Forwards Insp Repts 50-373/96-20 & 50-374/96-20 on 961207-970206 & Notice of Violations
ML20137J730
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 03/26/1997
From: Leach M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Subalusky W
COMMONWEALTH EDISON CO.
Shared Package
ML20137J734 List:
References
RTR-REGGD-01.033, RTR-REGGD-1.033 NUDOCS 9704040106
Download: ML20137J730 (3)


See also: IR 05000373/1996020

Text

{{#Wiki_filter:. . . - . . - - . , - - . ~ ~ - . . --.- .. .- - .- . - . . - .-. t - - t [f I L .! M - O/ f (

I i i I ' , March 26, 1997 { E:: Mr'. W. T. Subalusky, Jr. l ' Site Vice President ' LaSalle County Station 1 i Commonwealth Edison Cornpany .. 2601 North 21st Road ' , - Marseilles, IL 61341 i J ! SUBJECT: ' ' NRC INSPECTION REPORT NOS. 50-373/96-20 & 50-374/96-20 AND - NOTICE OF VIOLATION

i ' .

. Dear Mr. Subalusky: 3 On February 6,1997, the NRC completed an inspection at your LaSalle facility. The enclosed report presents the results of that inspection. j During this eight-week inspection period, your staff's performance was characterized by l , instances of procedural non-compliance, lack of knowledge regarding existing system i 1 i: configu'ations and configuration changes resulting from surveillance testing, and the failure l to self-check. These human performance deficiencies along with configuration control j problems that involved removing the wrong component from service and continuing 1 concerns with the work control process, which were identified during this inspection '

-

period, indicate that corrective actions in these areas have not been effective to date. f .We are.also concerned with two violations of NRC requirements tint were identified during , this inspection period. The first violation involves four examples of failing to follow i , procedures. The procedures pertain to the removal of Division 3 breakers from service, a l fire protection surveillance test, transfer of liquid radioactive waste, and implementation of l I fire protection administrative work controls. Although two of the examples were licensee- identified, they are included in the cited violation because they stem from continued

a - weaknesses in the work control process and out-of-service program. The second violation i involves a deficient out-of service instruction which resulted in an operator removing the wrong safety-related bettery breaker from service. The violations are cited in the enclosed Notice of Violation (Notice) and the circumstances surrounding the violations are described q in detail in the enclosed inspection report. ' . You are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response. The NRC will use your response, in part, . 1 to determine whether further enforcement action is necessary to ensure compliance with / ' regulatory requirements. ,

y 1 , - ~ 9704040106 970326 l PDR ADOCK 05000373

"- G PDR .h ' . . . .a, .

- _ __ _ _ ._ _ _ _ _ _ _ _ _ . _ . _ . _ _ . . . . _ . . - _ , -- . . W. T. Subalusky -2-

. . In accordance with 10 CFR 2.790 of the NRC's " Rules of Practices," a copy of this letter,

its enclosure, and your response will be placed in the NRC Public Document Room (PDR).

I

Sincerely, - ,

/s/ M. N. Leach , Melvyn N. Leach, Acting Deputy Director

! Division of Reactor Safety

Docket Nos. 50-373; 50-374 . License Nos. NPF-11; NPF-18 - ' Enclosures: 1. Inspection Report 50-373/374/96020 2. Notice of Violation ' ,

] , f , I . 1 l ' 5 4 ' Document: R:\\lNSPRPTS\\ POWERS \\LASA\\LAS96020.DRP l To receive a copy of this document, indicate in the box "C" = Copy without attach /enci '

  • E" = Copy with attach /enci "N" = No copy

, OFFICE Rill [[ Rlli // Rill M NAME Hills wg Depas t)(4m LeachJth(S) i DATE 03/.V97 03/497 03/4/97 < ~ OFFICIAL RECORD COPY , . Y

. _ . .. . _ _ . . _ ._ _. . _ _ _ _ ._ ... _ . _, . _.. _. _ _._._ - . , W. T. Subelusky 3- - , . i

. , cc w/ encl: T. J. Maiman, Senior Vice President Nuclear Operations Division D. A. Sager, Vice President, . Generation Support - i ! H. W. Keiser, Chief Nuclear q Operating Officer

F. Decimo, Plant General Manager P. Barnea, Regulatory Assurance < Supervisor 1. Johnson, Acting Nuclear f

Regulatory Services Manager

Richard Hubbard j Nathan Schloss, Economist l Office of the Attorney General , ' State Liaison Officer

Chairman, Illinois Commerce ,

Commission i Document Control Desk-Licensing i Docket File w/ encl DRP w/ encl , PUBLIC IE-01 w/enci Rill PRR w/enci OC/LFDCB w/enci SRI LaSalle, Dresden,

CAA1 w/enci (E-rnail) Guad Cities w/enci ' , Project Manager, NRR w/enci A. B. Beach, w/ encl i i' .RAC1 (E-Mail) Deputy RA, w/enci ! Rlli Enf. Coordinator, w/enci DRS (3) w/enci - TSS w/enci ! ' , . 0 $ ! ? s 9 ' j. l ti , , ' i l './. . w u .# w. .., _ _ _ _ _ . . _.,. }}