ML20137S953

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-254/97-04 & 50-265/97-04 on 970210- 0326 & Nov.W/O NOV
ML20137S953
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 04/08/1997
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kraft E
COMMONWEALTH EDISON CO.
Shared Package
ML20137S956 List:
References
NUDOCS 9704150286
Download: ML20137S953 (3)


See also: IR 05000254/1997004

Text

- - . .-

>

QC 'O

1

.

ATION

April 8, 1997

i

Mr. E. Kraft j

Site Vice President  ;

Quad Cities Station )

Commonwealth Edison Company

22710 206th Avenue North  !

Cordova, IL 61242  ;

I

SUBJECT: NRC QUAD CITIES SECURITY INSPECTION REPORTS 50-254/97004 i

(DRS); 50-265/97004(DRS)

Dear Mr. Kraft: )

On March 26,1997, the NRC completed an inspection at your Quad Cities Nuclear

Reactor Station. The enclosed report presents the results of that inspection. I

During this inspection, we found that those security activities which were observed or

reviewed were conducted in a responsible and reasonable manner. Security activities

were conducted as required and equipment functioned as designed. Security program

performance was satisfactory. We identified one violation of your security program. l

The violation involved an inadequate vehicle search, which appeared to be caused by

a weakness in procedure adherence and a weakness in training activities.

This violation is cited in the enclosed Notice of Violation (Notice), and the

circumstances surrounding the violation are described in detail in the onclosed report.

Please note that you are required to respond to this letter and should fo!!ow the

instructions specified in the enclosed Notice when preparing your response. The NRC

will use your response, in part, to determine whether further enforcement action is

necessary to ensure compliance with regulatory requirements.

Also, two licensee-identified violations were identified. One involved a security

officer's inattentiveness to duty. The other involved a failure by licensee personnel to

implement fitness-for-duty procedures in a timely manner. Both non-cited violations

showed a weakness in individual performance. Details are described in the enclosed

<

report.

In addition, an unresolved item was identified. The unresolved issue involved the

\

adequacy of security barriers installed in ventilation ducts that penetrate a vital area

and the bullet-resistance of those ventilation barriers. gQN

The material enclosed herewith contains Safeguards Information as defined by

10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section

TION Enclosare conhinm %

150032 a

ru . 1. o.oontro11 4

9704150286 970400

PDR ADOCK 05000254 M:N}hjhggbjg . .-

G PDR g.g

. .-

.

5. Kraft -2- April 8, 1997

147 of the Atomic Energy Act of 1954, as amended. Therefore, the material will ap1

be placed in the Public Document Room.

Sincerely,

/s/ Melvyn Leach (for)

Geoffrey E. Grant, Director

Division of Reactor Safety

?

Docket Nos. 50-254; 50-265

Licenses No. DPR-29; DPR-30

Enclosures: 1. Notice of Violation

2. Inspection Reports 50-254/97004(DRS); 50-265/97004(DRS) ,

cc w/encis: T. J. Maiman, Senior Vice President,

Nuclear Operations Division

D. A. Sager, Vice President, Generation Support

H. W. Keiser, Chief Nuclear Operating Officer

L. W. Pearce, Station Manager i

C. C. Peterson, Regulatory Affairs Manager l

1. Johnson, Acting Nuclear

Regulatory Services Manager

NRR/DRIS/RSGB9D

NMSS/HIGDON/4E4 l

cc w/encls, w/o

SAFEGUARDS INFORMATION: Document Control Desk - Licensing

Richard Hubbard

Nathan Schloss, Economist,

Office of the Attorney General

State Liaison Officer

Chairman, Illinois Commerce Commission

J. R. Bull, Vice President, General &

Transmission, MidAmerican Energy Company

DOCUMENT NAME: A:QUA97004.DRS

To receive a copy of thle document, indicate in the bom "C" = Copy w/o attach /ence T = Copy w/ attach /enci"N' = No

copy n/

l OFFICE RIlrid/ l RI(Th&/ l RIII A4 m ld RIII le 1

lNAME 14aWda:jp JCrdif PHiland M MLeach/GGrant**2

l DATE OPM /97 03/Mf97 04/op/97 04A B/97

0FFICIAL RECORD COPY

Eng esure coatstna

5

_ _ _ _ _ _ _ _ _ _ _ _ _ __. - _. . _ _ - _ _ _ .

'

.

i

E. Kraft -3- April 8, 1997

i

'

Distribution:

Docket Fila w/o encls Rlli PRR w/o encls

PUBLIC IE-04 w/o encls SRis, Quad Cities,

Dresden, LaSalle w/o encls

'

'

OC/LFDCB w/o encls

DRP w/o encls TSS w/o encls

DRS w/o encls LPM, NRR w/o encls

B. Beach, Rlll w/o encls Enf. Coordinator, Rlli w/o encls

R. A. Capra, NRR w/o encls C. D. Pederson, Rlll w/o encls

CAA1 w/o enc!s

4

I

i

i

i

!

l

.

I

I

6 RKAT!W

I

aration This

la Deoontrolled

_.

_ , , _. _ . _ _ . _ _ _ . _ _ _ _ _ _ _ _ _ _ _