Revised Monthly Operating Rept for June 1985
ML20137J987
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 06/30/1985
From: Myrabo A
NORTHERN STATES POWER CO.
To:
Shared Package
ML20137J962 List:
References
NUDOCS 8509120035
Download: ML20137J987 (5)


Text

.*

OPERATING DATA REPORT DOCKET NO.

50-263______

DATE 7-1 -8 5____

COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 OPERATING STATUS INotes 1

1. Unit Name'. ________________________Monticelto i

1

2. Reporting period: ___________________ JUNE l

l

3. Licensed Thermal Power (MWt):

____________1670 l

l

4. Nameplate Rating (Gross MWe): _____________569 l

l

5. Design Electrical Rating (Net MWe): _____545.4 l

l

6. Maximum Dependable Capacity (Gross MWe): __564 l

[

7. Maximum Dependable Capacity (Net MWe): ____536 l__________________________l
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe): ___N/A___________________
10. Reasons For Restrictions, If Any: __N/A_____________________________________

This Month Yr.-to-Date Cumu la t i ve

11. Hours In Reporting Period

_____720

_____4343

___._122736

12. Number Of Hours Reactor Was Critical

___712.0

___3777.9

__ 93864.1

13. Reactor Reserve Shutdown Hours

_____0.0

______0.0

_____940.7

14. Hours Generator On-Line

___707.7

___3677.8

__ 91664.5

15. Unit Reserve Shutdown Hours

_____0.0

______0.0

_______0.0

16. Gross Thermal Energy Generated (MWH)

_1150579

. 5919573

_139114119

17. Gross Electrical Energy Generated (MWH) __392849

__2026557

__47211610

18. Net Electrica L Energy Generated (MbH)

__377157

__1947775

__45132828

19. Unit Service Factor

__ 98.3%

___ 84.7%

____ 74.7%

20. Uni t Availabili ty Factor

__ 98.3%

___ L4.7%

____ 74.7%

21. Unit Capac?ty Factor (Using MDC Net)

__ 97.7%

___ 83.7%

____ 68.6%

22. Unit Capacit, Factor (Using DER Net)

__ 96.0%

___ 82.2%

____ 67.4%

23. Unit Forced _0utage Rate i.7%

0.9%

5.1%

24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)

__May 10, 1986 - 1986 refueling outage - 41 days ________________________

25. If Shut Down At End Of Report Period, Estimated Date Of Startup:
26. Units In Test Status (Prior to Commercia L Operat ion): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8509120035 850711 PDR ADOCK 05000263 7{

t R

PDR

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-263______

UNIT MonticelLo__

DATE 7-1-85____

COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 MONTH ______ JUNE DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) i

__________561____________

17

__________551____________

9

__________490____________

18

__-_______550-____----_-_

3

__________551____________

19

__________550____________

4

__________537____________

90

__________548____________

~

5

__________549____________

o1

__________546____________

~

6

__________541____________

79

__________547____________

~~

7

__________550____________

'&3

__________538____________

8

__________428____________

24

__________54'u____________

9

__________534____________

95

__________544____________

~

10

__________550____________

96

__________541____________

~

11

__________549____________

27

__________544____________

12

__________214____________

28

__________541____________

13

__________43o.____________

o9

__________556____________

~

14

__________520____________

30

__________516.___________

15

__________551____________

31 16

__________543____________

INSTRUCTIONS On this format, List the average daily unit power Level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

a e

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-263______

DATE 7-1-85____

COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 MONTH ______ JUNE 6-1-85 to Power Operation.

6-6-85 6-7-85 Power reduced to 60% to perform control rod seguence exchange.

6-8-85 to Power Operation.

6-11-85 6-12-85 Reactor scram due to personnel error during surveillance test.

6-13-85 to Generator on-Line, power operation.

6-30-85 l

SPENT FUEL STORAGE UPDATE i

Fuel assemblies in core 484 Fuel assemblies in spent fuel storage pool 700 Licensed capacity 2237 1

l l

1 l

l i

UNIT Sill'IDOWNS AND POWER REDUCTIONS DOCKET NO. 50-263 UNIT N AME Monticello DATE 7-2-85 COMPl.ETED BY A. L. Myrabo HEPORT AIONTil JUNR TELEPilONE 612/?qs-51st

...=

I E

E '4 ls.censee 5

=

i u. =

= 7.,

s%

Cause & C. rrectne Date i

5?

4

_3 s 5 Esent n '7 E.]

Ati,on so s

5 '-

Present Recurrence 35 5

jij Repose :

6 8

6-7-85 S

0.0 H

4 N/A ZZZZ ZZZZZZ Power reduced to 60% to perform control rod sequence exchange.

9 6-12-85 F

12.3 H

3 N/A ZZZZ ZZZZZZ Reactor scram due to personn&1 error during surveillance test.

i b

l 3

4 F: fenced Renon.

hie hod:

Estabis G-Insieuctions S Sch.:Jule 1 A Equipment failure:Esplaint 141anual fin Pseparation of Daia B.Mainierunee oi Tes 2414nual Seram.

Ents> Sheeis for Licensee C-Refuchng 3.'Autonutie Ssram.

Eseni Repin ILf Rl File NUREG..

D Regulatory Restriction 4 Other IEsplaini 01611 I:-Operator Training 11.i ens 1:umination F. AJ nunist rati.e G Opesaisonal Eeror ll.spla:al Esinbis 1. Same Source p8177) 110:her (E splau;)

.