ML20137L759

From kanterella
Jump to navigation Jump to search
Notifies That Equipment,Facilities,Procedures & Instructions Necessary for Use of Respiratory Equipment in Place at Facility,Per 10CFR20.103(g).Summary Form for Rept NP-03-01, First Use of Respiratory Protective Equipment, Encl
ML20137L759
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 01/13/1986
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
PY-CEI-OIE-0163, PY-CEI-OIE-163, NUDOCS 8601280079
Download: ML20137L759 (3)


Text

i

/)/ tid

  • a f THE CLEVELAND ELECTR P.o. Box 5000 - CLEVELAND. OHlo 4410t - TELEPHONE (216) 622-9800 - ILLUMINATINo BLDo. - 55 PL 9LIC SQUARE Serving The Best Location in the Nation hk MURRAY R. EDELMAN

, WC

$C[AR January 13, 1986 C

PY-CEI/01E-0163 L

  • [

&' p g/LQ--

'$WE Mr. James G. Keppler fil O '

Regional Administrator, Region III Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL.

60137 Perry Nuclear Power Plant Docket No. 50-440 Report Prior to First Use of Respiratory Equipment 10 CFR 20.103 (g)

Dear Mr. Keppler:

This letter provides the notification as required by 10 CFR 20.103(g) that the Cleveland Electric Illuminating Company has in place the equipment, facilities, procedures and instructions necessary for the use of respiratory equipment at the Perry Nuclear Power Plant.

If you have any questions, please feel free to call.

Very truly yours, M

Murray R. Edelman Vice President Nuclear Group MRE:njc cc:

J. Grobe, NRC Resident Site Office SBB-50 Document Control Desk-U.S. Nuclear Regulatory Commision Washington, D. C.

8601280079 860113 PDR ADOCK 050 0

^

iaN 161996 n 3 f6#

.?

PERLY NUCLEAR POWER PLANT REPORT NUMBER k-O 3'6/

b(Sk dM N I6

  1. h REPORT TITLE O

9s%\\.4 c.M Y ugMAh DATE

% - b-Ob

[ho.skov k ? ',

W M/79 2,

PREPARED BY:

W Uc,<~uk. f _]Q

(

APPROVED BY:

6 & Jo( k ~

b<

M h L. \\f aabr%<sH hhh e auss - Pr BL 2.on:

%d L p

\\

e i

REPORT

SUMMARY

FORM (RSF)

PREP. RESPONSIBILITY:

p, Report Subject /

Title:

Report Number:

First Use of Respiratory Protective Equip ent NP 0/

References:

Condition Report

/y j h 10CFF20.103(g)

Number:

Content / Format Instructions:

See 10CFR20.103 for content.

(

t Start Date Comments Due Report Approved Mail Date Received Date Due Date l 6 (o l-g- 8c, 1 6 4 1- / o -4 NA.

/- /o-e>6 Timing / Method:

Distribution Copies

~ -

Written report. 30 days prior to first -

1.

Regional AA=4nistrator 1

use of equipment.

Region III. USNRC';

REVIEW:

799 Roosevelt Road'

[ ] Maintenance Section GS.

Glen Ellyn, IL.C60137

[ ] Operations Section CS'

[ ] Technical Superintandent

[X] Radiation Protection CSE

[ ] Supervisor Administrative Unit

[ ] Technical Section CSE

[ ] Site Protection GS

[ ] PORC

[ ] Plant Technical Section

[ ] Plant Operations Section

[ ] OQS

[ ] NDAS

[ ] ISEC

[ ] N3RC

' [X] Health Physicist APPROVAL:

[X] Plant Technical Manager

[ ] Plant Operations Manager I

[X] V.P. Nuclear Group

_