Special Rept:On 860115,only One Containment Area high-range Radiation Monitoring Channel Operable in Mode 3.Caused by Voltage Test Failure of Mineral Insulated Cable.Cables Removed & Reworked & Alternate Procedures Devised
ML20137P620
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/24/1986
From: Romberg W
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
MP-8655, NUDOCS 8602050277
Download: ML20137P620 (1)


Text

r-NORTHEAST tml.mES P o Box 270 HARTFoHo, CONNECTICUT 06101

[.YC.Um [ I Uw.s.

w...w.m. + aw (703) 666-6911 L L J , . ' ' T ' *:l:

January 24, 1986 MP-8655 Dr. Thomas Murley U. S. Nuclear Regulatory Commission Regional Administrator Region 1 631 Park Avenue King of Prussia, PA 19406

Reference:

Facility Operating License No. NPF-44, Docket No. 50-423

Dear Dr. Murley:

Containment Area High Range Radiation Monitors This Special Report is being submitted within fourteen days pursuant to Plant Technical Specifications 3. 3. 3.6.C and 6.9.2. Plant Technical Specification 3.3.3.6.C requires that a Special Report be submitted to the NRC if less than the two required operable channels for containment area high range radiation monitoring are operable during Mode 3.

The plant entered Mode 3 with one channel for containment area high range radiation monitoring operable on January 15, 1986. Portions of the mineral insulated cables for the system failed the voltage withstand test required by the manufacturer's preoperational testing procedure. The defective cables were removed and returned to the supplier for rework. One detector was relocated to make use of an acceptable shorter length cable. This provided one operable channel (Train A) for containment area high range radiation monitoring. Plant procedures were revised to provide an alternate method of monitoring using the purge area radiation monitors or, if offscale (greater than 10 5R), a grab sample using the Post Accident Sampling System.

As corrective action, an additional complete channel has been purchased from a different vendor. All work activities related to the new design within t.he Containment Building have been completed. The second channel will be completed by April 30,1986.

The Licensee contact for this Special Report is Associate Engineer Thomas Cleary who may be reached at (203) 444-5571.

Yours truly, 0602050277 060tg4 NORTilEAST NUCLEAR ENERGY COMPANY PDP ADOCK ODOOO4P3 G PDR bO , J ,

Wayne D. Romtwrg Station Superintendent Millstone Nuclear Power Station WDR/TC: pdm