Safety Evaluation Supporting Amend 112 to License DPR-50
ML20137M426
Person / Time
Site: Crane Constellation icon.png
Issue date: 01/15/1986
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20137L509 List:
References
NUDOCS 8601280272
Download: ML20137M426 (2)


Text

_ _

.d* "%j*o,,

UNITED STATES

[

g NUCLEAR REGULATORY COMMISSION G

p WASHINGTON, D. C. 20555

%...../

SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION SUPPORTING AMENDMENT NO.112 TO FACILITY OPERATING LICENSE. NO. DPR-50 METROPOLITAN EDISON COMPANY JERSEY CTNTRAL POWER AND LIGHT COMPANY PENNSYLVANIA ELECTRIC COMPANY GPU NUCLEAR CORPORATION THREE MILE ISLAND NUCLEAR STATION, UNIT NO. 1 DOCKET NO. 50-289 INTRODUCTION By letters dated May 28, 1985, and September 30, 1985, General Public Utilities (GPU) Nuclear Corporation (the licensee) requested an amendment to Facility Operating License No. DPR-50 for Three Mile Island Nuclear Station, Unit 1.

The proposed amendment would revise Figure 6-2 of the Technical Specifications (TSs) to show the addition of managers reporting to the Plant Engineering Director. Plant Engineering Managers would supervise several of the existing Lead Discipline Engineers.

DISCUSSION AND EVALUATION Currently, Figure 6-2 shows a plant engineering organization of a Lead Nuclear Engineer, Lead Instrument and Control Engineer, Lead Electrical Engineer, Lead Mechanical, Supervisor Chemistry and Technical Analyst Fire Protection reporting to the Plant Engineering Director. The proposed revision was submitted by the licensee to improve the organizational structure and provide additional management control of the engineering workload. The change shows the Lead Instrument and Control Engineer, Lead Electrical Engineer, Lead Mechanical Engineer and Technical Analyst Fire Protection reporting to Plant Engineering Managers. Current plans are for two such. positions, with several of the Lead Engineers reporting to one of the two managers. The change establishes a limit of six such managers so as not to dilute the span of management control. The Chemistry Supervisor title has been changed to Staff Chemist. The Lead Nuclear Engineer and Staff Chemist continue to report directly to the Plant Engineering Director, and the organization maintains the same number and types of staff. This proposed amendment is consistent with the Standard TSs.

Based on the above, we find that the licensee's requested change constitutes additional management control through an improved organizational structure of the Plant Engineering Department. Therefore, this change is acceptable.

ENVIRONMENTAL CONSIDERATION inis ameadment involves only the addition of management positions to the Plant Engineering Department. Accordingly, this amendment meets the criteria 8601280272 860115 PDR ADOCK 05000289-P PDR,

.e e

y w +

+-e-

for categorical exclusion set forth in 10 CFR 51.22(c)(10). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of this amendment.

~

CONCLUSION We have concluded, based on the considerations discussed above, that (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, and (2) such activities will be conducted in compliance with the Commission's regulations fand the issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public.

i s

Dated: January 15, 1986 Principal Contributor:

G. Napuda O