ML20137M260

From kanterella
Jump to navigation Jump to search
Errata to Phase II Rept for Evaluation of In-Depth Technical Audit Results Millstone Unit 3 Project
ML20137M260
Person / Time
Site: Millstone 
Issue date: 12/04/1985
From: Eifert W, Nordquist D
NORTHEAST UTILITIES SERVICE CO., STONE & WEBSTER ENGINEERING CORP.
To:
Shared Package
ML20137M236 List:
References
NUDOCS 8601280228
Download: ML20137M260 (2)


Text

..

D2cembsr 4, 1985 i

ERRATA FOR PHASE II. REPORT FOR EVALUATION' 4

0F IN-DEPTH TECHNICAL AUDIT RESULTS MILLSTONE UNIT 3 PROJECT NORTHEAST UTILITIES

- SERVICE COMPANY

/

jf

/Z Y 95 W.K. Eifep (SWEC)

Date Chief Engineer Engineering Assurance O

k D.O. Nordqisist (NUSCO)

Date Manager of Quality Assurance i

8602280228 960120 DR ADOCK 05000423 p

PDR

  • -. +

-r

.-ua yw-e

_ = _.

I

.Pagn ' of'1 Deceu ver 4,1985 ERRATA FOR i

PRASE II REPORT FOR EVALUATION OF IN-DEPTH TECHNICAL AUDIT RESULTS I

MILLSTONE UNIT 3 PROJECT CHANGE PAGE LOCATION FROM TO 4

2-1 last. paragraph Appendix 20 Appendix 4.20 2nd line 3-1 3rd paragraph These AO's and The invalid findings 3rd line

... the invalid are listed in Appendix j

findings.

4.6.

The reasons for j

the invalid findings are discussed in Section 3.16.

3-6 last paragraph Appendix 4.9 iden-Page 4 of Appendix 1st line tifies those...

4.12 lists those...

4 j

3-9 10th paragraph

' This section refers i

to design... or.

j technical design j

methods.

i l

3-14 5th full paragraph findigns findings I

2nd line f

3-15 item 5.,

5th line content contact.

3 i-3-16 last paragraph 3.8 3.6 last line Appendix Appendix 1 SWEC New York 4.1 Page 1 of 4 Independent Review

)

Ist paragraph i

2nd line l

Appendix Page 1 of 5 LISTING OF AUDIT LISTING OF AUDIT FINDINGS i

4.18 1st title line FINDINGS WHICH WOULD WHICH WOULD HAVE BEEN HAVE BEEN DELETED DETECTED

{

.This 10th paragraph was deleted in its entirety.

l l

This phrase was deleted.

,f i

i 4

-.-,-m--

,,-n m

.ma-

--w-,,

,,,,,r--

?

ny,

,n-w,,--

,,w

,-pw m,-

r-,

y

--