1
'
,[g" "%rgA,
NUCLEAR REGULATORY COMMISSION
,
UNITED STATES
_.
REGloN IV
'.f
- #41
611 RYAN PLAZA DRIVE, SulTE 400
!
Y#
's,, .....#
ARLINGTON, TE XAS 76011-8064
April 2,1997
Otto L. Maynard, President and
Chief Executive Officer
Wolf Creek Nuclear Operating Corporation
'
P.O. Box 411
!
Burlington, Kansas 66839
-
,
i
SUBJECT:
NRC INSPECTION REPORT 50-482/97-05 AND NOTICE OF VIOLATION
1
i
Dear Mr. Maynard:
An NRC inspection was conducted January 27-31 and February 10-14,1997, at your Wolf
'
Creek Generating Station reactor facility. The enclosed report presents the scope and
results of that inspection. The overall results of this inspection were discussed with
~
Mr. T. Damashek of your staff on April 2,1997.
The inspection team concluded that conditions adverse to quality were being appropriately
)
identified at the Wolf Creek Generating Station. Your quality assurance program had
identified a weakness in the ability to perform effective root cause evaluations and
corrective actions for significant performance improvement requests. We noted that you
had initiated significant corrective actions for the identified weakness including the
,
establishment of a Corrective Action Review Board, the selection of Performance
,
l-
Improvement Coordinators, and planned root cause evaluation training. We encourage full
implementation of your corrective actions to improve the performance of your root cause
evaluations and the effectiveness of your corrective action program.
!
The team also identified that you had performed an acceptable functional assessment of
!
your auxiliary feedwater system as corrective action for NRC Enforcement
Action EA 96-124, dated July 1,1996. The assessment identified several weaknesses,
including inconsistent implementation of (1) lessons-learned from industry experience,
(2) testing and surveillance requirements, and (3) completion of corrective actions for
closed performance improvement requests. A noncited violation associated with a failure
to adequately perform a Technical Specification Surveillance Requirement was identified.
J
The inspection identified a violation involving the failure to correct an identified low flow
'
condition to the component cooling water system radiation monitor. This violation is cited
in the enclosed Notice of Violation (Notice) and the circumstances surrounding the violation
is described in detailin the enclosed report. Please note that you are required to respond
'
to this letter and should follow the instructions specified in the enclosed Notice when
preparing your response. The NRC will use your response, in part, to determine whether
further enforcement action is necessary to ensure compliance with regulatory
' requirements.
i
-9704090063 970402
ADOCK 05000482
@,I
O
'
-
.
.
Wolf Creek Nuclear
-2-
Operating Corporation
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,
its enclosure (s), and your response will be placed in the NRC Public Document Room
(PDR). To the extent possible, your response should not include any personal privacy,
proprietary, or safeguards information so that it can be placed in the PDR without
redaction.
Should you have any questions concerning this inspection, we will be pleased to discuss
them with you.
Sincerely,
.~
,
,!
%
.
/'
Arthur T. Howell Ill, Director
Division of Reactor Safety
Docket No.: 50-482
License No.: NPF-42
Enclosures:
2. NRC Inspection Report
50-482/97-05
cc w/ enclosures:
Chief Operating Officer
Wolf Creek Nuclear Operating Corp.
P.O. Box 411
Burlington, Kansas 66839
Jay Silberg, Esq.
Shaw, Pittman, Potts & Trowbridge
2300 N Street, NW
Washington, D.C. 20037
Supervisor Licensing
Wolf Creek Nuclear Operating Corp.
P.O. Box 411
Burlington, Kansas 66839
-
.
..
-Wolf Creek Nuclear
-3-
'
- Operating Corporation -
Chief Engineer -
Utilities' Division
Kansas Corporation Commission
-1500 SW Arrowhead Rd.
Topeka, Kansas ' 66604-4027
~ Office of the Governor
State of Kansas
.. Topeka, Kansas 66612;
Attorney General
-Judicial Center
301 S.W.10th
J ' 2nd Floor -
Topeka, . Kansas 66612-1597
. County Clerk -
Coffey County Courthouse
Burlington, Kansas 66839-1798
Public Health Physicist
Division of Environment
Kansas Department of Health
and Environment
Bureau of Air & Radiation
Forbes Field Building 283
Topeka, Kansas 66620
Mr. Frank Moussa
Division of Emergency Preparedness
2800 SW Topeka Blvd
Topeka, Kansas 66611-1287
i
_ - - _
_
, ___
.
.
Wolf Creek Nuclear
-4-
Operating Corporation
3
E-Mail report to T. Boyce (THB)
!
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
bec to DCD (IE01)
bec distrib, by RIV:
l
,
Regional Administrator
Resident inspector
DRP Director
SRI (Callaway, RIV)
Branch Chief (DRP/B)
DRS-PSB
.
'
Project Engineer (DRP/B)
MIS System
'
Branch Chief (DRP/TSS)
RIV File
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
Allegation Coordinator (2)
' Enforcement Officer
i
!
i
!
)
1
l
,
i
j
DOCUMENT NAME: R:\\_WC\\WC705RP.WPA
To receive copy of document, indicate in box: "C" = Copy without enclosures
"E" = Copy with enclosures "N" = No copy
j
RIV: SRI:EB
E
RI:EB
PE:PBB
RI:EB
WPAng/Imb *
LJSmith *
DNGraves *
DBPereira
03/20/97
03/20/97
03/21/97
03/21/97
"
- . :--
muu muu
menumaumnummusemessasumus munnenumumamuse =
E:EB
E
D:DRP
,jp
D:DRS
CAVanDenburgh *
TPGwyn$ (
ATHowgl
03/21/97
03$/97 V
OBfg
'
'Previously concurred
OFFICIAL RECORD COPY
i
\\.
i
080005
t
.
.
. .
.
-
Wolf Creek Nuclear
-4
t
Operating Corporation
i
E-Mail report to T. Boyce (THB)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
bec to DCD (IE01)
bec distrib. by RIV:
!
i
Regional Administrator
Resident inspector
t
DRP Director
SRI (Callaway, RIV)
Branch Chief (DRP/B)
DRS-PSB
Project Engineer (DRP/B)
MIS System
'
Branch Chief (DRP/TSS)
RIV File
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
Allegation Coordinator (2)
Enforcement Officer
l
DOCUMENT NAME: R:\\_WC\\WC705RP.WPA
To receive copy of document. Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
RIV: SRI:EB
E
RI:EB
PE:PBB
Rl:EB
WPAng/Imb *
LJSmith *
DNGraves*
DBPereira
j
03/20/97
03/20/97
03/21/97
03/21/97
u um uma
e a uma en = = = =
==
======
==
E:EB
E
D:DRP
p
D:DRS
,
CAVanDenburgh *
TPGwyn$
'
A,T,Howgl
03/21/97
03$/97 V
Ollp'M
'
'Previously concurred
OFFICIAL RECORD CDPY
i