Responds to Encl 851220 Request for Addl Info Re Drinking Water Permit Application for Surface Source.Bound Copies of Specs & Drawings of Gravity Filter & Reactivator Encl.W/O Specs
ML20137P508
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 01/27/1986
From: Fields J, Gordon D
F&M ASSOCIATES, INC., PENNSYLVANIA POWER & LIGHT CO.
To: Labuz J
PENNSYLVANIA, COMMONWEALTH OF
References
PLE-7980, NUDOCS 8602050153
Download: ML20137P508 (12)


Text

Sb-%7 wh PPaL Pennsylvania Power & Light Company Two North Ninth Street

  • Allentown, PA 18101 + 2151770L5151 j

January 27, 1986 Mr. James P. LaBuz Sanitary Engineer Bureau of Community Environmental Control Pennsylvania Department of Environmental Resources 90 East Union Street, Second Floor Wilkes-Barre, PA 18701-3296 SUSQUEHANNA STEAM ELECTRIC STATION DRINKING WATER PERMIT APPLICATION PWS 4085504 -

RESPONSE TO PA. DER COMMENTS CCN 741326 FILE 012-3 PLE-7980

Dear Mr. LaBuz:

This letter is in response to your preliminary comments on the Susquehanna SES drinking water permit at, plication for surface source, EPA ID number 2400998.

In your letter dated December 20,1985, (Attachment 1) you indicated that there were eleven (11) items which needed further clarification. We vill address each item individually as follows:

1.

Enclosed please find a coversheet for each set of drawings reviewed by the Professional Engineer (PE). The coversheet is signed and sealed by the PE and binders are provided to attach each set of drawings together.

Enclosed are two bound copies of the specifications. The fly leaf of each specification has been signed and sealed by the reviewing PE.

These bound specifications will replace the unbound copies originally submitted with the permit application.

2.

Enclosed please find two (2) clear copies of sheet T-21257-B entitled

" Internal Assembly Reactivator with Clearwell."

3.

Drawing numbers 18149-D and 18543-C enclosed with this letter are the most detailed drawings we have of the gravity filters. This is proprietary information and Ecodyne Corporation, Graver Water Division did not supply us with more detailed prints. The following narration and attached sketches should provide much of the information required.

The Raw Water Treatment Subsystem is designed to treat river water to a quality suitable for plant usage within the normal range of raw river water quality barring extreme conditions.

c' h,PDR 07 S3 k\\

86020' CW PDR P

ptE-7980 January 27, 1986 2

CCN 741326 FILE 012-3 Two mono-valve gravity filters are used to filter the clarified water leaving the reactivator before it enters the clearwell storage area.

Each filter unit is a cylindrical carbon steel vessel, approximately ten feet in. diameter and houses a backwash storage compartment, filter section, and strainers as shown in Attachment 2.

Each filter consists of a bed of anthracite, 18" deep, on top of a 6" deep bed of sand. Currently it would be very difficult to add an additional 3" of anthracite filter media.

In the past these filters have consistently produced water of acceptable turbidity. Below are listed a number of parameters describing the filters.

Mono-valve Gravity Filters o

Number 2

o Height 15'9" o

Diameter 10'0" o

Filter Bed Material Anthracite 1

o Filter Bed Volume 118 ft' o

Filter Bed Depth 18" o

Supporting Bed Material Sand o

Supporting Bed Depth 6"

o Supporting Bed Volume 40 ft o

Flowrate (Clarified Water) 300 gpm o

Flowrate (Backwash) 943 gpm j

l o

Backwash Duration 5 min.

i l

o Construction Material Carbon Steel The gravity filters have been designed to automatically backwash them-selves with internally-stored water. After the backwash cycle, the backwash water storage compartment refills and the filter returns to service automatically.

The backwash controls for both gravity filters are identical and consist of an internal timer adjustable from 0-60 hours, a backwash timer adjust-able from 0-15 ninutes, a manual start pushbutton, a dif ferential pressure switch, and a level switch interlock.

1 i

l t

PLE-7980 January 27, 1986 3

CCN 741326 FILE 012-3 The level switch interlock prevents simultaneous backflushing of both filters.

In order for either filter to undergo a backflush cycle, the other filter must have a water level equal to that of its outlet weir, as sensed by a level switch. If at least one filter does not have the proper level, the other filter backwash cycle cannot be initiated by any control method.

The backflush cycle may be initiated by a filter differential pressure of 6.5 psid, the interval timer, or manually with a pushbutton on the control panel. Either the differential pressure switch or interval timer will automatically initiate backflush and energize the backflush timer. When the backflush timer energizes, the filter backflush solenoid valve opens, allowing the filter to backflush itself as shown in Attachment 3.

After the preset time of the backflush timer has elapsed, the backflush solenoid valve closes, the backwash water compartment refills, and filtered water once again passes through the outlet weir.

Each filter has a backflush counter on the control panel that registers the number of backwash cycles for the respective filter.

4.

Turbidity analysis is performed continuously at three locations in the water treatment system: reactivator inlet, reactivator outlet, and gravity tilter outlet. The output of each turbidity sensing device is used for a pen recorder indicator and a high turbidity alarm function on the water treatment control panel located in the, water treatment building.

These turbidity measurements are used by an operator for process control and to evaluate the performance of the reactivator and gravity filters. A pH neter mounted on the reactivator outlet performs continuous analysis of reactivator outflow. The pH instrument has a high/ low alarm set at pH 6 and pH 8 on the treatment plant control panel.

The piping and instrument drawing for the water treatment system (drawing number E 106222-1), provided as part of the original application package, indicates the location of the turbidity (Tb) and pH (pH) meters on the six-inch inlet and outlet line from the reactivator and on the outlet header from the gravity filters.

5.

A.

Water for the treatment plant is supplied by the river water makeup pumps. Normal operation is to have three of the four make-up pumps I

running continuously. During the infrequent occasion when both Unit I and Unit 2 are shutdown simultaneously, at least one make-up pump is kept in operation to provide continuous flow of water to several different in-plant systems including the raw water treatment system.

The flow of raw river water to the reactivator is controlled by a four-inch flow modulating valve operated by a level controller mounted in the clearvell (Spec. M-31 Section 5.2.2).

The opening of this valve is limited to prevent exceeding the maximum design flowrate of the reactivator. The level controller in the clearvell opens and closes the modulating valve slowly to prevent sludge carryover, i

1 PLE-7980 January 27, 1986 4

CCN 741326 FILE 012-3 4

)

B.

All treatment chemicals are metered in proportion to flow. The reactivator was designed with sufficient capacity to handle normal i

fluctuations in river water turbidity. Any high turbidity out of the clarifier is annunciated on the treatment system control panel and requires operator attention.

6.

There is a variable speed impeller pump which positively mixes raw water, treatment chemicals, and previously-formed precipitates in the draf t tube or primary mixing zone and recirculates this mixture through the secondary flocculation zone located beneath the hood suspended in the reactivator.

(Attachment 4 and 5).

The recirculation system is designed to recirculate three to five times the design output flow. Detention time within this hooded section is approximately 30 minutes at the design maximum flow of 300 GPM.

7.

The reactivator is a positive, internal recirculation, upflow unit of the high-rate solids contact type. A cut-away view of the reactivator is i

shown in Attachment 4.

Water to be treated enters the central uptake draft tube where it is mixed with chemicals, previously formed precipitates and recirculated sludge. The recirculating flow path is shown in Attachment 5.

The recirculation impeller / agitator mixes the chemicals, water, and precipitates thoroughly while imparting an upward flow in the draft tube. The mixture then passes out of the top of the draf t tube into the slow mixing zone where maximum chemical contact is achieved.

From this zone, the water and precipitates may re-enter the draft tube at the bottom for further mixing and treatment, or may enter the quiescent separation zone.

8.

A sample of finished water from the Service and Administration Building (S&A) has been collected. Results of this analysis are given below.

Chloroform 8.7 ug/L (PPB) l Dichlorobromomethane 1.7 ug/L (PPB)

Dibromochloromethane None Detected Bromoform None Detected Total Triholomethanes 10.4 ug/L (PPB) or 0.01 Mg/L (PPM) 9.

The unit is equipped with a two-inch automatic sludge blowdown line.

Upon initiation from the reactivator inlet flow monitor this line is automatically backflushed and opened to allow sludge to flow to the waste treatment facility. A three-inch manual drain is provided in the reacti-vator which could allow removal of sludge in the event of a blockage in I

the two-inch center drain. This arrangement is consistent with information given in drawing M-117, Sh. 1 and Section 6.1.1 of the i

specifications. The two-inch automatic blowdown replaces the flush jet l

system and manual quick opening center sludge blowdown deleted from Section 6.1.1 of the specifications, i

i i

i

PLE-7980 January 27, 1986 5

CCN 741326 FILE 012-3

10. The brief descriptive forms for the wells surrounding the Susquehanna SES were submitted to Walter Gilbert of Pa. DER.
11. Presently, there is no physical connection between the wells at the site and the surface water treatment / distribution system. This tie-in was removed at the end of construction activity in 1983. A modification has been proposed to install permanent piping which would tie-in well water to the surface water system. PP&L will complete the appropriate well application modules before such a modification is undertaken.

If you have any questions or comments on the information submitted in this letter or on our drinking water applications please contact Curt Saxton at (215) 770-7891 or me at (215) 770-7889.

Respectfully Submitted, A&j rome S. Fields Senior Environmental Scientist-Nuclear ATWh 4Wnie "46I)A

[frf _ 'CRTY:t'&

~~

Seek [

b, Review by

-s s C.

,s

...ZN 1$

5 l

k.a.;:- l,}

L A

.ra

..s, Dou as H. Gordon, F&M Associates, Inc.

NE P ar #N !

1132 Hamilton St., Allentown, PA 18101 JSF/smi chsmea004516a Attachments Ms". E.- Adansaa! k 'IRC D

~

ec:

-a a n....

e m

-+

ATTACHMENT - 1 m-m y s; )

g-

~ AN 061P96 MUC12AR DEM t

COMMONWEALTH OF PENNSYLVANIA N uYCo ubhv5NbMM 90 East Union Street - 2nd Floor Wilkes-Barre, Pennsylvania 18701 (717) 826-2525 December 20, 1985 P. P. & L.

c/o Mr. Jerome S. Fields Senior Environmental Scientist - Nuclear Two North 9th Street Allentown, PA 18101 RE: Public Water Supply 4085504 Susquehanna Stream Electric Station P. P. & L.

Salem Township, Luzerne County

Dear Mr. Fields,

l l

The permit application is in the process of review and the following items require additional clarification or information:

1.

The plans and specifications shall be prepared by or under the super-l vision of a professional engineer registered to practice in Pennsylvania. The plans must either be bound and the front cover or flyleaf signed and seated by the P.E. taking responsioility for the design or else each plan sheet submitted for consideration must be signed and sealed by the professional engineer.

2.

Please provide two legible copies of sheet T-21257-8 entitled " Internal l

Assembly Reactivator with Clearwell".

3.

Please provide a detail sheet of the gravity filtc s.

The drawings should show at a minimum the location of underdrahs and the supporting gravel bed depicting appropriate layers and depth.

It should also show the depth of sand and anthracite in the filters. The wash water troughs, auxiliary surface wash, rate of flow controllers and all meter valves, head loss gauge and sample taps should be shown on this fil detail. Our design manual recomends 21 inches of anthracite.

Is possible to add the additional 3 inches ei would it be washed away during the backwash cycle?,

4.

Indicate the location of all turbidity and pH meters.

Raw water tur-bidity and pH meters should be provided so that adjustments in pre-treatment chemicals can be made. Turbidity meters should be provided after each filter. You should consider a turbidity meter on the influent to the filters from the clarifier reactivator. A pH meter after the clarifier reactor would be desirable as it would directly measure the effectiveness of the pre-treatment chemical feed.

f NI~

.h*

Y,; P'.- A L

  • Decemb:r 20, 1985 5.

Two nadyt concerns with solids contact clarifiers are their instability duris$ rapid flow changes and turbidity fluctuations:

MAC The?$lowsheetindicatesthatwatertothetreatmentplantiswater a.

that comes from what is referred to as " makeup pumps discharge".

Provide documentation that the flow rate is relatively constant and will not cause the sludge blanket to rise out of the settling zone onto the overflow weirs and then onto the filters.

In addition, there are frequent occasions where Unit 1, Unit 2 or both are shut down for repairs or refueling. During these occasions where there is no demand for cooling water,.I assume the river intake pumps shut down.

How is water then supplied to the raw water treatment system?

b.

I assume the raw water turbidity flucuates significantly. A raw water turbidity meter could be int.egrated with the chem feed pumps to provide adequate feed or pre-treatment chemicals when the tur-bidity rapidly increases.

6.

Is the detention time in the mixing and flocculation zone greater than 30 minutes?

This excludes the detention time in the coagulation zone.

7.

I was unable to determine how the sludge was recirculated in the solids contact clarifier from Drawing M-ll7 SH 1.

Perhaps it will be obvious when you provide Drawing T-212578.

If not, please provide an explaina-tion.

~

8.

Please sample for THM's in the finished water from a potable tap supplied by this filtration plant (Administration Building or Radwaste Building).

9.

Our manual requires that the sludge pipe in the bottom of the_ clarifier b.s a n.o_t less than 3 inches in order to facilitate cleaning.

f The specifi-cations indicate in secuan 6.1.11 that the drain will be 3 inches.

plan sheet and modules, on the other hand, indicate that the drain is 2 The inches.

I In the modules, you indicate that a manual drain, 3 inches in diameter, is provided in case the automatic 2 inch line plugs up.

6.1.1 of the specifications shows that the manual quick opening center Yet sludge blowdown has been deleted. Please clarify.

3avenotreceivedtheshortdescriptiveformforthewells

10. To that-be submitted under separate cover, 11.

I ha yet decided how to handle the wells at this facility.

their intermixing with the piping system from the domestic water sto If tank is a rare event i mits" when the well Is n.e. once per year we can issue " emergency perrage eeded.

must be considered as a permitted supply.If it must be used more frequently, it I

hour pump test, detailed sampling and a permit application.This would necessitate a have to permit the surface water supply, I must similiarly permit the Since I wells to meet our same construction standards.In this case, submittal of a BDF would not be adequate.

If however, the well would only service 1

a small number of isolated buildings not interconnected with water from the domestic water storage tank, a 80F is adequate.

1 L

~ ',, '

f t

P. P. & L. December 20, 1985 f

3 My present concern is the cross connection that exists between the well system

'1 and the domestic' water system which is being permitted by this application.

Sheet M 117 SH2 shows the interconnection after the chlorine contact tank.

There must be a physical disconnect between both sources with a connection only being allowed by " emergency permit", or the well source must be permitted.

Please respond to the above items as soon as possible so that processing of the permit application may continue. At some point it will be necessary to physi-cally inspect the water treatment plant before the permit can be issued.

In addition, we would want to collect finished water samples to submit tr our lab.

e If you have any questions on the above, do not hesitate to contact me.

Very truly yours, J

PES P. LABUZ Sanitary Engineer JPL:kab cc: File Chron.

W. Gilbert F. & M. Associates Regional Sanitarian Manager t

l g

w l

l l

l l

i l

ATTACHMENT - 2_

4 M

l p

pm FLCf SPLITTING tcI se g

--y I

4 i

L tt 1

e VENT List INtET Flos VE T REACitfATOR i

FILTIR e INLif I

I Lff!L SWITCM A

WL 84TER FILTER DUTLif (gygt WTLif ggte f

I LACISASN taitt STORAGE COBPARTM NT

.7 f

=

s_t__J__a h

M A

G,,.. l. %

^

,t,, ; s,:.. j.....; -

i

, ~.".' ; -

', sam

, sisain n f

.,.,:, ;., f,,..

,, -,-a

.c 2. +

m 0

v L

U.

-w o -

l'h%

>@.ef/

-e"

ash x

C rikoi.

  • 6's N 0444N VALT(

GAAflTT FILTER i

e h

l t

9 ATTACHMENT -3 l-l

-c G, E=

=

.J A

b

.i 3

e i

i J

i'.

i.s, e

F 6-

=,

R r'

==

r3 r-- 3 *".

s=

2

'1

['-

tu

-n-r7 I

i

=:

1J 1;U-3 h

bJ.,, i, C,

k f

o g

t n

r

=G li

, > n g l,-

II 1

W e@

d

C EIE

'l if t

3 ii

=. :

={

z p' y[.W. j 9.;E g

.g i

i U

l J\\

[

2 itsM m

,i

=

5 r'

..__h n=

g i re

==

22 I.

t;

'.,:/

d I

g rw l

i

=, :

---4 f.', I)1 E.

I 8

Ird i

i I

j.

i l

2 \\.

't.s,,

f j

=

.e.

Y 5

_', I ===

s

=

n 4, _

\\r-C

.L E

Lt 'J r ',

,'. )

J Ji L

j.]--,

,1

-([~

BS S =

J

~

ATTACHMENT - 4 1

H M k r="***

i A

@ W xh i

r e K p. r

- 1 M-i cx g

w o

ga u

2

,J -

d (m V

p rs J

L,

/

G)sag Jg p[

$hT 1W/'

l w

j A __

18 N p) l

_1 l

, WAkwy one massaa.

3.

ILUBSE ttE4PER H lVE SuAFT IS. 9EAFT TUR 2 FLOW camTROL ItIULATM l.

IBPELLER II. IBAff VWE EITi mle 3.

TREATit satts NTLIT

13. ILuME staAPER StiVE WIT
17. Stem Pagag 4.

INLIT FLN CM,5ALVE II. VaalASLE SPEIS IBPtLLIB HIVt II. St ast plagIFF M LVE

  1. '~-

I 5.

INLif

12. NSW
13. BntaFL5BR MLVE I.

CNEBICAL AGRITIEE LHag-13.

IEPILLIS BelVE SueFT

20. SasPLI LIE S
21. M ICE CE LICTW W 7.

3LUBet 3CRArtt

14. YS T!I IstAttBS
22. SUPPORT M itet SIBIPLiflED DI AGR&al 0F REACTIVATOft v.-

AT'IACHMENT - 5_

l

.=

=

I E.

a

=

-s

=

=

=.

=

=

=

=

=

==

=

g

=

.= =.

_z_

E o

a 1

E

. 5... 74'.,..-v i

., - e:.

.y

~

Q:..f. '-Q'.1y,-

.' 1. '.......

s 5

1

?E

... -:.c.,......w.

=

s.

.. o, u=

-=

o

./ --

a c

=

.. :a p. e p

.- N g

e=

.. ps v:-

'.0

-q

=

.d u.%.2....i..,%'i..@'.

_r

..S..

5 o

N 14 a

~

s

'M::T#n a

5_5 s

u

z. - /

= = st h

n' i.d.hh

{:k,*..

OE=

/$. -[.... c..

,.n

.iJ

  1. 4 *.-

l w

g..%y

. W,f; 35'M *.

  • N..

s

~

.' v.. -::..

t7

[

5. :::.4.:: e p.; y. +. p.t d 'm'-

l'A

=

m.; gf

.m my.

w x

'. ~

=

L

--:=================-4

%%3

~ ' ^

a

' l Q(.i.,. ?;.9..'.:,,.r,S u,... c,*. -.

...:.,........ v b..'~s.

(~-

..... l At., ?

a f..(.

w g.e 3-

.:.. e.:sp,,..

.,./ *..7 s=

f

~ '. ;-

t sit 07 t* % '. S*

t,n.$:

A5 A

g

-: 1 "f.

y

/

?.AbCS *..'

I.

/

. :: i.?:

r,*. >.p;,0; L:

=

we

=

a

yyq
c.w

~

' ?4r..~f MN,,..

[

Y.

o 1 r,

,r.,: ?,.c

,.,g W

o

" %.2.:t..

t t;;i w..~;;; *.,- l

'8 r

aa o

5

    • , '.,,s:

o

3

- '::;, :f.c. -

=

a

...,..~....34 22

......,...r :..

., ;y

........ 7.. f,'. :g,e

-.a

.*V.,s j

s'..g.g I

l'

a

-=

=.. _

g E:

E!I

--~

==

2s

- - _ _ _ _