ML20137Q929
| ML20137Q929 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 02/03/1986 |
| From: | Logue R PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | Muller D Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737, TASK-2.K.3.03, TASK-TM NUDOCS 8602070124 | |
| Download: ML20137Q929 (1) | |
Text
PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101 1215)8414000 February 3, 1986 Docket Nos. 50-277 50-278 Mr. Daniel R.
Muller, Director BWR -Project Directorate #2 U.S. Nuclear Regulatory Commission Washington, D.C.
20555
SUBJECT:
1985 Annual Report on Safety / Relief Valve Challenges at Peach Bottom Atomic Power Station
Dear Mr. Muller:
This represents the 1985 annual report on safety / relief valve challenges for the Peach Bottom Atomic Power Station as required by the TMI Action Plan, NUREG-0737, Item II.K.3.3.
The definition of challenges considered in this report is the automatic opening of the primary coolant system safety or relief valves in response to high reactor pressure.
During 1985, there were no challenges to the primary coolant system safety and relief valves on Peach Bottom Units 2 and 3.
Should you have any questions regarding this matter, please do not hesitate to contact us.
Very truly yo I
i <- -
v R.
H.
gue D
Superintendent Nuglear Services cc:
T.
P.
Johnson, Resident Site Inspector f
EB (LIAW)
PSB (La ItULMAN) 8602070124 860203
$ $ h EICSB (SRINIVASAN)
DR ADOCK 05000277 RSB (ACTING) y0B (VASSALLO) ppg ig AD - G. LAINA$ (Ltr only)
'