ML20137S292
ML20137S292 | |
Person / Time | |
---|---|
Site: | Davis Besse |
Issue date: | 11/27/1985 |
From: | Hiatt S OHIO CITIZENS FOR RESPONSIBLE ENERGY |
To: | NRC OFFICE OF THE SECRETARY (SECY) |
References | |
CON-#186-385 NUDOCS 8602140387 | |
Download: ML20137S292 (1) | |
Similar Documents at Davis Besse | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217P2061999-10-26026 October 1999
[Table view]Forwards for First Energy Nuclear Operating Co Insp Rept 50-346/99-17 on 990928-1001.Insp Was Exam of Activities Conducted Under License Re Implementation of Physical Security Program.No Violations Identified ML20217N3851999-10-20020 October 1999 Forwards RAI Re Licensee 990521 Request for License Amend to Allow Irradiated Fuel to Be Stored in Cask Pit at Davis-Besse,Unit 1.Response Requested within 60 Days from Receipt of Ltr ML20217N2321999-10-15015 October 1999 Requests NRC Approval to Use Alternative to Requirements of 10CFR50.55a(f)(4)(ii).Licensee Requests Extension to Specified Schedule for Implementing Updates to IST Program ML20217G9201999-10-14014 October 1999 Discusses Utils Request for Approval of Quality Assurance Program Changes PY-CEI-NRR-2438, Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl1999-10-14014 October 1999 Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl ML20217F8371999-10-0808 October 1999 Forwards Insp Rept 50-346/99-10 on 990802-0913.One Violation Occurred Being Treated as NCV ML20217A5641999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Davis-Besse on 990901.Informs That NRC Plans to Conduct Addl Insps to Address Questions Raised by Issues Re Operator Errors & Failure to Commit to JOG Topical Rept on MOV Verification ML20212L0691999-09-30030 September 1999 Forwards,For Review & Comment,Copy of Preliminary ASP Analysis of Operational Condition Discovered at Unit 1 on 981014,as Reported in LER 346/98-011 ML20216J6701999-09-24024 September 1999 Forwards Post Examination Documentation for Written Operator Initial License Examination Administered at Davis-Besse Nuclear Power Station on 990920.Without Encls ML20212D3501999-09-21021 September 1999 Forward Copy of Final Accident Sequence Precursor Analysis of Operational Event at Plant,Unit 1 on 980624,reported in LER 346/98-006 05000346/LER-1998-001, Forwards Rev 1 for LER 1998-001,which Updates Corrective Actions & Revises Completion Date Re Implementation of Changes to Plant Emergency Operating Procedure.List of Commitments Attached1999-09-0909 September 1999 Forwards Rev 1 for LER 1998-001,which Updates Corrective Actions & Revises Completion Date Re Implementation of Changes to Plant Emergency Operating Procedure.List of Commitments Attached ML20216E5961999-09-0707 September 1999 Forwards Application for Amend to License NPF-3,revising Tech Specs 3/4.3.2.1,safety Features Actuation Sys Instrumentation & Associated Bases 3/4.3.1 & 3/4.3.2,reactor Protection Sys & Safety Sys Instrumentation ML20211P3001999-09-0707 September 1999 Forwards FEMA Transmitting FEMA Evaluation Rept for 990504 Emergency Preparedness Exercise at Davis-Besse Nuclear Power Plant.No Deficiencies Identified.One Area Requiring C/A & Two Planning Issues Identified ML20211K6681999-08-30030 August 1999 Forwards Copies of Certified Personal Qualification Statement - Licensee (NRC Form 398) for Operator Candidates Listed Below.Without Encls ML20211K6611999-08-30030 August 1999 Forwards Copies of Operator License Renewal Applications for Individuals Listed.Operators Have Successfully Completed Appropriate Operator Requalification Training Program at Dbnps.Without Encls ML20211K0951999-08-30030 August 1999 Forwards Request for Addl Info Re Fire & Seismic Analyses of IPEEE for Davis-Besse Nuclear Power Station,Unit 1. Response Requested within 60 Days ML20211H0201999-08-25025 August 1999 Forwards semi-annual FFD Rept for 990101-0630 for DBNPS, Unit 1,IAW 10CFR26.71(d) ML20211D1171999-08-20020 August 1999 Forwards Insp Rept 50-346/99-09 on 990623-0802.Violations Identified & Being Treated as Noncited Violations ML20211G3911999-08-20020 August 1999 Forwards Update to Estimated Info for Licensing Action Requests Through 010930,re Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates PY-CEI-NRR-2411, Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl1999-08-19019 August 1999 Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl ML20211J9201999-08-13013 August 1999 Urges NRC to Find Funds for Stockpiling Radiation Pills for Residents Living Near Plant ML20211B0161999-08-13013 August 1999 Forwards SE Accepting Evaluation of Second 10-year Interval Inservice Insp Program Request for Relief Numbers RR-A16, RR-A17 & RR-B9 for Plant,Unit 1 ML20210T1061999-08-12012 August 1999 Forwards Preliminary NRC Forms 398 & 396 for Listed Candidates,Per Operator License Exam Scheduled for Week of 990913.Encl Withheld ML20210S6071999-08-11011 August 1999 Provides Final Response to NRC RAI Re GL 98-01, Y2K Readiness of Computer Systems at Npps ML20210P8051999-08-0909 August 1999 Forwards Insp Rept 50-346/99-15 on 990712-16.No Violations Noted.However,Several Deficiencies Were Identified with Implementation of Remp,Which Collectively Indicated Need for Improved Oversight of Program IR 05000346/19980211999-08-0606 August 1999 Refers to NRC Insp Rept 50-346/98-21 Conducted on 980901- 990513 & Forwards Nov.Two Violations Identified Involving Failure to Maintain Design of Valve & Inadequate C/A for Degraded Condition Cited in Encl NOV 05000346/LER-1998-009, Forwards LER 98-009-01,IAW 10CFR50.73(a)(2)(ii)(B). Commitments Made by Util Are Encl1999-08-0606 August 1999 Forwards LER 98-009-01,IAW 10CFR50.73(a)(2)(ii)(B). Commitments Made by Util Are Encl ML20210H6101999-07-30030 July 1999 Informs That Region III Received Rev 21 to Various Portions of Davis-Besse Nuclear Power Station Emergency Plan.Revision Was Submitted Under Provisions of 10CFR50.54(q) in Apr 1999 ML20210H0491999-07-28028 July 1999 Forwards Application for Amend to License NPF-3,revising TS 3/4.7.5.1, Ultimate Heat Sink, to Allow Plant Operation in Modes 1-4 with Water Temp Less than or Equal to 90 F ML20210G5521999-07-28028 July 1999 Provides Addl Response to 980923 OL Licensing Exam Rept 50-346/98-301 Re OL Exam Administered in Aug 1998.Results of Root Cause Investigation & Corrective Actions,Discussed ML20210G3831999-07-27027 July 1999 Forwards Application for Amend to NPF-3,changing TSs 6.4, Training, 6.5.2.8, Audits, 6.10, Record Retention, 6.14, Process Control Program & 6.15, Odcm ML20211P3071999-07-26026 July 1999 Forwards Final Rept for 990504 Biennial Radiological Emergency Preparedness Exercise for David-Besse Power Station.No Deficiencies Identified for Any Jurisdiction During Exercise ML20210G4391999-07-26026 July 1999 Forwards Application for Amend to License NPF-3,revising Tech Specs 3/4.3.2.1, Safety Features Actuation Sys Instrumentation, & Associated Bases 3/4.3.1 & 3/4.3.2, Reactor Protection Sys & Safety Sys Instrumentation ML20210G7151999-07-26026 July 1999 Forwards Application for Amend to License NPF-3,revising TSs 3/4.3.3.1, Radiation Monitoring Instrumentation, 3/4.3.3.2, Instrument - Incore Detectors & 3/4.3.3.9, Instrumentation - Waste Gas Sys Oxygen Monitor ML20210G5151999-07-26026 July 1999 Forwards Application for Amend to License NPF-3,revising Tech Specs for Implementation of 10CFR50,App J,Option B for Type B & C Containment Leakage Rate Testing ML20210G3211999-07-26026 July 1999 Forwards Written OL Exam & Supporting Matl for Exam to Be Administered at DBNPS During Week of 990913.Listed Encls Withheld from Public Disclosure Until After Exam Complete ML20210C4381999-07-20020 July 1999 Forwards Insp Rept 50-346/99-08 on 990513-0622.Unidentified RCS Leak Approached TS Limit of 1 Gallon Per Minute Prior to Recently Completed Maint Outage.Three Violations of NRC Requirements Identified & Being Treated as NCVs ML20209G3681999-07-15015 July 1999 Advises That Info Submitted in & 990519 Affidavit Re Design & Licensing Rept,Davis-Besse,Unit 1 Cask Pit Rack Installation Project,Holtec Intl, HI-981933,marked Proprietary,Will Be Withheld from Public Disclosure ML20207H6401999-07-0909 July 1999 Discusses Closure of TAC MA0540 Re Util Responses to RAI on GL 92-01,rev 1,suppl 1, Rv Structural Integrity. Staff Has Revised Info in Rvid & Releasing It as Rvid Version 2 ML20209D1341999-07-0808 July 1999 Forwards Notice of Withdrawal of Application for Amend to Operating License.Proposed Change Would Have Modified Facility TSs Pertaining to Allowable as-found Pressure Lift Setting Tolerance of Two Pressurizer Code Safety Valves 05000346/LER-1998-012, Forwards LER 98-012-01,which Is Being Submitted to Provide Addl Info Re 981018 Occurrence.Commitment List Attached1999-07-0707 July 1999 Forwards LER 98-012-01,which Is Being Submitted to Provide Addl Info Re 981018 Occurrence.Commitment List Attached ML20209C3981999-07-0101 July 1999 Responds to NRC Re Violations Noted in Insp Rept 50-346/98-21.Corrective Actions:Developed Rev to Boric Acid Control Program & Work Process Guideline on Plant Leakage ML20209B5821999-06-24024 June 1999 Provides Justification for Rev to Completion Date for One of Insp follow-up Items Cited in Insp Rept 50-346/98-03, Designated as Inspector follow-up Item 50-346/97-201-10 ML20196G1251999-06-23023 June 1999 Responds to NRC RAI Re GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20196E5321999-06-17017 June 1999 Forwards Addl Info Re Relief Request RR-A16 to Support NRC Approval of Relief Request ML20195K2751999-06-16016 June 1999 Forwards Safety Evaluation Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20196A6601999-06-16016 June 1999 Forwards Master Decommissioning Trust Agreements Revised After 1990 for Ohio Edison Co,Cleveland Electric Illuminating Co,Toledo Edison Co & Pennsylvania Power Co Re Bvnps,Units 1 & 2,DBNPS,Unit 1 & Perry Unit 1 ML20195F9071999-06-10010 June 1999 Forwards Application for Amend to NPF-3,changing Tech Specs 3/4.6.4.4, Hydrogen Purge Sys, TS 3/4.6.5.1, Shield Bldg Emergency Ventilation Sys & TS 3/4.7.6.1, Crevs ML20195F8851999-06-0707 June 1999 Withdraws 950929 License Amend Application,Proposing Mod to Allowable as-found Pressure Lift Setting Tolerance of Two Pressurizer Code Safety Valves ML20207G0751999-06-0707 June 1999 Forwards Insp Rept 50-346/99-04 on 990323-0513.Violations Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy 1999-09-09 Category:INCOMING CORRESPONDENCE MONTHYEARML20217N2321999-10-15015 October 1999
[Table view]Requests NRC Approval to Use Alternative to Requirements of 10CFR50.55a(f)(4)(ii).Licensee Requests Extension to Specified Schedule for Implementing Updates to IST Program PY-CEI-NRR-2438, Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl1999-10-14014 October 1999 Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl ML20216J6701999-09-24024 September 1999 Forwards Post Examination Documentation for Written Operator Initial License Examination Administered at Davis-Besse Nuclear Power Station on 990920.Without Encls 05000346/LER-1998-001, Forwards Rev 1 for LER 1998-001,which Updates Corrective Actions & Revises Completion Date Re Implementation of Changes to Plant Emergency Operating Procedure.List of Commitments Attached1999-09-0909 September 1999 Forwards Rev 1 for LER 1998-001,which Updates Corrective Actions & Revises Completion Date Re Implementation of Changes to Plant Emergency Operating Procedure.List of Commitments Attached ML20216E5961999-09-0707 September 1999 Forwards Application for Amend to License NPF-3,revising Tech Specs 3/4.3.2.1,safety Features Actuation Sys Instrumentation & Associated Bases 3/4.3.1 & 3/4.3.2,reactor Protection Sys & Safety Sys Instrumentation ML20211K6611999-08-30030 August 1999 Forwards Copies of Operator License Renewal Applications for Individuals Listed.Operators Have Successfully Completed Appropriate Operator Requalification Training Program at Dbnps.Without Encls ML20211K6681999-08-30030 August 1999 Forwards Copies of Certified Personal Qualification Statement - Licensee (NRC Form 398) for Operator Candidates Listed Below.Without Encls ML20211H0201999-08-25025 August 1999 Forwards semi-annual FFD Rept for 990101-0630 for DBNPS, Unit 1,IAW 10CFR26.71(d) ML20211G3911999-08-20020 August 1999 Forwards Update to Estimated Info for Licensing Action Requests Through 010930,re Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates PY-CEI-NRR-2411, Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl1999-08-19019 August 1999 Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl ML20211J9201999-08-13013 August 1999 Urges NRC to Find Funds for Stockpiling Radiation Pills for Residents Living Near Plant ML20210T1061999-08-12012 August 1999 Forwards Preliminary NRC Forms 398 & 396 for Listed Candidates,Per Operator License Exam Scheduled for Week of 990913.Encl Withheld ML20210S6071999-08-11011 August 1999 Provides Final Response to NRC RAI Re GL 98-01, Y2K Readiness of Computer Systems at Npps 05000346/LER-1998-009, Forwards LER 98-009-01,IAW 10CFR50.73(a)(2)(ii)(B). Commitments Made by Util Are Encl1999-08-0606 August 1999 Forwards LER 98-009-01,IAW 10CFR50.73(a)(2)(ii)(B). Commitments Made by Util Are Encl ML20210H0491999-07-28028 July 1999 Forwards Application for Amend to License NPF-3,revising TS 3/4.7.5.1, Ultimate Heat Sink, to Allow Plant Operation in Modes 1-4 with Water Temp Less than or Equal to 90 F ML20210G5521999-07-28028 July 1999 Provides Addl Response to 980923 OL Licensing Exam Rept 50-346/98-301 Re OL Exam Administered in Aug 1998.Results of Root Cause Investigation & Corrective Actions,Discussed ML20210G3831999-07-27027 July 1999 Forwards Application for Amend to NPF-3,changing TSs 6.4, Training, 6.5.2.8, Audits, 6.10, Record Retention, 6.14, Process Control Program & 6.15, Odcm ML20210G7151999-07-26026 July 1999 Forwards Application for Amend to License NPF-3,revising TSs 3/4.3.3.1, Radiation Monitoring Instrumentation, 3/4.3.3.2, Instrument - Incore Detectors & 3/4.3.3.9, Instrumentation - Waste Gas Sys Oxygen Monitor ML20210G5151999-07-26026 July 1999 Forwards Application for Amend to License NPF-3,revising Tech Specs for Implementation of 10CFR50,App J,Option B for Type B & C Containment Leakage Rate Testing ML20210G3211999-07-26026 July 1999 Forwards Written OL Exam & Supporting Matl for Exam to Be Administered at DBNPS During Week of 990913.Listed Encls Withheld from Public Disclosure Until After Exam Complete ML20210G4391999-07-26026 July 1999 Forwards Application for Amend to License NPF-3,revising Tech Specs 3/4.3.2.1, Safety Features Actuation Sys Instrumentation, & Associated Bases 3/4.3.1 & 3/4.3.2, Reactor Protection Sys & Safety Sys Instrumentation ML20211P3071999-07-26026 July 1999 Forwards Final Rept for 990504 Biennial Radiological Emergency Preparedness Exercise for David-Besse Power Station.No Deficiencies Identified for Any Jurisdiction During Exercise 05000346/LER-1998-012, Forwards LER 98-012-01,which Is Being Submitted to Provide Addl Info Re 981018 Occurrence.Commitment List Attached1999-07-0707 July 1999 Forwards LER 98-012-01,which Is Being Submitted to Provide Addl Info Re 981018 Occurrence.Commitment List Attached ML20209C3981999-07-0101 July 1999 Responds to NRC Re Violations Noted in Insp Rept 50-346/98-21.Corrective Actions:Developed Rev to Boric Acid Control Program & Work Process Guideline on Plant Leakage ML20209B5821999-06-24024 June 1999 Provides Justification for Rev to Completion Date for One of Insp follow-up Items Cited in Insp Rept 50-346/98-03, Designated as Inspector follow-up Item 50-346/97-201-10 ML20196G1251999-06-23023 June 1999 Responds to NRC RAI Re GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20196E5321999-06-17017 June 1999 Forwards Addl Info Re Relief Request RR-A16 to Support NRC Approval of Relief Request ML20196A6601999-06-16016 June 1999 Forwards Master Decommissioning Trust Agreements Revised After 1990 for Ohio Edison Co,Cleveland Electric Illuminating Co,Toledo Edison Co & Pennsylvania Power Co Re Bvnps,Units 1 & 2,DBNPS,Unit 1 & Perry Unit 1 ML20195F9071999-06-10010 June 1999 Forwards Application for Amend to NPF-3,changing Tech Specs 3/4.6.4.4, Hydrogen Purge Sys, TS 3/4.6.5.1, Shield Bldg Emergency Ventilation Sys & TS 3/4.7.6.1, Crevs ML20195F8851999-06-0707 June 1999 Withdraws 950929 License Amend Application,Proposing Mod to Allowable as-found Pressure Lift Setting Tolerance of Two Pressurizer Code Safety Valves ML20207F4231999-06-0202 June 1999 Forwards Rev 1 to DBNPS Emergency Preparedness Evaluated Exercise Manual 990504, IAW 10CFR50.4.NRC Evaluated Exercise Has Been Rescheduled for 991208,since NRC Did Not Evaluate 990504 Exercise ML20207E2521999-05-28028 May 1999 Forwards Rev 18,App A,Change 1 to Davis-Besse Nuclear Power Station,Unit 1,industrial Security Plan IAW Provisions of 10CFR50.54(p).Encl Withheld,Per 10CFR73.21 ML20207E9561999-05-28028 May 1999 Forwards Update to NRC AL 98-03,re Estimated Info for Licensing Activities Through Sept 30,2000 ML20207E7801999-05-21021 May 1999 Forwards Application for Amend to License NPF-3,allowing Use of Expanded Spent Fuel Storage Capacity.Proprietary & non- Proprietary Version of Rev 2 to HI-981933 Re Cask Pit Rack Installation Project,Encl.Proprietary Info Withheld ML20206N0231999-05-0606 May 1999 Forwards License Renewal Applications for Davis-Besse Nuclear Power Station,Unit 1 for ML Klein,Cn Steenbergen & CS Strumsky.Without Encls ML20206D2421999-04-28028 April 1999 Forwards Combined Annual Radiological Environ Operating Rept & Radiological Effluent Release Rept for 1998. Rev 11, Change 1 to ODCM & 1998 Radiological Environ Monitoring Program Sample Analysis Results Also Encl PY-CEI-NRR-2382, Forwards 1998 Annual Rept for Firstenergy Corp, for Perry Nuclear Power Plant & Davis-Besse Nuclear Power Station.Form 10-K Annual Rept to Us Securities & Exchange Commission for FY98 Also Encl1999-04-21021 April 1999 Forwards 1998 Annual Rept for Firstenergy Corp, for Perry Nuclear Power Plant & Davis-Besse Nuclear Power Station.Form 10-K Annual Rept to Us Securities & Exchange Commission for FY98 Also Encl ML20206B8831999-04-17017 April 1999 Forwards 1634 Repts Re Results of Monitoring Provided to Individuals at Davis-Besse Nuclear Power Station During 1998,per 10CFR20.2206.Without Repts ML20205K3871999-04-0707 April 1999 Forwards Copy of Application of Ceic,Oec,Ppc & Teco to FERC, Proposing to Transfer Jurisdictional Transmission Facilities of Firstenergy Operating Companies to American Transmission Sys,Inc.With One Oversize Drawing ML20205K5641999-04-0707 April 1999 Forwards Response to NRC 980415 RAI Re GL 96-06, Assurance of Equipment Operability & Ci During Design-Basis Accident Conditions. Rept FAI/98-126, Waterhammer Phenomena in Containment Air Cooler Swss, Encl ML20205J1171999-03-29029 March 1999 Forwards Rev 1 to BAW-2325, Response to RAI Re RPV Integrity, Per GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity. Rev Includes Corrected Values in Calculations PY-CEI-NRR-2377, Submits Decommissioning Repts for Bvps,Units 1 & 2,Davis- Besse Nuclear Power Station,Unit 1 & Perry Nuclear Power Plant,Unit 1,per 10CFR50.75(f)(1)1999-03-29029 March 1999 Submits Decommissioning Repts for Bvps,Units 1 & 2,Davis- Besse Nuclear Power Station,Unit 1 & Perry Nuclear Power Plant,Unit 1,per 10CFR50.75(f)(1) ML20205F5961999-03-27027 March 1999 Forwards Comments on Preliminary Accident Sequence Percursor (ASP) Analysis of 980624 Operational Event at Dbnps,Unit 1, as Transmitted by NRC Ltr ML20205D4791999-03-26026 March 1999 Forwards Rept Submitting Results of SG Tube ISI Conducted in Apr 1998.Rept Includes Description of Number & Extent of Tubes Inspected,Location & Percent wall-thickness Penetration for Each Indication of Imperfection ML20205L2031999-03-26026 March 1999 Submits Correction to Dose History of Tj Chambers.Dose Records During 1980-1997 Were Incorrectly Recorded Using Wrong Social Security Number.Nrc Form 5 Not Encl ML20205C7371999-03-25025 March 1999 Certifies That Dbnps,Unit 1,plant-referenced Simulator Continues to Meet Requirements of 10CFR55.45(b) for Simulator Facility Consisting Solely of plant-referenced Simulator.Acceptance Test Program & Test Schedule,Encl ML20205E3551999-03-19019 March 1999 Requests That Proposed Changes to TS 6.8.4.d.2 & TS 6.8.4.d.7 Be Withdrawn from LAR Previously Submitted to NRC ML20204J6361999-03-17017 March 1999 Forwards Firstenergy Corp Annual Rept for 1998 & 1999 Internal Cash Flow Projection as Evidence of Util Guarantee of Retrospective Premiums Which May Be Served Against Facilities PY-CEI-NRR-2375, Forwards List That Details Util Insurers,Policy Numbers & Coverage Limits for Two Power Plants,Per Requirements of 10CFR50.54(w)(3) Re Reporting of Property Insurance Coverage1999-03-15015 March 1999 Forwards List That Details Util Insurers,Policy Numbers & Coverage Limits for Two Power Plants,Per Requirements of 10CFR50.54(w)(3) Re Reporting of Property Insurance Coverage ML20204E6821999-03-12012 March 1999 Requests That Listed Changes Be Made to NRC Document Svc List for Davis-Besse Nuclear Power Station,Unit 1 1999-09-09 Category:PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA TO NRC MONTHYEARML20245J7241989-02-25025 February 1989
[Table view]Discusses Merits of Close on Limit Re motor-operated Gate Valve Torque Switches.Limit Switch Failures Not Reported at Significant Rate & Switch Require Only Minimal Care ML20235H7961989-02-15015 February 1989 Requests NRC Defer Further Proceedings in 881220 Hearing Request Re Insp Repts 50-346/88-12 & 50-346/88-27 & Postpone Issuance of Notice of Hearing.Initial Bases of Hearing Request Being Discussed W/Util ML20150A7961988-06-30030 June 1988 Comments on Util 880616 Request to Suspend Antitrust License Condition.Economic Advantages for Util Owning Nuclear Power Plants Have Failed to Materialize ML20155G4871988-05-13013 May 1988 FOIA Request for Documents Re Suspect Piping from Piping Supplies Inc of Folsom,Nj & West Jersey Mfg Co of Williamstown,Nj,Used in Davis-Besse Nuclear Power Plant ML20148G9001988-02-0101 February 1988 FOIA Request for Documents Re 10CFR50,App R Insps & Enforcements ML20147C0781988-01-25025 January 1988 FOIA Request for Documents Re Davis-Besse Six Month Outage for Refueling & Repair/Maint Measures Commencing in Mar 1988 ML20236D7991987-10-13013 October 1987 FOIA Request for Rept Entitled, Pcaq 86-0663, as Ref in Plant Daily Status Rept for 861231 ML20236D7691987-09-14014 September 1987 FOIA Request for Documents Re Allegations Concerning 861231 Incident Involving Plant Manager Being Ordered Into Plant After Drinking at Party ML20235B6551987-09-0303 September 1987 FOIA Request for Records or Documents Re 870101 Reactor Trip Due to Loss of Water ML20235B8951987-08-31031 August 1987 FOIA Request for Documents Re Operation & Operating Conditions at Plant on 831231 ML20215D6371987-06-12012 June 1987 Forwards Reply to Responses from NRC & B&W Owners Group. NRC Response Evidences No Independent Review of B&W Claims. Commission Urged to Take Personal Jurisdiction of Petition to Ensure That Latest Commitment Not Frustrated ML20214K9531987-04-15015 April 1987 FOIA Request for Documents Re Alleged Intoxication of Plant Manager L Storz on 861231 or 870101 While on Site ML20211N0101986-12-0101 December 1986 Requests Reconsideration of 861119 Director'S Decision & Order for Util to Show Cause Why OL Should Not Be Revoked, Modified or Suspended.Plant Should Be Shut Down Pending Adjudication of Issues Raised in 2.206 Petition ML20215J2591986-08-29029 August 1986 FOIA Request for Listed Records Including Documents Re Ofc of Inspector & Auditor Investigation Rept Re Abuses of FTS, ACRS Proposal to Hire Lawyer,Performance of Itt at Davis- Besse & Comley Activities Re Seabrook Unit 1 ML20209D4291986-08-0404 August 1986 FOIA Request for Seven Categories of Records Re Release of Radiation from Nuclear Power Plants ML20215D8511986-07-20020 July 1986 FOIA Request for Procedure & Criteria for Removing Commissioners,Estimate of Actual & Projected Deaths from Chernobyl & Max Possible Deaths & Injuries from Accidents at Perry & Davis-Besse Power Plants ML20199K9641986-07-0303 July 1986 Urges NRC to Rescind Approval to Bury Low Level Radwaste at Facility.Solid Waste May Not Be Disposed of at Site Due to Location within 100-yr Floodplain.Radwaste Disposal Will Pollute Groundwater.Served on 860708 ML20206J8601986-06-18018 June 1986 Requests Correction of 860605 Fr Notice.Reason for Petition Was Intent to Perform Independent Analysis,Per . Served on 860624 ML20199E6801986-06-14014 June 1986 Opposes Periodic Disposal of Low Level Radioactive Dredgings from Onsite Settling Basins Onto Land Owned by Util.Requests Opposition Be Considered at 860624-26 Hearings in Sandusky, Oh & Any Subsequent Proceedings.Drinking Water at Risk ML20198Q8071986-06-0202 June 1986 Fowards Ltrs Authorizing Author to Represent Listed Organizations in 860411 Petition for Leave to Intervene in Site Disposal Hearing,In Response to J Silberg 860516 Reply ML20195F0931986-05-28028 May 1986 Questions How There Can Be Enough Intervenors for Public Hearing Re Burial of Low Level Radioactive Sludge When Util Atty Petitions ASLBP to Reject Each Petitioner ML20198R0251986-05-24024 May 1986 Informs That G Cook Fully Authorized to Represent Author Re Hearing on Burial of Radioactive Sludge in Navarre Marsh ML20198Q9171986-05-21021 May 1986 Confirms Membership in Author Organization ML20198Q8531986-05-21021 May 1986 Confirms That G Cook Requested to Intervene & Authorized to Speak and Act for Organization ML20195B5611986-05-20020 May 1986 Forwards J Appleton Affidavit Supporting Western Reserve Alliance Opposition to Burial of Low Level Waste at Site ML20198E2081986-05-19019 May 1986 Discusses Onsite Disposal of Radwaste,Per . Silberg Stated That Should Not Be Included in Hearing File Since Author Does Not Meet Formal Legal Requirements.Served on 860522 ML20195F0691986-05-17017 May 1986 Forwards Author Statement Read at 830523 Public Hearing in Painesville,Oh Criticizing NRC.New-Herald 860517 Article Encl.Served on 860604 ML20141J3771986-04-21021 April 1986 Comments in Opposition to Burying Low Level Radioactive Sludge Onsite.Recommends Public Hearing on Onsite Disposal. Served on 860425 ML20203D7501986-04-19019 April 1986 Provides Cover Ltr Inadvertently Omitted from . Forwarding of Notices & Correspondence to Stated Address Requested.Related Correspondence ML20203B3451986-04-16016 April 1986 Requests to Become Party in Matter of Util Burying Radwaste at Facility.Served on 860416 ML20202J8251986-04-10010 April 1986 Requests NRC Consider Statement in Informal Hearing Re Disposal of Low Level Radwaste at Facility.Opposes Site for Ground Burial of Low Level Radwaste.Served on 860415 ML20205M6091986-04-10010 April 1986 Requests to Make Statement at Hearing Re Disposal of Radwaste at Lake Erie Shoreline.Nrc Should Order Util to Find Offsite Facility to Hold Low Level Radwastes.Served on 860414 ML20205M8201986-04-10010 April 1986 Comments in Opposition to NRC Approval of Amend to License NPF-3 to Permit Burial of Radioactive Sludge Onsite.Served on 860414 ML20205M4671986-04-10010 April 1986 Requests to Become Party in Proceeding Re Disposal of Byproduct Matl Onsite Under Terms of 10CFR20.302(a). Organization Intends to Perform Independent Analysis of Possible Impacts of Proposed Actions.Served on 860414 ML20202G6801986-04-0505 April 1986 Requests to Make Limited Appearance Statement Re Facility Radioactive Waste Landfill.Unrestricted Use of Land on Which Sludge Disposed Opposed.Identities & Amounts of Buried Radioisotopes Speculative.Served on 860411 ML20141J3921986-03-0202 March 1986 Requests to Make Limited Appearance Statement Re Onsite Dumping of Low Level Radioactive Sludge ML20141J4011986-02-0101 February 1986 Expresses Concern Re Safe Operation of Facility,Moving Spent Waste from Plant,Earthquakes & Tornados ML20137S2921985-11-27027 November 1985 Submits Comments Re 851009 Environ Assessment & Finding of No Significant Impact Re Util Request to Dispose of Low Level Radwaste Onsite.Approval of Request Should Be Rescinded Due to Impact on Drinking Water Pathway ML20138S0331985-11-13013 November 1985 Requests That Public Hearing Be Initiated & Util Proposal for Permanent Low Level Radwaste Disposal Site on Land Adjoining Plant Near Port Clinton,Oh Be Denied.Proposal Irresponsible ML20210A4821985-11-10010 November 1985 Requests Waiver of Time Period for Comments for 1 Day Due to NRC-related Business ML20138R3221985-11-10010 November 1985 Requests Hearings & Leave to Intervene on Listed Specific Issues of Fact & Law Re NRC Current Consideration for Approval of Procedure for Disposal of Low Level Radwaste Proposed by Util.Corrected Ltrs Encl ML20138R3191985-11-10010 November 1985 Requests 1-day Extension for Comments,Due to NRC Related Business ML20136B4691985-11-0606 November 1985 Comments on Proposed Rule 10CFR50 Re Disposal of Low Level Radwaste Onsite.Nrc Analysis Fails to Take Into Account Effect of Proposed Disposal Method on Lake Erie Which Bounds Davis Besse ML20198C2741985-11-0202 November 1985 Provides Lake Erie Basin Committee Comments on 851009 Environ Assessment & Finding of No Significant Impact.Nrc Insistence on Offsite Disposal of Dredgings from Settling Basin at Facility Demanded ML20133D3151985-08-29029 August 1985 FOIA Request for Documentation Re 850609 Event at Facility, Including Items 2,3 & 4 Referenced in NUREG-1154, NUREG/CR-3530,NUREG-0737,Tech Specs Per FSAR Chapter 16 & OL ML20137S4961985-07-0808 July 1985 Requests Hearing on Evaluation of 850609 Event & Decision on Whether to Allow Restart of Plant ML20134F7321985-06-19019 June 1985 FOIA Request for Vol III of Evaluation of Transient Behavior & Small RCS Breaks in 177 Fuel Assembly Plant, Re Facility ML20195F0831983-05-23023 May 1983 Criticizes Public Hearings as Outrageous Farce,Idioditic & fraudulent.Full-scale Criminal Investigation of NRC Long Overdue ML19338C5481980-06-24024 June 1980 Requests Current Util & State Govt Emergency Evacuation Plans for Facility ML19323J3661980-05-23023 May 1980 Forwards Pages 4,5 & 6 Which Were Inadvertently Omitted from Exhibit a of High Rock Lake Association 800521 Affidavit 1989-02-25 |
Text
,;
A 4
- > L [' c,,7 Of
- )* *' ,~~%===
N November 27,.1985' ,,
Docketing and Service Sectson ag 4gr.
v'5had Orrice or the;5ecretary U.S. Nuclear Regulotory Commissson
.yoshington, D.C. 20555 gg
'3 A10:17 Comments of Ohio Csti ens for Responsible Energy (*0CRE*) on
' Toledo Edison ~Co. and Cleveland Eleceric.Illuminottng Cetit: >:
Envsconmental Assessment and Finding of No significant ImhEEt 9.n i s.
50 red. Peg. 41065 (October o. 1095) ORANCE' Sy the obove-referenced notice, the NRC it.dicates that it has approved the requese by Toledo Edison and CEI, the Davis-Eesse licensees, to dispose of low-level radioactive wastes on the Dovis-Besse plant site. Their request was submitted pursuon to 10 CFR 20.302. This sees on unfortunate precedent.
as no =oubt licensees will now seek opproval to establish low-level waste dumps at reactor sites rather than incurring the cost.of shipping the wastes off-site to o properly Itcensed discosol Fadility.
The NRC-has essentiolly opproved o icw-level waste disposal site which would never meet the requirements of 10 CFR 61. 10 CFR si.50(oi(5) requires that t n'e disposal site be well drained and free of creas of ricoding or frequent ponding, and that waste' disposal shall not take ploce in a 100-year floodplain or wetland. A photogropn of the Davis-Besse f oc 11 t> in the August 1995 quelear Mews showed large creos or stands,g water on the site!
The NRC Ehould not %Cke it so easy FCr reactor licensees to eVode.the 5tondords whicn have been promulgated to protect the Outlic.
The NRC'5 environmental ossessment foiled to Cor5icer the
'drinkin9 Water-ocuotte Food 5 pathway. The OcVis-Besse site 13 odjacent to Lake Eries undoubtedly some of the roticoctivity
ill be -cI*ed Out into Lake Erte.
- Bicoccumulaticn of tne nignly dangerous cesium, cobalt, and songonese isotopes in F.5h or'woterfowl has been toto 11y neglected.
OCRE urges the NRC to rescznd opproval of the request and require TE and CEI to ship their radioactsve wosee5 to o croperly licensed focility meeting the s t o r.d o r d s OF 10 CFC 61.
ssneerely, /
- Ch '3G,W f J Suson L. Hiatt OCRE cepresencoezve 8275 Munson pd.
Mentor, OH 4+060 (016) 253-3159 ,