ML20137K111

From kanterella
Jump to navigation Jump to search
Provides Response to Two Issues Discussed at 970210 Roundtable Panel Held in Haddam Town Hall W/Senator Dodd & Other Officials
ML20137K111
Person / Time
Site: Millstone, Haddam Neck  File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 04/02/1997
From: Fairtile M
NRC (Affiliation Not Assigned)
To: Debold M
HADDAM, CT
References
NUDOCS 9704040242
Download: ML20137K111 (3)


Text

' ;t guro Sed

[ 4 UNITED STATES

' i g j t

NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001

\.,,+/

4 April 2, 1997 Mrs. Marjorie W. DeBold First Selectman Town of Haddam 30 Field Drive

Haddam, Connecticut 06438

Dear Mrs. DeBold:

At the February 10, 1997, roundtable panel discussion held in the Haddam Town Hall with Senator Dodd and other federal, state and local officials, NRC staff members promised to respond to the following two issues of interest to the panel.

, Issue 1:

Could spent fuel or other high level waste from Haddam Neck be shipped to Millstone or from Millstone to Haddam Neck?

Response

This could only be accomplished through license amendments issued to all the involved sites. Such requests from the licensees are subject to public comment arid provide the opportunity to request a hearing and intervention.

The NRC staff is required by Commission regulations also to consult with the appropriate Connecticut State Officials before such a license amendment is issued. In the past, the NRC has approved similar license amendment requests.

However, it should be pointed out that because of the physical differences between Haddam Neck fuel and the various fuels used at the Millstone Station, such a fuel transfer most likely would require new fuel racks at the receiving site. Further, changes in items such as shipping casks and crane capability might initiate further licensing requirements.

Issue 2:

Could the site be released for unrestricted use in phases, evers assuming the spent fuel remains on the site in either the spent fuel pool, under water, or in a dry storage facility?

Response

If the Cannecticut Yankee Atomic Power Company can demonstrate that the levels of radioactive contamination in the areas it might desire to release in stages is at or below the NRC site release criteria in force at the time of the request, and the NRC has verified that the applicable criteria has been met, ,'

those portions of the site could be released. Further, if any of the areas CYAPC0 proposed to release were described in the Technical Specification, then I an g propriate license amendment would be required to revise the description. '

l D As noted above, any license amendment is subject to public comment and the opportunity to request a hearing. The NRC is presently engaged in rulemaking in establishing such release criteria.

9704040242 970402 PDR ADOCK 05000213 H PDR

-~.

r Mrs. Marjorie W. DeBold April 2, 1997

, ' A copy of this letter is being furnished to Senator Dodd's office. I hope you I 2

received the two copies of the TMI Advisory Panel NUREG that I sent you 3 earl ier.

Sincerely, originalsignedTby: '

f ,

  • Morton B. Fairtile, Senior Project Manager

'Non-Power l Reactors and Decommissioning ,

s Project Directorate < l Division of Reactor Program Management Office of" Nuclear. Reactor' '"

Regulation l

. .- 5, l

, J l

i f

+ -

DISTRIBUTION:  ;

Docket File 50-213 SWeiss' > 4 '

OGC (015-B-18)  !

PUBLIC MMasnik MWebber (T7-F27)

PDND r/f EHylton Region I i TMartin MFairtile ,* PHarris TFredrichs MWebb RDudley MCallahan, CA

  • SEE PREVIOUS CONCURRENCE PDND:PM);ef- PDND:LA F CA*

MFairtile EHylton MCallahan f///97 / /97 3/12/97 PDND:(A)SC OGC* PD MMg;nik N EHoller SWeiss

'/ / 4/97 4/1/97 4/ 2-/97 0FFICIAL RECORD COPY DOCUMENT NAME: A:\DEBOLD

. . _ - - - . . . - . . = - . - . _ . . - .- .-. ... - -_ - .. _ _ - . . . .. - _ - - . . -

)

, 'e

L Mrs. Marjorie W. DeBold a A copy of this letter is being furnished to Senator Dodd's office. I hope you received the .two copies of the TMI Advisory Panel NUREG that I sent you earlier.

! Sincerely,

. ,, ~: ,, ~.- -

cf' a

ll . n. lcW c t .. .

9

~Cic 2 i t LC  :

q Morton B. Fairtile, Senior Project Manager '

Non-Power Reactors and Decommissioning i

Project Directorate

' Division of Reactor Program Management Office of Nuclear Reactor Regulation .

i l i

1 d

l l

1 l