. _ _ _ _ _
.a
$V.,
4
'Af ouquesneuset
==
gf Nuclear Construction Division y,,, cop, g
N,' g"[p'j*,'f2$'
January 10 1986 United States Nuclear Regulatory Conmission Region I 631 Park Avenue King of Prussia, PA 19406 ATTENTION:
Dr. Thanas E. Murley Administrator
SUBJECT:
Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 Significant Deficiency Report No. 85-07, Final Report "Danage to BBC K-Line Circuit Breakers" Gentlenen:
This report provides infonnation as required by 10CFR50.55(e) with respect to the Novenber 22, 1985, telephone report of a potential significant deficiency.
Duquesne Light Coupany anticipates no f ur ther reports wi th respect to this issue.
DUQUESNE LIG T COMPANY By Carey '
J J. J3 Vice President SDH/wj s At t achnent cc:
Mr. P. Tan, Project Manager (w/a)
Mr. J. M. Taylor, Director (3) (w/a)
Mr. G. Walton, NRC Resident Inspector (w/a)
INPO Records Center (w/a)
NRC Docunent Control Desk (w/a)
SUB RIBED AND SWQRN TO BEFORE ME THIS DAY OF
/'ff u m, e __, 1986.
4ck t cau)
_c h-Notary PuDlic ANITA ELAlf;: CDTca, ;;37/'RY PU3UC R09fNSON TC'/,'NSH!P, ;.LLEGHP.Y COUNTY fdY CCf/f. W OT; D J q 3 g ;; 37 7 q ! 2g I )
203G253 960339 s
^DOW 05000412 o
PDR.
g
United States Nuclear Regulatory Cc..unission Dr. Thonas E. Murley Significant Deficiency Report No. 85-07, Final f.eport Page 2 COMMONWEALTH OF PENNSYLVANIA )
1*)
COUNTY OF'
//,[6 _, before me, a On this
/dd day of
/ZJoe ttf_
Notary Public in and for said (fynmonwealth and County, personally appeared J. J. Carey, who being duly sworn, deposed and said that (1) he is Vice file President of Duquesne Light, (2) he is duly authorized to execute and the foregoing Submittal on behalf of said Conpany, and (3) the statenents set forth in the Sutxnittal are true and correct to the best of his knowledge.
L M
[
G Notary Public ANiiA Et.A!Nr pg;;gg, pg;gegf pgggg ROGlfl5CN TO^.'.N5h;P, ALLECH N COUNTY MY covMiiSION EMIRES OCTCBER 20,1986 1
F BEAVER VALLEY POWER STATION - UNIT 2 DUQUESNE LIGli COMPANY Significant Deficiency Report 85-07 "Danage to BBC K-Line Circuit Breakers" 1.
SUMMARY
Tne control wire insulation on the auxiliary switch on K-1600 and K-2000, as well as K-225, K-600, and K-800 circuit breakers, may be cut or dan-aged by the top edge of the circuit breaker dust shield when the breaker is racked out to the full disconnect position with the conpartuent door closed. This infonnation was identified by a Part 21 report sthmitted to the NRC by Brown Boveri Conpany (BBC) dated March 19, 1985.
It was brought to Duquesne Light Conpany's (DLC) BVPS-2's attention by the NRC Sr. Resident Inspector in Inspection 85-19, Unresolved Iten 85-19-01.
Ef forts are underway to inspect and repair, if necessary, these circuit breakers.
2.
IMMEDIATE ACTION TAKEN On November 22, 1985, Mr. R. J. Wallauer, DLC, Regul atory Af f airs Depart-ment, notified Mr. D. Johnson, NRC Region I Of fice, by telephone that DLC considered this matter to be potentially reportable under 10CFR50.55(e).
3.
DESCRIPTION OF THE DEFICIENCY Tne control wire insulation on the auxiliary switch on K-1600 and K-2000 BBC K-Line CRT breakers may be cut by the top edge of the dust shield when the breaker is racked out to the full disconnect position with the coapartment door closed.
Tne sane condition could occur on saalier size electrically operated K-800, K-600, and K-225 CRT breakers.
This concern was identified in a Part 21 report submitted by BBC dated March 19, 1985, to Mr.
R.
C.
DeYoung, Director, Of fice of I& E, NRC.
Certain of the subject BBC circuit breakers are used at BVPS-2 in both QA Category I and 11 applications.
4.
ANALYSIS OF SAFETY IMPLICATION Danage to the auxiliary switch wires could result in misoperation of the circuit breaker, depending upon the configuration.
No specific instances of serious insulation danage hate been identified to date.
However, if such a condition had gone undetected, it is conservatively assuned that it could have affected the safe operation of the plant.
5.
CORRECTIVE ACTION TO REME0Y DEFICIENCY Ef forts are currently underway to inspect and repair, if necessary, these circuit breakers.
Two corrective actions are in progress at BVPS-2 to resolve the subject problens wi th BBC K-Line circuit breakers.
If d anaged insulation is found on any of the K-Line breakers, heat-shrink insulation will be added to the control wiring to protect and further insulate the wiring.
For the ebject BBC K-Line circuit breakers, an adhesive backed gasket will be installed on the top edge of the dust
.j Significant Deficiency Report 85-07 "Danage to BBC K-Line Circuit Breakers" 2-shield thus rendering the dust shield unable to cause any daaage to control wire insulation.
These corrective actions are reconmended by BBC and are being impienented and tracked at BVPS-2 via Engineerinj Field Action Report EFAR-681.
6.
ADDITIONAL REPORTS This is the final report regarding the danage to the control wire insala.
tion of the subject BBC K-Line circuit breakers.
-