ML20137K424
| ML20137K424 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 03/19/1997 |
| From: | Caldwell J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Myers L CENTERIOR ENERGY |
| Shared Package | |
| ML20137K428 | List: |
| References | |
| EA-97-047, EA-97-47, NUDOCS 9704070027 | |
| Download: ML20137K424 (4) | |
See also: IR 05000440/1996018
Text
.
.-.
y-..
..=s
a
..-- -.~. -.~..
-
-
-.. . ... - . . ~
-
--
.c
Pukic
l
,
,
i
. EG- Of
)
, .
!
March 19,1997
'
EA 97-047
1
- Mr. Lew W. Myers
,
Vice President - Nuclear
'l
'
,
-
Centerior Service Company
1
'
P. O. Box 97, A2OO
Perry, OH 44081
]
'
1
SUBJECT:
NRC INSPECTION REPORT NO. 50-440/96018 AND
l
Dear Mr. Myers:
f
3
On February 3,1997, the NRC completed a routine safety inspection at your Perry 1
1
l
reactor facility. The enclosed report presents the results of that inspection.
4
During this 7-week inspection period one plant transient, involving a steam line drain leak,
occurred that impacted on the plant's operation. The operations staff responded well to
i
this event. One plant scram occurred due to personnel error and, during the response, an
excessive cooldown of the vessel occurred, due to an inadequate procedure.
We are concerned about an issue that was a violation of NRC requirements. In this
".
case, your monitoring of the reactor cooldown temperature during the reactor scram on
. January 7,1997, was inadequate. The procedure used allowed readings to be taken from
'
temperature sensors that did not reflect the actual cooldown rate. This contributed to an
inadequate awareness of the cooldown rate which exceeded the TS limits.
This violation is cited in the enclosed Notice of Violation, and the circumstances
surrounding the violation are described in detail in the enclosed report. Please note that
you are required to respond to this letter and should follow the instructions specified in
the enclosed Notice when preparing your response. The NRC will use your response, in
I
part, to dstormine whether further enforcement action is necessary to ensure compliance
l
with regulatory requirements.
Based on the results of this inspection, an apparent violation was also identified and is
'
,
being considered for escalated enforcement action in accordance with the " General
Statement of Policy or d Procedure for NRC Enforcement Actions" (Enforcement Policy),
)
+
1
4
l
9704070027 970319
.
ADOCK 05000440
""
8.BSEpppppps
'
i
,
- . , , . ,
e
,. - . -
n-
n-.,
, - ,. ,
.e,
-,--n
,.
.e-e.
-
-,r.
__
_
_ . _ _
. _ _..-___ . . _ . _ _ . - _
_ _ _
_.
- _ _ _ _ _ _ . . _ _ _ _
l
l
l
L W. Myers
-2-
!
.
The apparent violation involved ineffective corrective actions that led to a positive
reactivity transient. No Notice of Violation is presently being issued for the apparent
violation. In addition, the number and characterization of apparent violations described in
the enclosed inspection report may change as a result of further NRC review.
An open pre-decisional enforceraent conference is scheduled for April 18,1997, to discuss
the apparent violation, as well as other apparent violations identified in inspection Reports
50-440/96017 and 50-440/96016. The decision to hold a pre-decisional enforcement
conference does not mean that the NRC has determined that a violation has occurred or
that enforcement action will be taken. This conference is being held to obtain information
i
to enable the NRC to make an enforcement decision, such as a common understandmg of
'
the facts, root causes, missed opportunities to identify the apparent violations sooner,
corrective actions, significance of the issues, and the need for lasting and effective
corrective actions. In addition, this is an opportunity for you to point out any errors in our
inspection report and for you to provide any information concoming your perspectives on:
J
1) the severity of the violations, 2) the application of the factors that the NRC considers
I
when it determines the amount of a civil penalty that may be assessed in accordance with
i
Section VI.B.2 of the Enforcement Policy, and 3) any other application of the Enforcement
Policy to this case, including the exercise of discretion in accordance with Section Vll.
You will be advised by separate correspondence of the results of our deliberations on this
matter. No response regarding these apparent violations is required at this time.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and the enclosures will be placed in the NRC Public Document Room (PDR).
Sincerely,
/s/ J. A. GInbe for
James L. Caldwell, Director
Division of Reactor Projects
'
Docket No. 50-440
License No. NPF-58
Enclosures:
2. Inspection Report 50-440/96018
tama anashed monesvannat
"W feME: ft WsOMPTOW0thEftBWEfWttPEfl00010.Dfr
l
u -. .
.
.-m.
av.
- v-s
--
"
_IM
"
l
I
"
I
-
a-
-
- :-
g
..
..
..
.-
..
_
,
.
L. W. Myers
-3-
,
l
.
cc w/ encl:
L. W. Worley, Director, Nuclear
Services Department
H. L. Hegrat, Manager,
Regulatory Affairs
W. R, Kanda, Director, Quality and
Personnel Development
J. J. Powers, D; rector,
Nuclear Engineering Department
R. D. Brandt, General Manager,
Nuclear Power Plant Department
'
Terry J. Lodge, Esq.
State Liaison Officer, State of Ohio
?
'
Robert E. Oiuen, Ohio
Department of Health
C. A. Glazor, State of Ohio
Public Uf.ilities Commission
Distribution:
Docket File w/ encl
SRI Perry w/enci
PUBLIC lE-01 w/enci
DRP w/enci
'
OC/LFDCB w/enci
Rill PRR w/enci
Project Manager, NRR w/ encl
CAA1 w/enci (E-mail)
A. B. Beach, w/enci
Rlli Enf. Coordinator, w/ encl
W. L. Axelson, w/ enc!
DRS (3) w/enci
TSS w/enci
J. Lieberman, OE w/enci
J. Goldberg, OGC
R. Zimmerman, NRR w/ encl
DOCUMENT NAME: G:\\DRP\\PER96018.DRP
To receive e copy of th6s _'- ---- -.f, Indoete nn the bos "C" = copy w/o attach /enct "E" = Copy w/ attach /enci "N" = No
copy
OFFICE
Rijlo j
N
Rlli
Rill
Rlli e
l Cp1pWei
SdWw'eibinz/co
Clay n g /.
J
s
HolmberdT/n M
$N
IT Vf
DATE
2/a7/97
1/g97 I
2A09 U
3/$97
OFFICIAL RECORD COPY
f
_ _ _
__
_
.
_ _.
.. ._
_. .
.
. ..
_ __ __ __ ._._
_
. I
r
.
L W. Myers
3-
>
-
-
. ,
.
,
cc w/ encl:
L. W. Worley, Director, Nuclear
,
Services Department
l
H. L. Hegrat, Manager,
Regulatory Affairs
W. R, Kanda, Director, Quality and
Personnel Development
,
'
J. J. Powers, Director,
Nuclear Engineering Department
'
R. D. Brandt, General Manager,
4
Nuclear Power Plant Department
Terry J. Lodge, Esq.
State Liaison Officer, State of Ohio
Robert E. Owen, Ohio
Department of Health
C. A. Glazer, State of Ohio
Public Utilities Commission -
Distnbution:
Docket File w/enci
SRI Perry w/onci
,
PUBLIC IE-01 w/enci
DRP w/enci
OC/LFDCB w/enci
Rlli PRR w/enci
Project Manager, NRR w/enct
CAA1 w/onci(E-mail)
A. B. Beach, w/ encl
Rill Enf. Coodinator, w/ encl
Deputy RA, w/onci
DRS (3) w/onct
TSS w/enci
J. Lieberman, OE w/enci
J. Goldberg, OGC
R. Zimmerman, NRR w/enci
i
l
i
1
,e
-, ----
u-------.
r --,
,r,
,,-_
-
,
,
,
, ,