Responds to Noncompliance Noted in Insp Rept 50-341/85-37. Corrective Actions:Surveillance Performance Forms Now Posted W/Critical Completion Data & New Scheduling Printout Provided Daily to Nuclear Shift Supervisor
ML20137T567
Person / Time
Site: Fermi 
Issue date: 11/20/1985
From: Jens W
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
VP-85-0210, VP-85-210, NUDOCS 8512090053
Download: ML20137T567 (3)


Text

.;,

f[ t L -

L Wayno H. Jena -

Vice President ~

. Nuclear Operatons.

MIOh Edson ;CIwnow.anLay

"= :r"-"

November-20, 1985' VP-85-0210 F

Mr. James G.!Keppler Regional Administrator' Region III 7U. S.l Nuclear. Regulatory Commission 799 Roosevelt Road-

~ Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

Reference:

Fermi 2 NRC Docket No. 50-341

-NRC License No. NPF-43

Subject:

Detroit. Edison Response Inspp.c_t.igp Report 50-341/8_5_0_31

~

.This letter responds to the iten of noncompliance described in your/ Inspection Report No. 50-341/85037 1 This inspection was conducted by Messrs. P. M. Byron, M.

E.. Parker, D. C. Jones, S. G. DuPont, and J. M. Ulle of NRC Region III on July 1 through' September 30, 1985.

We trust this. letter satisfactorily responds to the item of.

noncompliance cited in the inspection. report.

If you have questions regarding this matter, please cont.act Mr. Joseph:E. Conen, (313) 586-5083.

Sincerely,

/)

I

~cc:

P. M. Byron

/.

i

'j j

G. C. Wright

///

USNRC, Document Control Desk v

-Washington, D.C. 20555 85i2090053 8

$41 PDR ADOCK ppg a

NOV 259B5 bj

1

.. -i?$, C ;

7 l

THE DETROIT-EDISON 40MPANY FERMI 2 NUCLEAR OPERATIONS ORGANIZATION RESPONSE TO NRC. INSPECTION-REPORT NO.- 50-341/85037

. DOCKET NO. 50-341 LICENSE NO. NPF-43 INSPECTION AT:

FERMI 2, NEWPORT, MICHIGAN INSPECTION CONDUCTED: ' JULY l-THROUGH SEPTEMBER 30, 1985

I I

h,,

RESPONSE TO NRC INSPECTION REPORT NO. 50-341/85037 Stat.queAt._Qf_Xqncomlian.qc_15.Q11_02 Technical Specification 4.3.1.1 states, "Each reactor protection system instrumentation channel shall be demonstrated OPERABLE by the performance of a CHANNEL CHECK, CHANNEL FUNCTIONAL TEST, and CHANNEL CALIBRATION operations for the OPERATIONAL CONDITIONS and at the frequenc.tes shown in Table 4.3.1.1-1".

Table 4.3.1.1-1 requires the channel functional test to be performed weekly for shutdown conditions

~

(Modes 3 and 4) for the intermediate Range Monitors (IRMs).

Contrary to the above, on September 6, 1985, the licensee failed to perform the required weekly channel functional tests on IRMs B, G, and H within the required time interval as required by Technical Specification 4.3.1.1.

C OIJ;.qc t.LM.t_ hCRLQ D_3Ak CD._qnd_RqGU.1L.G._b9hlC2D_4 On September 7, 1985 the IRM surveillances for channels B, G and H were successfully completed.

All three IRMs were operable when tested and would have performed their intended function.

CD rJ.cgi.ile_AQ.tiDIL_to_bA_TaLq11_to_2Y9.ist_E91AhcI_Rqussmli aAqe To minimize the possibility of recurrence, surveillance Performance Forms are now posted with the critical completion date (that date when Technical Specification allowed overrun expires) in addition to the scheduled completion date previously posted.

The weekly surveillance schedule is now included in the Plan-of-the-Day with overdue surveillances posted for emphasis to the operating shift and plant management.

A new scheduling printout noting desired completion dates, critical completion dates, and previous completion dates is provided daily to the Nuclear Shift Supervisor for all surveillances.

Discussions have been conducted with Nuclear Instrumentation and Control Foreman to emphasize the importance of meeting critical completion dates and to clarify their role in assisting the operating shift to ensure surveillances are performed on time.

QatAJibCIL.Eull._CQI:LO1LQDSA Will D9_AthiAV_qd Full compliance has been achieved.