ML20137M697

From kanterella
Jump to navigation Jump to search
Forwards Safety Evaluation Re GE Fracture Mechanics Analyses Submitted by Util on 840919 in Response to NUREG-0619 & Generic Ltr 81-11.Unit 1 Flow Controller Acceptable.Schedule for Replacement of Unit 2 Controller Requested
Date released: 05/30/2020 Download: ML20137M697


Safety Evaluation Disputing Results of GE Fracture Mechanics Analysis Re Low Flow Feedwater Controller Compliance w/NUREG-0619,as Amended by Generic Ltr 81-11
ML20137M714
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 01/21/1986
From:
Office of Nuclear Reactor Regulation
To:
References
RTR-NUREG-0619, RTR-NUREG-619
Download: ML20137M714 (6)
Safety Evaluation Supporting GE Fracture Mechanics Analysis Demonstrating Low Flow Feedwater Controller Compliance w/NUREG-0619,as Amended by Generic Ltr 81-11
ML20137M710
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 01/21/1986
From:
Office of Nuclear Reactor Regulation
To:
References
RTR-NUREG-0619, RTR-NUREG-619
Download: ML20137M710 (5)
Forwards Safety Evaluation Re GE Fracture Mechanics Analyses Submitted by Util on 840919 in Response to NUREG-0619 & Generic Ltr 81-11.Unit 1 Flow Controller Acceptable.Schedule for Replacement of Unit 2 Controller Requested
ML20137M694
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 01/21/1986
From: Rivenbark G
Office of Nuclear Reactor Regulation
To: BECKHAM J T
GEORGIA POWER CO.
References
RTR-NUREG-0619, RTR-NUREG-619
Download: ML20137M694 (2)