ML20137R663

From kanterella
Jump to navigation Jump to search
Amend 94 to License DPR-20,revising Tech Specs Re Method for Performing Monthly Operability Test of Containment High Radiation Monitors
ML20137R663
Person / Time
Site: Palisades Entergy icon.png
Issue date: 01/30/1986
From: Thadani A
Office of Nuclear Reactor Regulation
To:
Consumers Power Co
Shared Package
ML20137R669 List:
References
DPR-20-A-094 NUDOCS 8602130361
Download: ML20137R663 (4)


Text

p,M %9 e-

.f "4

UNITED STATES E

i NUCLEAR REGULATORY COMMISSION p

w AsmNGTON, D. C. 20555

\\..../

CONSUMERS POWER COMPANY PALISADES PLANT DOCKET NO. 50-255 APENDMENT TO PROVISIONAL OPERATING LICENSE Amendment No. 94 License No. DPR-20 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by Consumers Power Company (the licensee) dated October 22, 1985, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),

and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public; and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the common

, defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable recuirements have been satisfied.

8602130361 960130 PDR ADOCK 05000255 P

pon

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and Paragraph 3.B. of Provisional Operating License No. DPR-20 is hereby amended to read as follows:

B.

Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 94, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

-[

A Ashok. ~Thadani, Director PWR Project Directorate #8 Division of PWR Licensing-B

Attachment:

Changes to the Technical Specifications Date of Issuance: January 30, 1986

ATTACHMENT TO LICENSE AMENDMENT NO.94 PROVISIONAL OPERATING LICENSE NO. DPR-20 DOCKET NO. 50-255 Revise Appendix A Technical Specifications by removing the page identified below and insert the enclosed page. The revised page is identified by amendment number and contains marginal. lines indicating the areas of change.

REMOVE INSERT 7 4-7 9

v-sm w

TABLE 4.1.2 Minimum Frequencie's for Checks, Calibrations and Testing'of Engineered Safety Feature Instrumentation Controls (Contd)

Surveillance Channel Description Function Frequency

' Surveillance Method 5.

Containment High Radiation c.

Test' M(

c.

Electronic. circuit check of' signal t

Channels (Contd) amplifier to verify proper indicator operation.

d.

Test R

d.

Simulation of CHR 2/4 logic trip with-test switch to verify' actuation relays,.

including containment isolation.

6.

Manual SIS Initiation a.

Test R

a.

Manual push-button test.

7.

Manual Containment-Isolation a.

. Test R

a.

Manual push-button test.

Initiation b.

Check R

b.

Observe isolation valves closure.

8.

Manual Initiation Contain-a.

Test R

a.

Manual' switch operation.

ment Spray Pumps and Valves 9.

DBA Sequencers a.

Test Q

a.

Proper operation will be verified during SIS actuation test of Item 3(a) above.

k 10.

Normal Shutdown Sequencers a.

. Test R

a.

Simulate normal actuation with' test -

E operate switch and verify equipment g

' starting circuits.

S 11.

Diesel Start

.a.

Test.

.M a.

Manual initiation followed by synchro-zo nizing and loading.

gg b.

. Test R-b.

Diesel start, load shed, synchronizing and loading will be verified during Item 3(b) above.

c.

Test P

c.

Diesel auto start initiating circuits.

4.

12.

SIRW Tank Level Switch a.

Test R

'a.

Level switches removed from fluid'to Interlocks verify actuation logic.

1 i