Forwards State of Il Schedule of Corrective Actions for Deficiencies Identified During Offsite Radiological Emergency Preparedness Exercise on 850423.Approval Under FEMA Rule 44CFR350 Remains in Effect
ML20137M615
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 09/10/1985
From: Krimm R
Federal Emergency Management Agency
To: Jordan E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 8509130285
Download: ML20137M615 (6)


Text

~

' he q Nh Federal Emergency Management Agency 1[

Washington, D.C. 20472 rmmy gana

]I5q_ik p:TED T_C U _a bN:-f-t, SEP l 0 i985 SN Fst[ [

MEMORANDUM FOR: Edward L. Jordan Director, Division of Emergency Preparedness and Engineering Response Office of Inspection and Enforcenent U.S. Nuclear Regulat ry Commission FROM:

'ri.

~

Assistant Associate Director Office of Natural and Technological Hazards Programs

SUBJECT:

Illinois Schedule of Corrective Actions for Deficiencies Identified During the Dresden Nuclear Power Plant Offsite Radiological Emergency Preparedness Exercise Conducted on April 23, 1985 Attached is the schedule of corrective actions submitted by the State of Illinois for the deficiencies noted in the Final Report for the Dresden Nuclear Power Plant Offsite Radiological Emergency Preparedness Exercise conducted on April 23, 1985. The exercise report was sent to you on August 6, 1985.

The Federal Emergency Management Agency (FEMA) Headquarters and Region V staff have reviewed the schedule of corrective actions submitted by the State and found it to be adequate. Based on the exercise and the corrective actions schedule, we cannot identify any impediments to protecting the health and safety of the public in the event of an incident at the Dresden Nuclear Power Plant. Therefore, the approval under FEMA Rule 44 CFR 350 will remain in effect.

If you have any questions, please contact Mr. Robert S. Wilkerson, Chief.

Technological Hazards Division at 646-2861.

Attachment As Stated 16Q-ld

@Z)7

/MP - 2+l y3qi cpp 8509130285 850910 hDR ADOCK 05000010 PDR 1

,g

.p c '~-

I

/9 g

$3,~

f/

5

~

lilinois Ernergency Services and Disaster Agency 110 East Adams Street, Springfield, Illinois 6270S August 8, 1985 Mr. Wallace Weaver Chief, Technological Hazards Branch Region V, Federal Emergency Management Agency 300 S. Wacker Drive Chicago, IL 60606

Dear Mr. Weaver:

This letter is in response to your letter of June 27, 1985 and the accompanying Report of the Dresden Nuclear Power Station exercise con-ducted on April 23, 1985.

Attached is our Proposed Corrective Action Response which indicates the schedule for correcting the deficiencies, as you requested in your letter.

Sincerely, bm Thomas F. 21mmernan Chief, Division of Planning and Analysis TFZ/1h Enclosure cc: Gordon Wenger

UTIt.ITY: Dresden Nuclear Power Stati:n Summary Usting of DeTRiencies

~

Illinois April'23, 1985 (State)

(Date)

Illinois B.

Other Deficiencies (Community)

NUREG Narrative Statement Corrective Action.

Scheduled Actual Item of Deficiency Proposed Date Date G,3.a.

The JPIC facility at the EOF is The State agrees with the inadequacy of the inadequate to function as a media present JPIC facility; however, criteria have information center.

not been provided as to what constitutes an adequate JPIC facility.

G 4.a.

Information released by the PIDs The State PI0s will attempt to coordinate the Next Exercise.

at the JPIC was sometimes information flow into more efficient segments.

[Qg,c,d, ge,y, Q incomplete, untimely and/or did not utilize prescripted formats.

G 4.b.

The State PIDs located at the The State PI0s will communicate with the Next Exercise.

JPIC did not coordinate State EOC more closely to assure County /

gg gg information in their briefings and State coordination, e

press releases with the County PIDs in the E0Cs.

l UTILITY:

Dr::sd:n Nuclear Power Station' Sumary Listing of Deficiencies Illinois April 23.1985.'

(State)

(Date)

! Grundy County B.

Other Deficiencies 1

(Comuni ty)

NUREG Narrative Statement Corrective Action Scheduled Actual item of Deficiency Proposed Date Date NONE 1

t 9

1 s

e

UTILITY: Dr sd:n Nuclear Power Station '

Summar711 sting eT Derictencies Illinois

April 23, 1985 '

(State)

(Date)

K;ndall County B.

Other Deficiencies (Community)

NUREG Narrative Statement Corrective Action Scheduled Actual Item of Deficiency Proposed Date Date A.I.e.

The EOC was not fully staffed by all The American Red Cross representative is designated agencies.

not considered to be a Kendall County EOC official, but is called in to coordinate the provision of ARC resources if needed.

Therefore, EOC staffing can be completed without the ARC representative being present.

A.4 The ability to maintain around the Additional training and direction with Prior to and clock operations was not demonstrated.

regards to responsibilities and obliga-during the next([Dats30dnal tions will be provided to Kendall County exercise.

o f ficials. A full shift change will be demonstrated during the next exercise.

F.1.

The NARS extension has not yet been The NARS extension in the Kendall County installed in the EOC.

EOC was installed on May 6, 1985.

DPESD2J G.4.a.

No media briefings were conducted at Media briefings will be conducted at the Next exercise, A

the Kendall County EOC.

Kendall County EOC during the next exer-cise.

h e

UTILITY:

Dresden Nuclear Power Staticn Summary 7Tsl.Ing of Deficiencies

- Illinois

_ April 23, 1985 2

(State)

(Date)

Will County R.

Other Deficiencies (Community)

NUREG Narrative Statement Corrective Action Scheduled Actual item of Deficiency Proposed Date Date 4.1.2.

The Plainfield EOC reported to The alternate for the County Regional of ficials at the alternate EOC Superintendent of Schools arrived at that the notification to report the alternate E0C at 0830, thus com-to the alternate E0C had been pleting the E0C staffing. IThe American completed to all EOC staf f at Red Cross representative is not con-0720.

The E0C was not fully sidered to be a Will County EOC official, staf fed until 0931 (a period of but is called in to coordinate the pro-two hours and 11 minutes).

vision of ARC resources if needed. There-fore, EOC staffing can be completed with-out the ARC representative being present.

A.4 The County did not completely Additional trianing and direction with Prior to and demonstrate the capability to regards to responsibilities and obliga-during the next (tktesuewh maintain staffing around the tions will be provided to Will County exercise.

clock.

officials.

A full shift chaage will be demonstrated during the next Dresden exercise.

b a