4d1:1-ABB e
March 27,1997 Docket No. 70-36 i
License No. SNM-33 Mr. Michael F. Weber, Chief Licensing Branch Division of Fuel Cycle Safety and Safeguards, NMSS U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
CRITICALITY SAFETY PROGRAM UPDATE QUARTERLY STATUS REPORT
Dear Mr. Weber:
Enclosed is the second quarterly status report on our Criticality Safety Program Update (CSPU), per our commitment contained in the CSPU Plan dated September 20,1996.
This program was undertaken to formalize and strengthen our criticality safety program, taking into account recognized industry standards.
Progress for this period on the CSPU is essentially on schedule. Performance against the schedule should continue during the next quarter, as staffing has been augmented by the addition of a full-time criticality safety professional based at Hematite and the addition of drafling support. Attached is an updated Gantt chart.
Should you have any questions conceming this report, please contact me or Rcbet Freeman, the CSPU project manager, at (314) 937-4691.
Very truly yours, COMBUSTION ENGINEERING,INC.
w
()k i
Robert W. Sharkey Director, Regulatory Affairs RA$$7 cc: Tim Reidinger, Region 111 9704090290 970327 f3 PDR ADOCK 07000036' l%,E%Egggg C
PDR 000065 ABB CENO Fuel Operations Combustron Engineenng. Inc.
3300 State Road P -
Telephone (314) 937-4691 Post Offee Box 107 (314) 296-5640 Hematite, MO 63047 Fax (314) 937 7955 w
~
Enclosure I to RA557 8
e CRITICALITY SAFETY PROGRAM UPDATE SECOND QUARTERLY STATUS REPORT COMBUSTION ENGINEERING,INC.
MARCII 27,1997
.~
- ~..
.- ~
d I.
INTRODUCTION n
Findings from our self assessment program, as emphasized during NRC inspection 70-36/96-202, highlighted the need for increased documentation and formalization of our criticality safety program. Specifically identified _were the l
need to expand and strengthen procedures, provide additional training to i
personnel involved with SNM handling and processing, and streamline the change management and configuration control process. It was decided to develop a comprehensive improvement plan that would encompass all aspects of criticality safety. This plan, called the Criticality Safety Program Update
.(CSPU), was presented at a management meeting held at NRC Headquarters on
= August 14,1996. A further description of the plan elements was submitted to the NRC Licensing Branch on September 20,1996. Th; 'SPU consists of two s is Update. The major elements: The Administrative Update and the Ana t
' Administrative Update addresses programmatic revisions and the Analysis Update will result in improved safety bases documentation. This report is the second quarterly status report on the progress made in implementation of the CSPU plan. The first quarterly progress report was submitted on December 20, 1996.
11.
ADMINISTRATIVE UPDATE STATUS The progress made and status of plan elements as described in our September 20 plan to date are shown below.
t 1.
Present plan to NRC The Criticality Safety Program Update was presented to the NRC on August 14,1996.
Status: Complete.
2.
Submit reply to criticality safety NOV from inspection 96-202 The reply to NOV 96-202 was. submitted on September 13,1996.
Status: Complete.
f 3.
Submit plan to NRC j
The Criticality Safety Program ' Update plan and schedule was submitted to NRC on September 20,1996.
I b -"
m
- m m
m
Status: Complete.
4.
Quarterly Progress Report to NRC l
This report is the second quarterly status report on the progress made in ir implementation of the CSPU plan.
Status:- As scheduled. The third status report will be submitted by the end ofJune,1997.
5.
Revise ISA schedule CE submitted a schedule on January 26,1995, for conducting Integrated Safety Assessments (ISAs) for the IIematite Plant in fulfillment oflicense commitment 1.6(e). This schedule significantly underestimated the effort required to conduct ISAs of the required scope. A letter transmitting a revised schedule and scope for conducting the ISAs was submitted to NRC on November 12,1996.
Status: Complete. On November 19,1996, NRC replied that the revised schedule is acceptable.
1 1
4 4 -
III.
CONFIGURATION CONTROL STATUS 1.
Revise Change Management Process The level of review required and the responsibilities concerning plant change management were to be specified. The required scope ofinput to a change request were to be defined. The various procedures governing change management were to be integrated into a more efficient and harmonious change program.
a)
Form team: A cross functional team of plant personnel was formed to study enhancements to the change management process.
+
b)
Establish requirements: The team reviewed the current change management program with respect to license requirements and customer commitments. The team determined the aspects of the change management process needed for the Hematite facility. 'lhey set the goals of the revised process and proposed methods for achieving those goals.
2 4
4
..z---
e r
e v,
i i
9 c)
Proceduralize: The team prepared a draft procedure whose purpose is to ensure that changes to processes, equipment, and or facilities that affect nuclear criticality, radiological or industrial safety are properly evaluated. In addition to specifying the review process, this procedure assigns responsibilities for each step of the process.
i d)
Automate Change Management Process: The process improvement team (PIT) set an objective of migrating the paper driven change management process to a' computer based system. Completion of this task has been extended to allow development of the automated approach and to integrate it with the improvements planned for the site management information system later this year. In the interim, recent modifications to the current management of change process j
and issuance of the Criticality Analysis Procedure (CAP) will ensure regulatory commitments are met and satisfies the intent of the CSPU.
Status: Incomplete. As stated above, the Criticality Analysis Procedure (CAP) will ensure regulatory commitments are met and satisfies the intent.
of the CSPU. However, further improvements are planned in the overall process and procedures.
2.
Centralize Document Control Comprehensive basis documents consisting of the current plant
.l configuration and the nuclear criticality safety basis produced in the course of the CSPU will be controlled under a Central Document Control system.
The goal of this action is to produce archived, retrievable and auditable criticality safety documentation.
I Status: Document control has been centralized in Building 110 (the front office building) Change management packages are being added to the Central Document Control system when completed. Additional documentation resulting from the CSPU will be added when generated and approved.
)
3.
Surveillance testing The installation of the Preventive Maintenance / Calibrations program.
Nuclear criticality safety inspections, maintenance and calibrations required by license are to be tracked by this program to ensure they are performed on schedule.
3
. ~.
Status: Building data records set. A PM database has been established for Plant Facilities and for Production. Records are currently being added to the database.
- 4..
Criticality Safety Program (RAAP-109) l The Criticality Safety Program documents policy and provides for the l
administration of the program. It describes the programmatic elements of the SNM license which concern design bases, changes and modifications, procedures and postings, configuration management, and nuclear criticality accident alarm systems.
Status: Complete. This document has been approved and issued.
5.
Criticality Analysis Procedure (RAAP-108)
The Criticality Analysis procedure establishes the requirements for performing a Nuclear Criticality Safety Evaluation. This procedure will formalize the evaluation and documentation of the bases and assumptions affecting criticality safety process limits and the controls used in the analyses and evaluations.
I Status: Complete. This document has been approved and issued.
4 4
3 6.
Commitment / Corrective Action Tracking (RAAP-102) i The Commitment / Corrective Action Tracking program / procedure has been revised to ensure that commitments made by management personnel to the NRC and to other specified personnel, organizations, and agencies are tracked and that management attention is applied to overdue commitments.
Status: Complete.
2 III.
LICENSE UPDATE 1.
Revise chapter 4 of SNM-33
~
Chapter 4 of SNM-33, Nuclear Criticality Safety has been revised to i
incorporate applicable portions of the CSPU. Typographical errors were corrected and license conditions reworded to clarify their meaning. An amended Chapter 4 will be submitted to NRC Licensing when internal review is completed.
j l
i-4
1 l-
)
Status: Final review and management approval in progress. Submission to NRC will be made within the next week.
c
'IV.
TRAINING d
1.
Training Program (RAAP-121)
/
The training program describes the General Employee Training (GET) program and stipulates Nuclear Safety training requirements. Testing requirements and minimum test scores have been established. Retraining intervals are specified.
Status: Complete.
2.
Professional training for Management, Supervisors and Engineers Professional training provided to managers, supervisors, and engineers has E
been increased. The goal of the training is to educate personnel concerning the factors affecting nuclear criticality safety, the requirements of the NRC license, and internal procedures. The training will enable these personnel to recognize the impact of process parameters on the nuclear criticality safety of the operation and the importance of com.municating good nuclear criticality safety practices to the Fuel l
Manufacturing operators.
Status: Management, supervisors and engineers received criticality safety training during the fourth quarter of 1996. The next training sessions are scheduled for March 31. Additional training will be conducted as the CSPU progresses.
3.
Operators 4
1 Continued training is to be provided to operators in the area of Nuclear i
Criticality Safety. The training includes safe movement and storage of material, the requirements of the NRC license, and internal procedures.
Status: Biennial criticality safety retraining was conducted during the last quarter. Specific training was also conducted in the safe movement and i
storage of material, and restart of the liquid waste systems following the chemical reaction event in August. Additional training will be conducted as the CSPU progresses. We also added a new staff position since initiation of the CSPU to specifically review plant operations and provide operator training. The initial emphasis of this position was to review 5
current operations with respect to criticality safety procedures and
~
postings. As a result of this very introspective review many improvements 2
were suggested and implemented regarding criticality safety practices, procedures and postings. Several criticality safety training sessions were also conducted for specific plant areas.
V.
SELF ASSESSMENT PROGRAM
)
1.
Internal Audits / Inspections Procedure (RAAP-110)
Internal audits and inspections are to be formalized by establishing a
. written program and process for the conduct of safety related audits and inspections of Nuclear Fuel activities and operations. The program r
defines audits and irispections and establish the responsibility for their -
conduct, frequency, scope, and closure.
. Status: Procedure has been written and is undergoing management review.
i 2.
Abnormal Event / Occurrence Reporting Procedure (RAAP-105)
The Abnormal Event / Occurrence Reporting procedure will establish a more formalized and auditable process for the investigation, P
documentation, and establishment of permanent corrective action.
Status: Procedure has been written and is undergoing management review.
1 t
VI.
ANALYSIS UPDATE i
1.
Conversion a)
Plant configuration: The current plant configuration and process flow diagrams were reviewed against existing documentation. The following items have been verified and updated as required:
i i)
P&lDs: Schematic diagrams ofitems with criticality safety i'
implications have been revised and verified.
.i n
ii)' Drawings:- Layout drawings of the equipment in which the accumulation of more than a safe mass of SNM is possible will be reviewed. The relative positions and critical dimensions of each item will be verified against information used for the existing ISA.
j e
4 6
1
i' l
l Status: P&lD and layout drawings for the conversion process have been reviewed and revisions are complete. 'Several layout drawings and many component drawings remain to be verified. They are being carefully examined and verified during the analysis stage of the conversion analysis update.
b)
Safety. Basis: Documentation inch: ding KENO analyses, hand
[
calculations, and change requests will be gathered from files at both -
Windsor and Hematite and repeated as necessary.
1 I
Status: Activity in this area is about 25% complete.
2.
Recycle / Recovery a)
Plant configuration: The current plant configuration and process j
flow diagrams will be reviewed against existing documentation. The l
i following items will be verified and updated as required:
i)
P&lDs: Schematic diagram ofitems with safety implications.
ii) Drawings: Layout drawings of the relative positions and critical dimensions of equipment in which the accumulation of more than a safe mass of SNM is possible.
Status: Although not scheduled to be done until later, the chemical reaction event in August required changes in the configuration of recovery L
filtrate, recycle scrubber solution and mop water liquid systems prior to restart of these processes. Various P& ids were revised to reflect these changes.
b)
Safety Basis: Documentation including KENO analyses, hand calculations, and change requests will be gathered from files at both Windsor and Hematite and repeated as necessary.
Status: Documentation pertaining to the liquid waste systems was L
reviewed in conjunction with the proposed configuration changes.
c)
. Evaluation: After the existing documentation is assembled, each category, process, or piece of equipment as appropriate will be reviewed to identify any assumptions, bounding conditions, upset conditions, contingencies, margin to criticality, and NCS barriers.
Status: This evaluation was completed for the liquid wastes systems.
7
--.---_._____.__m_._.___m____._
d)
Analysis Upgrade: The nuclear criticality safety analysis will be updated ifrequired.
Status: An updated nuclear criticality safety evaluation was prepared for the liquid waste systems.
5 e)
ISA: The ISA team will use the above information during its assessment.
Status: The ISA team used the updated nuclear criticality safety.
evaluation during its assessment of the changes and operation of the modified liquid waste systems.
VI.
SUMMARY
l Progress to date on the CSPU plan was generally in accordance with the schedule submitted on September 20,1996 and updated on December 20, 1996. Significant accomplishments to date include generation and presentation of the plan, revision and submission of the ISA schedule, revision or writing of procedures-including the overall program document and the Criticality Analysis Procedure, updating conversion plant drawings, conducting training, and revision of Chapter 4 of SNM-33.
Criticality safety staffing has been augmented by the addition of a full-time criticality safety professional based at Hematite since January.
l i
l.
\\
l L
l 8
k
~
4
.~~ ~ ~ ~
~
T w
e 1999 m ~ I
_ lp_jTask Name_.__ _ __ _
O3. 1 04 ( Q1 j O2 I Q3 l Q4 Q1 l O2 l Q3 I Q4 Q1 l O2 I Q3 l Q4 Q1 l O2 FO3]
1 cmmAun s4rm maAm ueoAn I
c i.
'~ -
Prnov % =Nac 3
$ 8/14
~ g-*
sube,w Rn+,io Nov ss 2o2 g gjg3
}
{~~5 ~~
S"b"w csPU pan and adwdh a NRC 9/20 f
l l
l 3
l l
l l
l l
l l
l 6
0"""rP''"*'*"***""C t
24
" = ' * * * * " -
^ Process 9/3b9/4 25~ '
"7***
i i
26 seiRe,..n-m' 915 10/25
'2I 10/28 k 11/20 Prmm&sakte
~
^"'""'""'"'"*8""""'"*"
28 1/6 ~ha...!.5130
[ 29 b*'a "ad "5**"*
6/2 [j 6/13 3b C-e mire oax-re c-ee M 1111 l12 -
~
'1 3
- T**'"
ms.
l12 l 8/12 32 12,N - ~ -
l 1/30 33
"'**' 'sA se.dh.nd 34 4 m nRC 9/23 5 10/18 i
.A 34 '
CosMhte wavten Ceecany SaWam (RAAP 9/23 11/15 l
.j 35 Crecamy Analyws Prawese (RAAPM) g773 p ggjj3
= m, Revene CommementCorvectme Acton Trackweg (5t j jjjp 'jjg
)
(~ 36 1
w e e)1/27 3y -
AbnormW Evens / Occurrence reparsng,RAAP 105 12/30 0
+
~58~
NRC repanng prawdure (RAAPD) 1/28.8) 21 2
~~ ig- ~
Reced Refereon Proce&se (RAAP 107) y3 hg
~ 4{}
Documwe ewed prmese (RAAP 1 H) 373 g jg i
k
- m
S6 1997 1998 1999 2000 03 l 04 Q1 l O2 l O3 l 04 Q1 l 02 l 03 l 04 Q1 l O2 l O3 i 04 Ot j O2,((
r, Task Name 10
- ww,,-. -iin 3,33g4,3
~T1
,r4 a r,,2,
_.._-.w,,,,
M,O b13
" 'i3~^
sawy.unee poeman. oocum.<= inAAP-i ts)
. 1 5)32[g,g if crw.no R.,-
=--Presse w 1
' is--
so
. w=>
s,3g7,8 "J6-Updde Em.tgmcy N GPfP m.*
i 7/9 j 8/5 b~j7~]
o c,w.no op.non.e Ncs Aiarm sv em 8/6 f,j 9/2 e
~Q R
ch.pio,4 et sNu 33 12/1852/5 i
~~ ig Sh chapw 4 smendmere to NRC 50 NRC em deper 4 mndrne
217
.._1.[/20 51 NRC******""""*
$ 3/21 52 D** **'n or sw 33 muere iAsx, 53
- "**^
\\
\\
~
upo re nomos, wi2i>
12 M 11/1 54
$f sup.,mor tcom r.
l l
l l
u 60
?
l
{
j l
[
[
j j
l
[
^ ~ ~ ~ ~
S.n A.
pro l
75 p
~
I 76
" e F*'**"e (RAAP 1 12 'M 10/25:
i t
CamCAUTY ANALYSIS UPDATE 77 l
i COWERSION 78 79 P**
M 80 P&O 19 M 10/25 u..._.
81 D'*"*
10/28 h 1/6 !
'~ U 1/715 /20 8
8a"*^^""*
1 l
s
l j
\\l 3
Q l
2 QL 1
Q 4
Q l
3 Q
l 2
Q i
1 Q
0 1
3
/0 4
1 Q
v
~-
]
I 0
3 1
/
Q 7
J 3
l l/
1 2
3 7
O
/4 fI 1
0 1
3 6
/
3 1
4
- I 1
/
1 Q
2 i
13b2 y
t 5 2
/
1 1
4 1
Q l
3 7
Q 7
}7,'j 9
/
1 8 s 8
2
]
/
/
7 2
j ['s 4
Q l
hd,
fl I
l?
4 1
Q 52i vy 1
2 7
j 4
g 0
l 3
Q ow e
Y r
w R
o R
- M r
5 8
n T
T
,a
=
W_
C
)
E a
x o
a e
n t
M C
- 5 P
n e
E G -
E ma T
L e
"a C
v s
A E
c Y
P' e
E
^
R u
O m-C a.
E e
T N _.
R r
S k_
s.
a..
T-
]5<
l
.}
!+
2 8 9 0 1
2 3 4 5
. D 4
6
_7 8 8 8 3 8 8 9
'9
'9
~9 9
I 1
~
i ll l
(
I l
lll,.
l llllllllt
96 1997 ID Task Name Q3 l Q4 Q1 l 02 l 03 l Q4 l
j CRITK;AUTY SAFETY PROGRAM UPDATE 2
Ad'"iai$"iv* *A*aAaa""'S
^
~
l 4
~ dubmit Reply to'NOV 98-202 9/13 5
ehmd dSPU}Asn and sdo NRd 9/20 Ou*'Ierly Progress Reports to NRC 6
l 23 connguration controi l
24 Revise Change Managernent Process 25 Form Tea n gj3 llg74
^ '
~
10/28 h11/20 27 Proceduralue 28 Automate change management proces*
1/6 M 29 Tn *"d EP"""'
~
odpl30 6/2 h 6/13
~~
~
30 centraiue owument conni 12 11/1
~
~
~~ ~~ ~
31 surmaiance Testi 12 l 8/12
~
~
PMS 32 12 i y
~
33 Reme ISA whedule and submit to NRC 9/23 5 10/18 34 compicte wrnten erscainy Safety Program (RAAP l
35 Cntcaldy Analysis Procedure (RAAPdO8) ' '
9/23 PW)11/15 9/2b 12/13 3
ggjgf gjg 36 Reme Commdment/ Corrective Action Tracking (R, uh Ab'*' mal EvenUOccurr'nce reporting (RAAP 105 12/30 h1/27 37 e
1/28 hj /j2 38 NRC reporting procedure (RAAP-104) 2 2/13 6 S28 39 Record Retenbon Procedure (RAAP 107) g73 (i3jjg 40 owument conul procedure (RAAPSM1)
l 02 l Q3 l Q4 Q1 l Q2 l Q3 FQ4 Q1 l Q2 l Q3 I
I I
I I
I I
l-1 I
I A
hm l
=:
0 70 '-l&9 07 Cr0 - /
96 1997 ID Task Name Q3 l Q4 Q1 O2 l Q3 l Q4 41 ucem ctange procedn (RAAP-112) gj1g gjg 42 Sai'IIIeihiUEm~ents proceduie (RAAPd1E 4/9 f/29 43 S'afey related he re document (RAAP 116) 4/ 0 h;5/13
~
12 h6/6 44 0'garhaton and Resporssbilities Procedure (AD-5/
45 51p5 d d he d e RA PU M) gjg 77g 46 UtiEm$rgekEnlEMP ma$a' 7/9 8/5 l
47 AandM'a' ion INES Ala'm Sntem-8/6b9/2
~
48 R5Atiapter iof SSUU 49 SubmitWpter imme~nds~niiEURC 12/18 $2/5
~ ~
50 NRU rww &apteiiamMmini 2/7 1 3/20 51 NRC apprwe 5pteri$en&nent 3/21
~
1 52
' D'i'I' Pa'sii f SNf533 (5ELUTE T SK)
~
53 T'*6a'ao I
54 Updaie TraInbghogra[niRA PU21)' ~ ~
~
12 11/1 55 Uaa*9'"mnt SJpaiMEkM ~
l l
75 Self Assesstnent Prograni l
76 E'ina' aud'iSA"5 Pact'ons procedureiReAP-1 g gjg 77 CRmCAUTY ANALYSIS UPb T5
{
l 78 CONVERSION l
79 Plant Configuration 80 PalD
'310/25 19
l 102Yo3 1 04 a1 1 02 l 03 1 04 01 l 02 l 03 ca1 ANSTEC APERTURE I
I
): CARD Available on Aperture Card 970 y09o290 - Z
96 1997 l ID Task Name W~ O1 83
- a*
1/21,
)2/24 2/25 k]p/28 Evaluatxm 84 4/j9
-6/9
~
_ _ _ _ _ RECYCLE / RECOVERY 86 l
l PalD g
y 88 Evaluabon 91
~
TEdEf PUUIRUU END~ ~ ~ ~ ~
94 I
e= -..
l l
1998 1999 2000 1 02 I 03 I o4 01 I o2 l 03 1 04 01 1 02 l 03
"""""""T a
h
] f/3
@Y ll7/10 7/13 f El 10/30 1
ANSTEC APERTURE CARD
^Ipe^rffrS*Elrl" 9704090790-3
-