ML20137N048
| ML20137N048 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 01/15/1986 |
| From: | Foster D GEORGIA POWER CO. |
| To: | Walker R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| GN-776, NUDOCS 8601290138 | |
| Download: ML20137N048 (2) | |
Text
-
Georgia Power Company s v I
Post Office Box 282 Waynesboro. Georg.a 30830 Telephone 404 554 9961. Ext. 3360 404 724 8114. Ext 3360
'3 n.122 elz : 5S Georh>ia Power D. O. Foster Vce President and Protect
% out.wn e9ctrc s wm General Manager Vogtle Project January 15, 1986 United States Nuclear Regulatory Commission Region II File: X7BG10 Suite 2900 Log:
GN-776 101 Marietta Street, Northwest Atlanta, Georgia 30323
Reference:
50-424/85-16, 50-425/85-16 Attention: Roger D. Walker The Georgia Power Company wishes to submit the following supplemental information to our response GN-648, dated June 27, 1985, to your inspection report 50-424/85-16 and 50-425/85-16:
In our response to Violation 50-424, 425/85-16-01, " Inadequate Procedure for the Installation and Inspection of Cable Supports in Electrical Penetrations", Georgia Power Company committed to develop an area turnover procedure which would include provisions for verification of cable support moment loading limitations by engineering for each electrical penetration prior to area turnover.
The response indicated that these actions were expected to be completed by August 20, 1985.
The procedure was developed but, due to communications errors, specific provisions for the engineering verification were omitted.
The error was not detected until late December 1985, at which time immediate action was initiated to add the omitted provisions to the area turnover procedure. These corrective actions were completed on January 8, 1986.
The error has no impact on plant hardware as no area turnovers involving electrical penetrations have yet been completed.
This response contains no proprietary information and may be placed in the NRC Public Document Room.
Your truly,f
_ l D. O. Fost r REF/D0F/tdm 8601290138 860115_
PDR ADOCK 0500 4
o
.g go l i
e.,
Page Two i
xc:
U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C.
20555 R. J. Kelly J. A.. Bailey D. L. Kinnsch (BPC)
G. F. Head
- 0. Batum F. B. Marsh (BPC)
J. T. Beckham G. Bockhold C. S. McCall (OPC)
R. E. Conway C. E. Belflower J. L. Vota (W)
J. P. O'Reilly H. H. Gregory E. L. Blake, Jr.
3 R. H. Pinson E. D. Groover (Shaw, et. al.)
+
P. D. Rice L. T. Gucwa J. E. Joiner B. M. Guthrie C. W. Hayes (Troutman, et. al.)
D. E. Dutton G. A. McCarley D. C. Teper (GANE)
R. A. Thomas R. W. McManus L. Fowler (LEAF)
D. R. Altman W. T. Nickerson T. Johnson (ECPG)
NRC Sr. Resident D. S. Read L