OPERATING DATA REPORT DOCKET NO.
50-263______
DATE 7-1 -8 5____
COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 OPERATING STATUS INotes 1
- 1. Unit Name'. ________________________Monticelto i
1
- 2. Reporting period: ___________________ JUNE l
l
- 3. Licensed Thermal Power (MWt):
____________1670 l
l
- 4. Nameplate Rating (Gross MWe): _____________569 l
l
- 5. Design Electrical Rating (Net MWe): _____545.4 l
l
- 6. Maximum Dependable Capacity (Gross MWe): __564 l
[
- 7. Maximum Dependable Capacity (Net MWe): ____536 l__________________________l
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe): ___N/A___________________
- 10. Reasons For Restrictions, If Any: __N/A_____________________________________
This Month Yr.-to-Date Cumu la t i ve
- 11. Hours In Reporting Period
_____720
_____4343
___._122736
- 12. Number Of Hours Reactor Was Critical
___712.0
___3777.9
__ 93864.1
- 13. Reactor Reserve Shutdown Hours
_____0.0
______0.0
_____940.7
- 14. Hours Generator On-Line
___707.7
___3677.8
__ 91664.5
- 15. Unit Reserve Shutdown Hours
_____0.0
______0.0
_______0.0
- 16. Gross Thermal Energy Generated (MWH)
_1150579
. 5919573
_139114119
- 17. Gross Electrical Energy Generated (MWH) __392849
__2026557
__47211610
- 18. Net Electrica L Energy Generated (MbH)
__377157
__1947775
__45132828
- 19. Unit Service Factor
__ 98.3%
___ 84.7%
____ 74.7%
- 20. Uni t Availabili ty Factor
__ 98.3%
___ L4.7%
____ 74.7%
- 21. Unit Capac?ty Factor (Using MDC Net)
__ 97.7%
___ 83.7%
____ 68.6%
- 22. Unit Capacit, Factor (Using DER Net)
__ 96.0%
___ 82.2%
____ 67.4%
- 23. Unit Forced _0utage Rate i.7%
0.9%
5.1%
- 24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)
__May 10, 1986 - 1986 refueling outage - 41 days ________________________
- 25. If Shut Down At End Of Report Period, Estimated Date Of Startup:
- 26. Units In Test Status (Prior to Commercia L Operat ion): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8509120035 850711 PDR ADOCK 05000263 7{
t R
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-263______
UNIT MonticelLo__
DATE 7-1-85____
COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 MONTH ______ JUNE DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) i
__________561____________
17
__________551____________
9
__________490____________
18
__-_______550-____----_-_
3
__________551____________
19
__________550____________
4
__________537____________
90
__________548____________
~
5
__________549____________
o1
__________546____________
~
6
__________541____________
79
__________547____________
~~
7
__________550____________
'&3
__________538____________
8
__________428____________
24
__________54'u____________
9
__________534____________
95
__________544____________
~
10
__________550____________
96
__________541____________
~
11
__________549____________
27
__________544____________
12
__________214____________
28
__________541____________
13
__________43o.____________
o9
__________556____________
~
14
__________520____________
30
__________516.___________
15
__________551____________
31 16
__________543____________
INSTRUCTIONS On this format, List the average daily unit power Level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
a e
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-263______
DATE 7-1-85____
COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 MONTH ______ JUNE 6-1-85 to Power Operation.
6-6-85 6-7-85 Power reduced to 60% to perform control rod seguence exchange.
6-8-85 to Power Operation.
6-11-85 6-12-85 Reactor scram due to personnel error during surveillance test.
6-13-85 to Generator on-Line, power operation.
6-30-85 l
SPENT FUEL STORAGE UPDATE i
Fuel assemblies in core 484 Fuel assemblies in spent fuel storage pool 700 Licensed capacity 2237 1
l l
1 l
l i
UNIT Sill'IDOWNS AND POWER REDUCTIONS DOCKET NO. 50-263 UNIT N AME Monticello DATE 7-2-85 COMPl.ETED BY A. L. Myrabo HEPORT AIONTil JUNR TELEPilONE 612/?qs-51st
...=
I E
- E '4 ls.censee 5
=
i u. =
= 7.,
s%
Cause & C. rrectne Date i
5?
4
_3 s 5 Esent n '7 E.]
Ati,on so s
5 '-
Present Recurrence 35 5
jij Repose :
6 8
6-7-85 S
0.0 H
4 N/A ZZZZ ZZZZZZ Power reduced to 60% to perform control rod sequence exchange.
9 6-12-85 F
12.3 H
3 N/A ZZZZ ZZZZZZ Reactor scram due to personn&1 error during surveillance test.
i b
l 3
4 F: fenced Renon.
hie hod:
Estabis G-Insieuctions S Sch.:Jule 1 A Equipment failure:Esplaint 141anual fin Pseparation of Daia B.Mainierunee oi Tes 2414nual Seram.
Ents> Sheeis for Licensee C-Refuchng 3.'Autonutie Ssram.
Eseni Repin ILf Rl File NUREG..
D Regulatory Restriction 4 Other IEsplaini 01611 I:-Operator Training 11.i ens 1:umination F. AJ nunist rati.e G Opesaisonal Eeror ll.spla:al Esinbis 1. Same Source p8177) 110:her (E splau;)
.