Provides Info Superseding 840531 Submittal & Informs That IE Bulletins 79-02 & 79-14 Mod Effort Not Entirely Complete. Confirmation Will Be Provided as Part of Final Rept in Response to Confirmatory Action Ltr 85-13
ML20137L969
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/20/1985
From: Williams J
TOLEDO EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
1-598, CAL-85-13, CAL-85-13., IEB-79-02, IEB-79-14, IEB-79-2, NUDOCS 8601280157
Download: ML20137L969 (1)


Text

smO TOLEDO EDISDN Docket No. 50-346 License No. NPF-3 (OE Sf A

(419)249 2300 Serial No. 1-598 Id'S*W23 December 20, 1985 Mr. James G. Keppler, Regional Administrator United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137

Dear Mr. Keppler:

With regards to NRC I&E Bulletin 79-02 (Log No. 1-113) and NRC ISE Bulletin 79-14 (Log No. 1-199), Toledo Edison Company '(TED) provided a letter dated May 31, 1984 (Serial No. 1-429) which stated that the hanger modifications and physical implementation work activities under the I&E Bulletins were complete for Davis-Besse Nuclear Power Station Unit No. 1.

Since that time however, several Facility. Change Requests (FCR) which were originally issued as a result of the I&E Bulletin walkdowns were identified as open. Also, several work items were identified as closed, but the work was not yet fully completed.

This letter is provided to supercede our previous submittal (Serial 1-429) and inform you that the I&E Bulletin 79-02 & 79-14 modification effort is not yet entirely complete.

Based upon our current Seismic Category I Piping System Support and Hanger Inspection Program, the status of which was most recently provided in Serial No. 1-599, any additional incomplete ISE Bulletin 79-02 & 79-14 modifications will also be identified, included in our current review effort, and completed as necessary. We will provide confirmation of the completion of the I&E Bulletin 79-02 and 79-14 effort as part of our final report in response to the completion of Confirmatory Action letter d5-13, Items 2 and 3.

Very truly yours, Ofc=

JW: B cc: DB-1 NRC Resident Inspector D. Danielson, NRC Region III h