ML20137T073
| ML20137T073 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 04/09/1997 |
| From: | Shell R COMMONWEALTH EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20137T077 | List: |
| References | |
| NUDOCS 9704150307 | |
| Download: ML20137T073 (2) | |
Text
.. _.
e e
Tennessee Valley Authority. Post offce Box 2000, soddy-Dasy, Tennessee 37379-2000 I
April 9,1997 i
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 i
Gentlemen:
In the Matter of
)
Docket No. 50-327 Tennessee Valley Authority
)
SEQUOYAH NUCLEAR PLANT (SON)- REVISED UNIT 1 TECHNICAL SPECIFICATlDN (TS) PAGE FOR TS CHANGE 96-05
Reference:
TVA let er to NRC dated October 18,1996, "Sequoyah Nuclear Plant (SON) - Technical Specification (TS) Change 96-05, ' Elimination of r
Cycle 8 Limitation For Steam Generator (S/G) Alternate Plugging Criteria (APC)"'
. provides a marked up copy of a unit 1 TS page (page 3/4 4-7) that was inadvertently omitted from TVA's proposed TS change 96-05. The revised unit 1 page supplements the unit 1 pages previously provided in enclosure 1 of the reference letter. The revised unit 1 page corresponds to the revised unit 2 page 3/4 4-11 provided in the reference letter. Enclosure 2 provides the retyped unit 1 page.
Please direct questions concerning this issue to Don Goodin at (423) 843-7734.
Sincerely, M, /l.M#
150107 R. H. Shell Site Licensing and Industry Affairs Manager 97041503o7 970409 g g g gjllllll$ $
PDR ADOCK 0500 7
U.S.' Nuclear Regulatory Commission Page 2 April 9,1997 j
cc:
R. W. Hernan, Senior Project Manager Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 t
NRC Resident inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region ll 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 l
.