Requests NRC Response on Acceptability of Corrective Actions for 10CFR50,App R Deviations.Response Needed Before Drawing Issued or Work on App R Mods Performed
ML20137N363
Person / Time
Site: Sequoyah  
Issue date: 11/29/1985
From: Shell R
TENNESSEE VALLEY AUTHORITY
To: Adensam E
Office of Nuclear Reactor Regulation
References
NUDOCS 8512040109
Download: ML20137N363 (2)


Text

P,

~ *

,.4*,. y TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 37401

'5N 105B Lookout Place November 29, 1985 Director of Nuclear Reactor Regulation Attention: Ms. Ei"Adensam, Chief Licensing Branch No. 4 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555 g

Dear Ms. Adensam:

'In the Matter of

)

Docket Nos. 50-327 Tennessee Valley Authority

)

50-328

References:

1.

J. A. Domer's letter to you dated December 18, 1984 2.

J.'A. Domer's letter to you dated January 11, 1985 3.

J. A. Domer's letter to you dated March 4, 1985

~4.

J. A. Domer's letter to you dated August 5, 1985

-Deviations regarding Sequoyah's 10 CFR 50 Appendix R evaluation were submitted to NRC by references,1, 2, and 3..These deviations affect important positions taken in our Appendix R reevaluation.

Several deviations propose corrective actions which require modifications to be made to bring Sequoyah into strict compliance with Appendix R' requirements.

The design process is complete on these modifications.

However,.until NRC provides a formal response on the acceptability of these deviations, we do not plan to issue any of the drawings or perform any of the work' associated with t.he modifications.

Therefore, a schedule for completion of these modifications and for compliance with Appendix R'can not be finalized until the formal NRC response is received.

He are striving for " full and complete"-compliance with 10 CFR 50, Appendix R

~as soon as possible.

NRC's response would enable us to continue'this effort in a timely manner and would b.e greatly appreciated. As previously stated, the Appendix R modifications, except for any modifications associated with the Appendix R deviation requests,'will be complete by June 30, 1986.

i 1

'4~

B51EKb40109 8511GMP PDR ADOCK 05000327 t,.

)

i O An Equal Opportunity Employer m

r.-'

_c.

f. w >

a,

' Director of-Nuclear Reactor Regulation Novemba J9,1985 If you have any questions regarding this matter, please get in touch with-Jerry Wills at FTS 858-2683.

Very truly yours, TENNESSEE VALLEY AUTHORITY Yo R. H.-Shell u

Nuclear Engineer Sworn' ~

subscribed before me n

this.-

/

day ~ of $, 7A/r, 1985-K

' Notary Public

~

My Commission Expires

.cc :

'U.S. Nuclear Reg'ulatory Commission Region II

' Attn: Dr. J. Nelson Grace, Regional Administrator

-101_Marietta Street, NW, Suite 2900 Atlanta Georgia ~30323

.Mr. Carl Stahle Sequoyah Project Manager

-U~.S.. Nuclear Regulatory Commission

-7920_ Norfolk Avenue

'Bethesda,-Maryland 20814-p;

<..2