Pubhc Service Electric and Gas Company Corbin A. McNeill, Jr. PubhcService Elecincand Gas Company P.O Box 236,Hancocks Bridge NJ 08038 609 339-4800 VICe Pres dent .

Nuclear January 28, 1986 U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Licensing Washington, DC 20555 Attention: Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing Gentlemen:

PUMP AND VALVE TEST PROGRAM UNIT NO. 2 DOCKET NO. 50-311 SALEM GENERATING STATION Pursuant to the guidance provided in your letter dated April 12, 1983, we have amended our Pump and Valve In-Service Test (IST) Program to include Fire Protection and Emergency Diesel Generator Auxiliary Systems.

We have also made several changes to the Program based on NRC approved testing requirements of ASME Section XI, 1980 Edition and Addenda through the Winter of 1980. These changes, for which we have previously requested relief for Salem Unit No. 1 from the 1974 Edition and Summer of 1975 Addenda of ASME Section XI, are as follows:

i f a. The pump testing interval (subsection IWP) was increased from every thirty (30) days to every ninety (90) days.

l l

l b. The Category "E" valves (subsection IWV) testing require-ments were removed from the IST Program.

i' Attachment 1 is a resubmittal of our IST Program superseding, i in its entirety, our last IST Program submittal dated February l 2, 1981 and incorporating the above modifications as well as j the following general changes:

pg pd:/3d4J , i (8nro 1 8602050299 D60120 PDR ADOCK0500g1 P  ;

Mr. Steven A. Varga a. Revised the key testing requirements (Part 2, Item 2).

b. Added valves due to Plant Modifications.
c. Added valves identified in our total program review.
d. Revised the valve location coordinates to correspond to new P&ID revisions.
e. Added a remote position indicator verfication test requirement.
t. Added valves and changed valve categories in accordance with PSE&G Nuclear Engineering Department Directives.

Should you have any questions, we will be pleased to discuss them with you.

Sincerely, Attachment C Mr. Samuel J. Collins, Chief Projects Branch #2, DPRP Region I Mr. Donald C. Fischer Licensing Project Manager Mr. Thomas J. Kenny Senior Resident Inspector