[D.O i
i-AE0D/E510 July 30, 1985 MEMORANDUM FOR:
Karl V. Seyfrit, Chief Reactor Operations Analysis Branch Office for Analysis and Evaluation of Operational Data THRU:
Matthew Chiramal, Section Chief Engineering Section Reactor Operations Analysis Branch Office for Analysis and Evaluation of Operational Data FROM:
Frank Ashe, Engineer Engineering Section Reactor Operations Analysis Branch Office for Analysis and Evaluation of Operational Data
SUBJECT:
DISAC.ING 0F A SHARED DIESEL GENERATOR SET DUE TO ELECTRICAL POWER SUPPLY ARRANGEMENT FOR SUPPORT AUXILIARIES The enclosed Engineering Evaluation report is forwarded for your review and consideration. This report provides information concerning power supply arrangements for support auxiliaries associated with shared diesel generator sets.
The report identifies a situation which was discovered at the Surry Station whereby electrical power necessary for operation of engine louvers associated with the swing diesel generator set would not be available.
For this situa-tion, the engine would overheat and thus may be unable to perform its safety function. To assist in making an assessment of its generic implications, five additional facilities were reviewed to determine if this or a similar concern might be applicable to these facilities.
Based on the results of the review conducted for the five additional facil-ities and the knowledge that certain support auxiliaries must be supplied with electrical power for proper. operation of a diesel generator set, we believe that the concern identified for the Surry Station would not be a concern at most facilities which use shared diesel generator sets. However, this or a similar concern may exist for a shared diesel generator set at a few stations, and in view of this possibility, the report suggests that it would be 8509190111 850730 PDR HISC 8509190111 PDR
L.
Karl V. Seyfrit appropriate to discuss the event described in the Surry Station LER in Section 2.0 (Excerpts of Selected Licensee Event Reports) of a future issue of Power Reactor Events.
b'tt<1. bl k %
Frank Ashe, Engineer Engineering Section Reactor Operations Analysis Branch Office for Analysis and Evaluation of Operational Data
Enclosure:
As stated cc: J. Crooks, AE0D M. Srinivasan, NRR Distribution PDR' AE0D CF ROAB CF ROAB SF FAshe MChiramal KSeyfrit TIppolito CHeltemes ROAB F. A.
SC:ROABbw C:ROABbg DD:A g FAshe:jz MChiramal KSeyfrit TIppelito 07/a4-/85 07/g/85 07/4/85 07/g/85 L