Tennessee Valfoy Authority. Post Office Box 2000, Soddy-Daisy, Tennessee 37379-2000 April 10,1997 i
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C 20555 1
Gentlemen:
In the Matter of
)
Docket No. 50-327 Tennessee Valley Authority
)
50-328 INSPECTION REPORT NOS. 50-327,328/96 ENFORCEMENT ACTION 97-092 SEQUOYAH NUCLEAR PLANT (SQN) - EXTENSION OF RESPONSE TO NRC The purpose of this letter is to document a two-week extension for TVA's response to the Notice of Violation associated with the NRC Office of Investigations Report No. 2-96-009 and EA 97-092 documented by letter from Johns P. Jaudon to
]
Oliver D. Kingsley, Jr., dated March 14,1997.
The extension was granted by Mr. Al Belisles of Region ll in a telephone conversation with Jim Smith of TVA on April 10,1997. The response is now due on or before April 28,1997.
f, /I.
R. H. Shell Site Licensing and Industry Affairs Manager t
geoll 150101 9704150295 970410 PDR ADOCK 05000327
)
O PDR b,
b, ifl,[l,klkf 1:wd:Ir9610.eam
l<:
2' i
l U.S. Nuclear Regulatory Commission Page 2 April 10,1997 cc: U.S. Nuclear Regulatory Commission Region 11 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. Ronald W. Heman, Senior Project Manager
- U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 NRC Resident inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennesseo 37379-3624
\\
E i
l
..