B16301, Application for Amend to License NPF-43,re TS Surveillance 4.7.1.2.1.b,requiring Testing of AFW Motor Driven & Turbine Driven Pumps on Recirculation Flow at Least Once Per 92 Days
| ML20137M448 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 03/31/1997 |
| From: | Brothers M NORTHEAST NUCLEAR ENERGY CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20137M454 | List: |
| References | |
| B16301, NUDOCS 9704080092 | |
| Download: ML20137M448 (6) | |
Text
_
. ~ - -
s l'
<Q;
[
g Hope Ferry Rd. (Route 156), Wau riord, CT 06385 l
N& hergy u,ii.too, Nocies, ro.cr siation
~
Northeast Nuclear Energy Company P.O. Ibs 128 Waterford,Cr 06385-0128 :
(860) 447-1791
- l Fax (860) 444 4277 The North < ast Utilities System -
]
Docket No. 50-423 l
B16301 i
i Re: 10CFR 50.90 N4R 3 I per U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 l
1 Millstone Nuclear Power Station Unit No. 3 Proposed Revision to Technical Specification Auxiliary Feedwater Pumo Surveillances (PTSCR 3-9-96) j l
Pursuant to 10CFR50.90, Northeast Nuclear Energy Company (NNECO) hereby j
proposes to amend Operating License NPF-49 by incorporating the attached nroposed changes into the Millstone Und No. 3 Technical Spedfication 3.7.1.2.
Description of Proposed Chances Technical Specification Surveillance 4.7.1.2.1.b requires the testing of the Auxiliary Feedwater motor driven and turbine driven pumps on recirculation flow at least once per 92 days. These proposed changes to the surveillance are to increase the required test parameter for the motor driven pumps from 1460 psid to 1468 psid, revise the current parameters for the motor and steam turbine pumps from differential pressure measured in psid to' total head measured in feet, mo I
4.0.5 and modify the Bases to the surveillance.
k Markup of Proposed Chances 7
A _ copy of the marked up Technical Specification pages are contained in Attachment 2.
The markup reflects the currently issued revision of the Technical Specifications.
Pending Technical Specifications or Technical Specification changes issued subsequent to this submittal are not reflected in the enclosed markup.
Retvoe of Proposed Changes 1
1 A copy _of the retyped-Technical Specification pages are contained in Attachment 3.
j LThe retyped pages reflect the currently issued version of the Technical Specifications.'
)
.Pending Technical Specification changes-or: Technical Specification changes issued j
i 070.031 Po2
- E i! M 8SSia$ 7 MppEppppp.H l
a, p
PDRg; J :
i 2,
U.S. Nuclear Commission i
B16301Page 2 j
subsequent to this submittal are not reflected in the enclosed retype. The enclosed retype should be checked for continuity with Technical Specifmations pnor to issuance i
Baderound. Safety Assessment. Signifmant Hazards Consideration and Envronmental Considerations The Background, Safety Assessment, Signifcant Hazards Consideration and Environmental Considerations that support these proposed changes are contained in
]
Attachments 4 and 5.
Plant Operations Review Committee and Nuclear Safety Assessment Board Review The Plant Operations Review Committee and the Nuclear Safety Assessment Board have reviewed this proposed amendment request and concur with the above determinations.
State Notification In accordance with 10CFR 50.91(b), we are providing the State of Conrecticut with a copy of this proposed amendment to ensure their awareness of this request.
Scladule Reauest for NRC Aporoval NNECO requests NRC review and approval of this proposed changes by October 1, 1997 and that the license amendment be effective upon issuance with implementation within sixty (60) days if the NRC Staff should have any questions or comments regarding this submittal, please contact Mr. J. Peschel at (860) 437-5840 3
Very truly yours, i
l NORTHEAST UCLEAR ENERGY COMPANY Mh h M.H. Brothers' Vice President - Millstone Unit No. 3 Subscribed and sworn to before me this t3 / ___ day of 1997 M 0. 67L/
Date Commission Expires /AJ/ 2odA f
1
U.S. Nuclear Commission B16301Page 3 cc-H. J.
Miller, Region 1 Administrator W.D. Travers, Dr., Director, Special Projects Offee J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 A. C. Corne, Senior Resident inspector, Millstone Unit No. 3 Mr. Kevin T.A. McCarthy, Director Bureau of Air Managemant Monitoring and Radiation Division Department of Environmental Protection 79 Elm Street Hartford, CT 06106-5127 J
f l
4 4
t
e Docket No. 50-423 B16301 t
i 1
Millstone Nuclear Power Station Unit No. 3 Proposed Revision to Technical Specification Auxiliary Feedwater Pump Surveillances (PTSCR 3-9-96)
NNECO's Commitments i
March 1997
U.S. Nuclear Commission B16301%ttachment 1\\Page 1 Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document.
Any othor actions discussed in the submittal represent intended or planned actions by NNECO. They are described to the NRC for the NRC's information and are not regulatory commitments.
Please notify the Manager - Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this document or any associated regulatory commitments.
Commitment Committed Date or Outage NONE N/A 1
j 1
I J
'I a
l Docket No. 50-423 B16301 1
i 1
4 Milistone Nuclear Power Station Unit No. 3 Proposed Revision to Technical Specification Auxiliary Feedwater Pump Surveillances (PTSCR 3-9-96)
Marked Uo Paaes 4
i i
4 i
i March 1997 1
t I