNECT AS REQUIR DISCONNECTED MOTOR,pn trrsn LEADS ED BY MECH. MAINT.

TElf CONECTED DUE TO PLUG 6DLDN'T COE OUT, REMOVED PLUG, RECOP8ECTED LEADS, TEST SAT 0229 18/07/85 02-CH -HCV -2310 021096 VALVE WILL NOT FU LY OPEN VOID VALVE TO BE REPLACED l#EER 025956 0229 11/07/85 '02-CH -MOV -2267B 02b094 FESET TOROUE S4! ITCH IAW-EWR 85-SET TORGE SWITCH AT 2.5 0 FEN AND 224A 2.5 CLOSED 10/24/85 INSTALLED IN-HIGH POSITION. CYCLED VALVE, CECKE D FOR LIGHT INDICATION EVERTHING SAT AS PER Elf-C-MCC-152 0229 11/07/85 02-CH -MOV -2269A 025095 RESET TOROUE SWITCH IAW EWR 85-RESET TOROUE SWITCH SETTINGS TO 2.0 224A OPEN AND 2.0 CLOSE. RELANDED RED X2 LEAD TO TE "B" POSITION BY J

PROCEIGE CYCLED VALVE FIR LOAD CECK LIGHT INDICATION WAS CORRECT 0229 11/07/05 02-CH -MOV -2286A 025102 RESET TORQUE SWITCH IAW EWR 85-TOROVE SWITCH SET 2 OPEN 2 CLOSE OVERLOAD EATERS CHANGED AN X2 MOVE 224A D 10/23/85 VALVE CYCLED SAT 10/24/8 t

5 WORK PERFORED IN ACCURDANCE WITH TE LISTED EW'S 0229 11/07/85 02-CH -h0V -2286B 025222 REELACE OVERLOADS AS PER EWR - TOROVE SWITCH SET AT 2 (PEN 2 CLOSE 85-25 10/23/85. OVERLOAD EATERS CHANGED AND X2 MOVED 10/23/85. VALVE CYCLED SAT 10/24/85 OVERLAOD EATERS (2) 1033 4607302 0229 11/07/85 02-CW -MOV -200A 025626 DISCONNECT AND REMOVE MOTOR DTSCONECTED MOTOR LEADS AND REMOVE D MOTOR FROM VALVE.10/20/85.SUBMITT LD WO TO CECK CAUSE OF HIGH APPS 4299237 REC 0l#ECT MOTOR AND BRIDGE AND EGGERED. CECKED SAT CYCLED l 0229 11/07/85 02-RC -MOV -2586 024082 VERIFY / MODIFY MCC CONTROL CIR-CECKED TOROUE SWITCH ALREADY SET CUITRY PER EWR 85-018 AT 2 1/8 OPEN AND CLOSE.NO READ.AIST MENT WAS NEEDED. REPLACED GA9KET.

SUBMITTED WO TO MECHS ON HANDEEEL COMPLETED X2 LEAD HOOK-UP AND INSTA 0229 11/07/85 02-RC -MOV -2587 024083 VERIFY / MODIFY MCC CONTROL CIR-REPLACED OVERLOAD EATERS AS PER cuitry per EWR 85-018 EWR 85-261 RESET TOROLE SWITCH TO EW SETTING AS PER EPP-C-MOV-63 MAIE INDICATING LIGHT MODIFICATIONS AS PER E6R 85 018 0229 11/07/85 02-RH -MOV -2720B 026118 VALVE LEAKS BY, DISCOPO4ECTED AND NOTIFIED ECH DEPT 11/2/85 RECOP6ECTED RH-PWY-2720B 11/4/85 RESET TOROUE SWITCH (PEN 1 3/4 AND CLOSED 1 3/4. T1 T2-2.805 T2-3-2.833 T1 T3-2.852 EGGER 0229 11/07/85 02-RI -MISC-NA 025892 EWR 25-563 FILOCATE REVERSE INSTALLED AND PERFORED ER 85-563 power indication SATISFACTORY. WIRE USED: SIS 600Y #

14 AWG P06SYO7644 PART/ STOCK t SL-57275-IEEE-383-74. LUBS USED 20-14 8-10 STUD P0015922 PART/ STOCK 0229 11/07/85 02-RS -M0J -255B 0251T7 ASSIST POJATS IN TESTING VALVE FERFORED E!P-C-MOV-152 COPFLETED TEU 5.9. REPLACED DVERLOADS EATER S AND TESTED VALVE WITH MOVATS 2-EATERS 1036 4607305 0229 11/07/85 02-SW -HOV -202A 025112 RESET TOROJE WITCH IAW EWR 85-COMFtETED PROCEIURE EPP-C-MCC-152 224A REPLACEENT OF YOL'S IN MCC-2H1-131 C0fftETED Fit 0 t EfF-C-MOV-063 l

u.

..a.s,_..__2--~,__

- _,, _ _. _ _ _ _ ~. _..

EFC0 SAFETY RELATED DURING REDUCED POWER SORTED BY LNIT AND DEPARTMENT FROGRAM WPT09860 12/09/85 10:26 PAGE 31

- FR0rt.11/01/85 THRU 11/07/85-UNIT 02 SLRRY RETlRNED TO WO IEPT SOWICE l%RK NUtiBER HUMDER WO TITLE HISTORY SUltiARY TOROUE SWITCH ADJUSTENT RESET TORQUE 4 OPEN 4 CLOSE COPFLETED PRO 0229 11/07/85 02-5W -n0V -204A 025114 RESET TORQUE SWITCH IAW EWR 85-COMPLETED PRO EW: 85-018-92 CHANGED 224A X2 WIRING FOR INDICATION LIGHT MODIFICATION. C0lFLETED PROCEDLRE EMP-C-MCC-152 CHANGED TOL'S FOR EWR 85-261 EATER OVERLOAD PROTECTI '

0229 11/07/85 02-SW -h W -204B 025115 RESET TDR00E SWITCH IAW EWR 85-RESET TORQUE SWITCH SETTING TO 1.5 22=A REPLACED TERMAL OVERLOADS AND MADE MCC MODIFICATIONS AND CYCLED VALVE SAT OVERLOADS (2) 1024 4607296

.. - _ _ _ _ _ _ _ _ 7~n7

,_7 I0237 11/05/85 02-HI -RI -31 026027 OCERATION IS ERFATIC-HI 9 S/D FERFORMED PT 1.1 AND CECKED N-31 F ALARM SPIKES IN OR AN ERRATIC READING. ALL INDICATI ONS ARE NORMAL. OPS SAT.

0237 11/06/85 02-NI -MISC-N-42 026008 CONTROL POWER FUSE BLOWS WHEN REPLACED P-10 BISTABLE CAUSIlEi CONT -

CHECKING P-lO BISTABLE ROL POER FUSE TO BLOW IAEN P-10 BI STABLE SETPOINT IS TRIPPED. USED AP PLICABLE SUCTION OF PROCEDLRES.

0237 '11/06/85 02-RC -T/C -D-10 023904 CONSTANTLY ALARMING LOW, RAN SENSOR CAL CECKS GOOD. T/C WAS CECKED WEN TE INCORE T/C REPAIR CREW WAS WORKIlG AND FOLMD PETHING PHYSICALLY IRONG WITH B-10 N0 I

FROBLEM F0lND-

' 0237 11/07/85 02-RC -LI -459A 026068 RE/OS 4% LOWER THAN OTHER AD11STED INDICATORS LI-459A+LI-460 LOOP OP SAT. PT SENT TO ENGIEZRING 0237 1907/85~ 02-RC -TE -2421C 021246 REFLACE RTD CECKED RTD ELEENT AND ISlLATION RESISTANCE.ELECTRICAINS INSTALLED TE RTD OP CECK SAT 0237 11/07/85 02-RC -TE -2431 025069 C LOOD C0r(TROL RTD SPIKING, TA CECKED RTD ELEENT AND INSLLATION VE DECREASING RESISTANCE. ELECTRICIANS INSTALLED TE RTD'S OP CECKED SAT

0237 11/07/85 02-RC -TE -411C 022107 RTD FAILED OPEN; REPLACE RTD CECKED RTD ELEENT AND INSLLATION RESISTANCE. ELECTRICAINS INSTALLED TE RTD, CP CECK SAT

> 0237 11/07/85 02-RC -TE -431B 024472 RTD FAILED, REFtACE RTD CECKED ELEMENT AND INSLLATION RESISTANCE. ELECTRICAINS INSTALLED TE RTD. OP CECK SAT.

0237 11/07/85 02-RC -TE -432D 024470 RTD FAILED, FIFtACE RTD CECKED RTD ELEMENT AND INStLATION RESISTANCE. ELECTRICAINS INSTALLED THE RTD. OP CECKED SAT

'l i

'I l

\\

-.. --... - -- -. ~.--.- -.-...-....-- :.A m --.--

u.-._

w.

. ~

.s

~EPC0 SAFkTY FilATED DURING FEIUCE'D FOWER SORTED BY LNIT AND DEPARTENT MOGRAM WPT09860 12/09/85 10117. PAGE 32 FR0ri 11/21/83 TEU 11/25/85 UNIT 02-SURRY RETURNED TO WO N' riER WO TITLE HISTORY

SUMMARY

DEPT SERVICE MARK NUtGER J

022S 11/21/95 02-BD -

-180 026549 DRAIN VALVE LEANS BY PLOWING FOUND VALVE WITH 2' K0W LENGTH STEAM FURMANITED VALVE AND KILLED LIE STOPPED LEAK. REPAIR TO ORIGINAL ON WO 4298629 0228 11/21/85 02-CH -P

-1C 016671 INP0ARD BEARING HOUSING HAS PULLED BEMING HOUSING PULLED LFFER BEARING HALF AND INSFECTED. BEARING ogg egg HAS SLIGHT WEAR. MADE NEW GASKET.

PUT BEARING HALF BACK ON. PUT GASKE ON PUT COVER ON AND SLIDE SPACERS 0228 11/21/85 02-CH -P

-1C 034568 WATER IN OIL, IWESTIGATE FOR H NP OUT OIL FROM GREASE TO WASTE HEAT EXCHANGER LEAKS DIL IRtM WITH TEEL PtfF. REMOVE RD COOLER AND INSTALLED EW COOLER.

NEW COOLER WAS HYDROED IN SHOP USING 25 PSI AIR ON TE SELL SIDE 0228 11/21/95 02-FW -FCV -2488 026755 VALVE HAS A BODY TO BONNET LEAK PEEN BODY TO B0PeET LEAK.

360 DEG. AROUPC VALVE 0228 11/21/05 02-RC -HSS -NA 026979 INSPECT AND FILL TD 100% S/G FILLED 2-RC-HSS-171 1/2 GAL 2-RC4ES-1671 GAL 0228 11/22/85 02-CH -MOV -1275C 026377 PACKING LEAK.

ADJUSTED PACKING GLAND FOLLOWER TO STOP LEAK 0220 11/22/85 02-CH -P

-1C 025060 AUX OIL PUMP VERY NOISY, REMOVED FilMP AND FITTINGS FROM SYST EM COVERED ALL OFEN LINES. REPLACE D ALL BOLTS IN BOLT HOLES ON FOLNDA TION. PUMP STILL IN CH PtfF CUB.

INSTALLED NEW AUX OIL FifF. DRILL 0228 11/23/85 02-SW-HSS -14B 027107 SHUBBER IS BLOCKED REMOUNTED SNUBBER RESERVOIR TO i

ALLOW SNUBBER FREE TRAVEL AS INSTRU CTED BY R. BLOUNT AS PER TELCOM 0830 ES OFERABILITY TEST VERIFIED BY L KACK (OC) CONTACTED WEELER 0226 1D25/85 02-CW -MOV -206D 026869 MOV-CLUTCH EXTENTION POD BENT FOUND EXT ROD BADLY BENT, CLEVIS APO CATCHING. REPLACED ON BOTTOM BROKEN RCD M NOT MOVE THROUGH GUIDES. MADE EW ROD AND CLEVIS AND INSTALLED SAE 0228 11/25/85 C2-S'J -MOV -20AD 025844 HANDWHEEL FALLS OFF REINSTALLED SNAP RING TO HOLD HANDW EEL ON SNAP RING IN GOOD CONDITION 0229 11/21/85 02-CH -MOV -2115C 023937 MISSING IRAIN PLUG IN OPENING VOID NOT REQUIRED NO FtUGS/ COVERS MISSING 0229 11/23/05 02-CH -MOV -2287C 026256 PM - ON IEMAND COPFtETED FROCEDURE CH-MOV-E/R1 0229 11/23/85 02-CH -P

-1C 025728 ELECTRICALLY DISC 0t#ECT/RECONN-MARKED AND DISCONECTED MOTOR ECT AUX OIL PUMP FOR MECH.

WIRED UP MOTOR FOR HIGH V1 TACE ERI DGE AND ME0GERED MTR. WINDING OPLY T1-2=51 3 T1-3=51.2 T2-3=51.2 SOC 636. LOAD CECK 11/19/85 T1 6 0237 11/21/85 02-E -RCDR-NA 026272 UNIT 2 RECORIER FEN STICKS PER. CHECKED RECORDER OPERATION. NO IODICALLY FROBLEM FOUND 0237 11/23/85 02-LM -PT -200C 026332 18 MONTH CALS FERFORMED 18 MONTH CALI1 RATION NO ADJUSTMENTS MADE. CECKED SAT PT SENT TO ENGINEERING.

0237 11/25/85 02-CV -PT -201A 026829 18 MONTH CAL.

CALIBRATED TRANSMITTER MADE MINOR ADJUSTMENTS. CALIBRATED LOW LEVELS, MAIE MINOR ADJUSTMENTS CALIBRATED SUMMATOR, MADE MINOR ADJUSTENTS CALIBRATED INDICATOR MAIE MINGC

.- - ~ _.

3-

'EPCD SAFETY RElATED DURING REDUCElf FOWER SORTED BY (NIT AND IEPARTMENT PR1XiRAM WPT09860 1?>09/85 10117 PAGE 33 FROM 11/21/95 TE1J 11/25/85 UNIT d2 SURRY RETLRNED TO WO ICPT SERVICE M/RK HUKEEP:

NUhBER WO TITLE HISTORY

SUMMARY

O237 11/25/85 02-IC -DETR-A 024684 INVESTIGATE & REPAIR PR0fLEM FREED UP TRANSFER DEVICE AND FILLED WITH OIL. EXERCISED SEVERAL TIES OP SAT C37 11/25/85 02-IC -T/C -NA 024731 ASSIST WESTINGHOUSE WITH LABLED TERh0 COUPLE FOR (W) FERSONN REPAIR / REPLACEMENT OF ENCORE EL TO REPAIR. TEY CECKED TERMDC0 LFt.ES AND REPAIRED TEM. E TOOK RE T/C C( M ECTORS ADINGS ON COMPUTER FOUND TEM TO BE

. GOOD. TAFE AND RTV APPLICATION. 9 0237 11/25/85 02-LM -PT -200A 026330 18 MONTH CALS FERFORMED 18 MONTH CALIBRATION.

MAIC MINOR ADJUSTMENTS ON LM-PT-200 A

CECKED SAT.

PT SENT TO ENGIEERING 0237 11/25/85 02-LM -PT -2005 026331 18 MONTH CALS FERFORED 18 MONTH CALIBRATION MAIE MINOR ADJUSTENTS ON LM-PI-200B CECKED SAT PT SENT TO ENGINEERING 0237 11/25/85 02-LM -PT -200D 026333 18 MONTH CALS FERFORM 18 MONTH CALIBRATION.

NO ADJJSTENT MADE. CECKED SAT.

PT SENT TO ENGINEERING.

e T

4 k

w

. ~,. + -

3 VraotMIA ELucTaxc Awn Powna COMi*ANY -

Rxcnxown,VIROINIA 20261 I W. L.' S1rawurr Vac. P..eno..? -

wuct.i. o.. m o..

December 13, 1985 Mr. Maurice R. Beebe Serial No.85-859 Office.of Resource Management

.N0/ETS:acm U.S.-Nuclear Regulatory Commission Docket Nos..50-280-Washington,.D. C. 205557 50-281 License Nos. DPR-32 DPR-37

Dear Mr. Beebe:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT NOS. 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the Monthly Operating Report for'Surry Power Station Unit Nos. 1.

and 2 for the month of November, 1985.

Very truly yours, 1

.L W. L. Stewart Enclosure (3 copies) cc:

Mr. James M. Taylor, Director (12 copies)-

Office of Inspection and Enforcement Dr. J. Nelson Grace (1 copy)

Regional Administrator Region II Mr. Donald J. Burke (1 copy)

NRC Resident Inspector Surry Power Station 4