ML20137P681

From kanterella
Jump to navigation Jump to search
Forwards Listings of Sealed Source & Device Pending Cases as of 970402
ML20137P681
Person / Time
Issue date: 04/08/1997
From: Camper L
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Caniano R, Dan Collins, Costello F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
SSD, NUDOCS 9704090298
Download: ML20137P681 (14)


Text

-April 8, 1997 MEMORANDUM TO: Frcncis M.' Costsilo, Chi f Nucl:ar Mit2rirls Saf:ty Branch lil, RI

  • i D:$glas M. Collins, Deputy Director  ;

Division of Nuclear Materials Safety, Ril Roy J. Caniano, Deputy Director ,

. Division of Nuclear Materials Safety, Rlll i i

Linda Howell, Ct.:ef .

Nuclear Materials inspection Branch, RIV l 1

D. Blair Spitzberg, Chief  ;

Nuclear Materials Licensing Branch, RIV Frank Wenslawski, Chief Walnut Creek Field Office, RIV ,

FROM: Larry W. Camper, Chief original signed by: l Medical, Academic, & Commercial j Use Safety Branch Division of Industrial and Medical Nuclear Safety, NMSS

SUBJECT:

STATUS OF SEALED SOURCE AND DEVICE REQUEST FOR REGISTRATION g Attached are listings of the sealed source and device pending cases as of April 2,1997. Attachment 1 contains actions that were submitted as a technical assistance request from headquarters or the regions, and attachment 2 lists those actions that 1

I have been filed directly by the vendor, for product evaluation and registration.

.I l

Attachments: As stated

Contact:

KimBerly Randall, NMSS (301) 415-7857.

DISTRIBUTION: w/ enclosures

' SGreene, IMAB VCampbell, RIV SSSS Staff w/o encl1. j JKinneman, Ri JPiconne, IMOB NMSS r/f IMAB r/f /

JMadera, Rill . CHosey, Ril SSSS r/f IMNS Central JPotter, Ril MShanbaky, RI SKimberty, LFMB DCool GJackson, LFMB JJohansen,RI BJHOLT, Rlli BPrange,RIV WCFO GShear, Rill FCombs Mmeenan, Rlli . LJacobs-Baynard, PMDA SVi!!ar, RI Tdecker,Ril NEO2-SSD-7 MPhillips, Rill CCain, RIV .

CPederson, Rill JJoyner,Ri DChamberlain, RIV ABlough, RI ,, 1 ,

DOCUMENT NA .ME: G:\ Regions.Re.g ......ci.w . con

. .w ano b .c$,4

..m . n .nv. o,. r - c.,, -,in .ti.cnm.nt/.ncio.o . w . u. c.,,

v. cf. ...n.' . _

hOFFICE .!MAB w l' IMAB O l f% l l l 0 nmber 0 INAME NA. TEQ_/p97 KRand'a'li~ ISBaggett (dj ' /97 T

/ L f 97  ! O i

40 298 97040s 7 IRPpEpppMBE SSD pop.

m - --__ - --

f:.

  • AttaClDent 1 Pending Sealed Source & Device Actions c Tied to Licensing Actions l By Region for the' period 1/1/01 to 4/2/97 l Actions recorded as of Wednesday, April 02,1997 i HQ i e case (s) Assignea to Meviewer(s) Iotating 5 Action (s) control Assign, s >

Number Actions Reviewer Company Model Numbers ]

021878 96-104 Kirkwood KMde Fenwal. Inc. CPD 705X Smoke Detector l 1 s

?

021882 96-105 Burgess Detection Systems, Inc. DS260 lonization Smoke Detector  ;

' i 021890 9743 Brown Hesco. Inc ML 416XX, ML 404 l I

021991 97 Brown Hocniki Amenca Corp Sl_Senes 1

0216650 96-45 Brown E 1. Company El 100 BUS,100 SUS,100LUS  ;

-I l

l l

l 1

1 e

1 Sealed Source Safety Section i

I

1 i

1 Pending Sealed Source & Device Actions l Tied to Licensing Actions l By Region for the period 1/1/01 to 4/2/97 l Actions recorded as of Wednesday, April 02,1997 i l

R1 i z case (s) Assignea to Reviewer (s) iotaling lb ACIlon(s) f i

control Assign, s '

Number Actions Reviewer Company Model Numbers 109601 96-113 Broaddus Safety Light Corporation Vanous l 14  ;

.)

i 120195 94-60 Broaddus Bethlehem Steel Corp 28-8B <

1 I

i i

i I'

i i

[

l t

i i

1 Sealed S,ource Safety Section i

. Attachment 2 i

'Y

.: j l-Pending Sealed Source & Device Actions.  ;

Actions received during the period 1/1/01 to 4/2/97 For actions recorded as of Wednesday, Apri! O2,1997 l

Date Assign. s Received Reviewer Actions Company Model Numbers Status i

10/17/94 9440 i Broaddus 1 Bethlehem Steel Corp. 28 8B To fees on 11/1/94. l Ltr frm fees to Bethlehem Corp. req. additonal fees. t 116/94.

Rtrned frm fees on 1/5/95.

def Itr 1/31/95 to request >

~

complete package.

30 day abandonment ltr sent l 9/8/95. ,

Revd reply frm abandonment  !

ter on 10/10/95.

12R/94 94-82 Brown 1 Dept. of the Air Force MNRS To fees on 12/14/94. ,

Rtrned frm fees on 12/23/94.  ;

draft def ltr and tech rpt 3/2/95. gave to D. Tang to review 3/6/95 Discussed in detail dunng i 4/4/95 mtg 4 Steve worked closely w;th Jupiter on Numerous occasions- Trng DEF LTR 05/11/95, Def. call on 9/22/95.

! 30 day vod ttr sent on 11/16/95 Action has been transferred to C. Brown on 2/26/96.

Resp reevd on 2/21/96.

Def. call on 9/24/96 l

I a

l l

l 1 Sealed Source Safety Section 1

1

i t

Pending Sealed Source. & Device Actions  !

Actions received during the period 1/1/01 to 4/2/97 l For actions recorded as of Wednesday, April 02,1997 ,

Date Assign. # ,

Received Reviewer Actions Company Model Numbers Status 4/6/95 95-33 Broaddus 1 IMS 5245 To fees 4/10/95. Fee ok L 5/1/95.

Approved for one model, ,

remainder of amendment under review as of 6/22/95.

Def. ltr sent on 7/24/95.

Awaiting Def. response.

Action has been transferred to D. Broaddus frm M. Perkins as a 8/14/95.

Def. resp. revd on 3/6/96.

Def. Itr sent on 3/21/96.

Revd def. resp. on 4/19/96.

Def. resp. on 04/19/96.'

I 5/9/95 95-44 Broaddus 1 Dept. of Army CAM NR-155-D-119-S to fees 5/12/95. fee OK 5/16/95. l Def. ltr sent on 7/20/95.

Action has been transferred to D. Broaddus frm M. Perkins as of 8/14/95.  !

Resp. revd on 10/18/95.

Def. call on 9/27/96.

Resp revd by fax on 9/27/96.

Def. call on 11/20/96.

Resp revd on 12/12/96.

5/19/95 95-47 Broaddus 1 Sony Chemical Corp WG8 new custom device to fees 5/19/95. fee OK 5/24/95.

Def. Itr sent on 7/15/96.

Resp. revd on 12/6/96 2 Sealed Source Safety Section

i h

i  ;

Pending Sealed Source & Device Actions Actions received during the period 1/1/01 to 4/2/97

. l' For actions recorded as of Wednesday, April 02,1997 i

Date Assign. # 4 Received Reviewer Actions Company Model Numbers Status  :

i 6/13/95 95-54 f Burgess 1 Hauni Rchmond, Inc- 23144-0 DS To fees with ek on 6/15/95.  !

Rtmed frm fees on 6/16/95.  !

Assened to M. Bur 9ess on i 10/4/95. t

. Def. Itr sent on 2/14/96. I' Def. ltr sent on 5/02/96. ,

Resp. expected on 8/1/96.

Resp. revd on 7/31/96. ,

Def. call on 11/8/96 i Def. Resp. on 12/26/96 ,

Def ltr sent on 1/16/97.

Revd resp. on 1/29/97. +

Def ftr sent on 03/24/97.

l I

l 11/17/95 95-115 ,

Smith 1 Seaman Nuclear Corp. C-NOO To fees on 11/27/95. l Rtrned frm fees on 12/6/95.

l RUSH Def. ltr and fax sent on 8/14/96

30 day void letter sent on 10/16/96 Partial resp. rcvd from consultant on 10/21/96.

Revd other def. resp on j 12/17/96.

Revd 3rd partial resp on 1/22/97.

Still waiting for 4th resp from ttr sent on 8/14/96 Revd partial def resp on 2/3/97.

1 3 Sealed Source Safety Section J

k i

. . _ . . ~ . . , . . _ _ - _ - - - __

1 f

Pending Sealed Source & Device Actions l Actions received during the period 1/1/01 to 4/2/97 ,

For actions recorded as of Wednesday, April 02,1997 i Date Assign. #

Received Reviewer Actions Company Model Numbers Status  ;

2/13/96 9649 Smith 1 Ohmart SH-F, SH. SR Seres To fees on 2/15/96. i Rtrned frm fees on 2/16/96 i Action will be reassigned to j

Enc Jamerson Action has been reassigned i to B Smith on 7/22/96.  !

5 3/22/96 96-14 Burgess 1 Dept. of the Army M64A1 To Fees on 3/25/96.

Rtmed frm fees on 4/1/96, I

Def. Itr sent on 7/22/96 Resp. rcvd on 8/6/96.

i 3/25/96 96 16 Burgess 1 Elscint Inc. CTACT Tc fees on 3/25/96. l' Rtrned frm fees on 4/1/96 Def. call on 8/1/96.

Def resp. on 8/2/96 ,

Def. ltr sent on 8/7/96 Extension request granteo .  !

(resp is due on Oct 7,19% )

Extension request granted -

' (resp due on 10/21/96 )

Resp revd on 10/22/96.

Def. Itr sent on 1/29/97.

L i

I 4/24/96 96-35 Brown 1 DMW Geophysical EUD1, TUD1 N/A from fees l

4/24/96 96-33 Brown 2 Industrial Reator Labs Source N/A from fees 4/24/96 96-34 Brown 1 Industnal Reator Labs Gauge N/A from fees 4 Sealed Source Safety Section

I

. i Pending Sealed Source & Device Actions  !

Actions received during the period 1/1/01 to 4/2/97 l For actions recorded aS of Wednesday, April 02,1997 Uste Assign. #

Received Reviewer Actions Company Model Numbers Status ,

i

. 4/24/96 96-32 Brown 1 Martin-Manetta LCG-25A N/A from fees ,

I 6/24/96 96-31 Brown 2 Thiokol Corporation 343812,343814 N/A from fees .

Def call on 2/21/97.

Def. resp revd on 3/3/97,  !

4/26/96 96-36 Brown 1 Stock Equipment 026752 To fees on 4/29/96.

Company Rtrned frm fees on 5/3/96 .

1 4/26/96 96-38 Burgess 1 TWA Rigd guide tube To fees on 5/2/96  ;

Rtrned frm fees on 5/21/96 [

Additionalinf revd on  ;

Bf26/96.

l 1

l j

4/30/96 96-37  :

Burgess 1 Amencan Air'ines Rigid guide tube /colkmater To fees on 5/1/96 N*w Fee I rukng Rtrned frm fees on 5/28/96.

i Additional inf. ecvd on 8/26/96.

5/1/96 96-43 Smith 4 Onmart Corporation SHLG/SHN T o fees on 04/1'/96 Rtrr.ed frm 4/24/96 Reissued a new assign no.

I Same as 96-21 Action will be reassigned to Enc Jamerson.

Action has been reasssignej to B. Smith on 7/22/96.

1 5/21/96 96 44 Brown 1 Mirtone industnes, Inc. 73470u To Fees on 6/6/96 Rtrned frm fees on 7/26/96 6/3/96 9645 Brown 3 E I Company El 100 BUS,100 SUS,100LUS To Fees on 6/6/96 Rtrned frm fees on 7/5/96 I

S Sealed Source Safety Section

i.  :

L Pending Sealed Source & Device Actions l Actions received during the period 1/1/01 to 4/2/97 J

For actions recorded as of Wednesday, April 02,1997 1

Date Assign. #

, Received Reviewer Actions Company Model Numbers Status  !

J 6/10/96 96-48 Compton 1 Panasonic industnal WE 2001 Senes To Fees on 6/17/96.

Co. Rtrned frm Fees on 7/26/96 Action has been transferred from D Broaddus to E.

Compton.

6/11/96 96-50 Copton 1 Frank Barker Gammamed 12i To Fees on 6/19/96.

Associates Rtrned frm fees on 7/26/96.

' Action has been transfe ved from D. Broaddus to E. ,

Compton.

6/12/96 96-55 Smith 1 ETG, Inc. ICAM To Fees on 6/16/96 i Rtrned frm fees on 11/13/96 l for nonpayment of fees.

Apphcant pd fees ar'd schon was rtrned to fees for

' payment on 11/22/96 Rtrned frm fees on 12/30/96.  !

Def. Itr sent on 1/23/97. l 30 day Itr sent on 03/20/97 l

l l

l 7/12/96 96-60 Brown 1 Mine Safety Appliances 706CA,706WA, 706PA To Fees on 07/16/96 .

Co. Rtrned frm Fees on 7/26/96.

Action has been transferred i

)

from M Burgess to C Brown. )

Def. call on 2/20/97. .

Def. resp revd on 3/4/97. I i

i i

l i

6 Sealed Source Safety Section l

i l

1

i Pending Sealed Source & Device Actions '

Actions received during the period 1/1/01 to 4/2/97 For actions recorded as of Wednesday, April 02,1997 Date Assign. s Received Reviewer Actions Company Model Numbers Status 8/2/96 96-68 1 Perkin-Elmer PE Photovac 200155 To fees on 8/5/96.

Smith Corporation Rtrned frm fees on 8/16/96.

Def. call on 1/15/97 and 1/16/97.

Revd def. resp on 1/21/97. '

Held mtg with Perkin-Elmer on 1/30/97 to discuss def.

Def. nr sent on 2/14/97. ,

Revd def resp. on 2/27/97 i

5 8/16/96 96-84 Brown i Chrompack inc 902,902A,902B To Fees on 8/20/96 Rtrned frm fees on 8/22/96.

Def. call on 2/21/97, No resp. to def call on 2/21/97 per C. Brown. l Def Ltr sent on 03/20/97 I

l l

l 8/19/96 96-85 To Fees on 8/20/96. i Brown 1 Agfa Corporation BKG 40823-01 Rtmed frm fees on 8/22/96. ]

l O/25/96 96-87 Burgess 1 Dept.of Agnculture Husman Irradiator To fees on 9/30/96.

Rtrned frm fees on 10/4/96.

Def, call on 9/25/96 30 day vod ltr sent on 1/17/97.

7 Sealed Source Safety Section

l.

i i

Pending Sealed Source & Device Actions i l Actions received during the period 1/1/01 to 4/2/97 4

For actions recorded as of Wednesday, April 02,1997 Date Assign. s Received Reviewer Actions Company Model Numbers Status j 10/2/96 96-93  ;

Bur 9ess 1 Gray

  • Star, Inc, Gray
  • Star To Fees on 10/11/96.  ;

i Rtmed frm fees on 11/5/96.

Additionalinformation rcvd on  ;

11/29/96 Rtmed back to Fees on -

- 12/23/96- ,

Rtmed frm Fees on 12/30/96. i Def. Itr sent on 1/27/97.

i 10/4/96 96-91 i I

Smith 1 Dept of the Army M22 ACADA To fees on 10/4/96 Rtrned frm fees on 11/5/96 Def. call on 1/10/97 Revd partial def resp on 1/17/97.  ;

i Revd partal resp on 2/7/97 I Revd partial rest on 2/19/97. l Revd partial resp on 2!26/97. l l

'.i i

1 l

10/9/96 96-103 Rich 1 Alaska State of 2119 02 To fees on 10/16/96.

Fairbanks Rtmed frm fees on 11/5/96.

4 l

10/11/96 96-102 i Smrth 1 IRIS Control Cable Housing To Fees on 10/15/96 Rtmed frm fees on 11/5/96.

Def. call and Lir sent on 1/9/97.

Partial resp, revd on 2/19/97.

30 day ltr sent on 3/24/97 4

8 Sealed Source Safety Section

I f k

Pending Sealed Source & Device Actions j Actions received during the period 1/1/01 to 4/2/97 j

For actions recorded aS of Wednesday, April 02,1997 i

Date Assign. s '

Received Reviewer Actions Company Model Numbers Status 10/24/96 96-104 Kirkwood 1 Kdde Fenwal, Inc. CPD 705X Smoke Detector To Fees on 10/25/9C. f Rtmed frm fees on 10/30/96 Def. call 2/20/97.

i f

11/13/96 96-105 '

Bur 9ess 1 Detection Systems Inc.. DS260 lonization Smoke To Fees on 11/14/96 .

Detector Rtrned frm fees on 12/24/96.

Def. call on 1/30/97.

Def. resp. on 1/31/97.

A 11/14/96 9C 106 Brown 1 Apgee Corporaton 31000 Seres To Fees on 11/14/96. ,

Action has been transferred to C. Brown 11/14/96 96-107 Broaddus 1 Theratronics 1000E Senes To Fees on 11/14/96 Rtrned frm fees on 11/29/96 11/14/96 96-108 Droaddus 1 Theratronics 780 Seres To Fees on 11/18/96.

Rtrned frm fees on 11/29/%.

12/11/96 96-113 Broaddus 14 Safety Light Vanous To fees on 12/11/96 Corporation Rtmed frm fees on 1/21/97 12/24/96 96 116 Lubinski 1 Hauni Richmond, Inc. Sul To Fees on 1/6/97 Resubmittal of 96-06 (void file).

Rtmed frm fees on 1/21/97.

1/30/97 97-03 Brown 2 Hesco, Inc. ML 416XX, ML 404 To Fees on 1/31/97.

Rtmed frm fees on 2/21/97.

9 Sealed Source Safety Section

Pending Sealed Source & Device Actions  ;

Actions received during the period 1/1/01 to 4/2/97 For actions recorded aS of Wednesday, April 02,1997 -

Date Assign. s Received Reviewer Actions Company Model Numbers Status 2/3/97 97-04 Brown 1 Hochiki Amenca Corp- Sl_ Seres To Fees on 2/4/97. ,.

Rtmed frm fees on 3/20/97.  !

2/5/97 97-05 Compton 1 IRM TG-2. To fees on 2/6/97,  ;

Rtrned frm fees on 3/14/97.

2/25/97 97-07 Brown i Nuclear Research SH-301, SH-302. SH-352 To fees on 2/26/97.

Corp. Rtrned frm fees on 3/3/97.

i 3/3/97 97 08 ,

Smith 1 ION TRACK VARIOUS To Fees on 3/6/97. )

INSTRUMENTS, INC Rtmed frm fees on 3/18/97.

3/7/97 97 09 Unassgned 1 Ohmart SHRD To fees on 3/7/97 Rtrned frm fees on 3/18/97.

3/7/97 97-10 Brown 1 SMV Amenca PS 96 To Fees on 3/11/97 Rtrned frm fees on 3/18/97 3/11/97 97-11 Unassgned 1 Ohmart Corporation SHLM-BX, SHLM-CX, To Fees on 3/11/97, SHLM-BR SERIES, CR SERIES Rtmed frm fees on 3/18/97.

' 3/17/97 97-12 Unassgned 1 Brandhurst. Inc. B100-X Seres To Fees on 3/21/97.

i i

3/17/97 97 13 Unassigned 1 Brandhurst. Inc. S, CT, CC, RT, RC, DA, DR To Fees on 3/21/97.

3/18/97 97-19

, Unassgned 1 21st Century Senes 100 - 900 To Fees on 3/21/97.

Technologies I

i i

10 Sealed Source Safety Section l

P 4

Pending Sealed Source & Device Actions Actions received during the period 1/1/01 to 4/2/97 For actions recorded as of Wednesday, April 02,1997 Date Assign. #

Received Reviewer Actions Company Model Numbers Status

) l 3/18/97 97-20 Unassigned 1 BHP Petroleum 13320 To Fees on 3/21/97.

America 3/18/97 97 14 Unassgned 6 Brun Sensor Systems. ML-L 35-0101,02 0036-ML 1, To Fees on 3/21/97, Inc. ML 15, ML 1-4 >

3/18/97 97 15 '

Unassi9ned 5 Brun Sensor Systems,35-201,208,402.403,404.307,10 To Fees on 3/21/97 inc.

3/18/97 97 16 Unassgned 2 Capintec, Inc. CR-168E 154E,178E,164E, To Fees on 3/21/97, 165E,486E 3/18/97 97-17 Unassgned 6 Cumberland Research P,120,120,285, CRC 120A To Fees on 3/21/97. l Corp 100 )

3/18/97 97 18 Unassgned 13 Cumberland Research P, R. AB. VXR,GPL, A-217, To Fees on 3/21/97.

Corp. R-100,120, MH 3/20/97 97 21 Unassgned i lon Track Instruments Models 27,58,62,70, & 75 To Fees on 3/26/97, See also 94-09 3/21/97 97 22 Unassigned 1 Isotope Measunng Model 5321 To Fees on 3/26/97 Systems Total Open Case (s)is 59 Totaling 107 Action (s)

I 11 Sealed Source Safety Section

_