3e b g o Esc TED CORRESPONDENCR oq'o

+ '

UNITED STATES

[ \*

$ >:. j NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555

\ ....

/ August 28,1985

- ' , 00CKETED ussac -

'85 AUG 29 All :57 horton B. Ma'rgulies, Esq., Chairman Mr. Gustave A. Linenberger, Jr.

Administrative Judge Administrative Judge CFriCE OF SEcatiAn -

Atomic Safety and Licensing Board Atomic Safety and Licensing If8ah5%- lC" Panel Panel U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Washington, D.C. 20555 Dr. Oscar H. Paris Administrative Judge Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Comission Washington, D.C. 20555 In the Matter of GEORGIA POWER C0.

(Vogtle Electric Generating Plant Units 1 and 2)

DocketNos.50-424and50d25(0L)

Dear Administrative Judges:

Enclosed for your information is a copy of the Advisory Committee on Reactor Safeguards Report on the Vogtle Electric Generating Plant, Units 1 and 2, dated August 13, 1985.

Sincerely, M &

j Bernard M. Bordenick l- Counsel for NRC Staff i

Enclosure:

As stated cc w/ encl: David R. Lewis, Esq. Docketing and Service Section Douglas C. Teper Bruce W. Churchill, Esq.

Bradley Jones, Esq. Laurie Fowler, Esq.

James E. Joiner Ruble A. Thomas l Atomic Safety and Licensing Atomic Safety and Licensing

Board Panel Appeal Board Panel L Tim Johnson l .

l 8508300152 850828 l PDR ADOCK 05000424

O PDR l

[

I)S@

g  : \

/ 'e "g UNITED STATES NUCLEAR REGULATORY COMMISSION l

. 8 ,,

  • {

i

c. ,I ADVlsORY COMMITTEE ON REACTOR SAFEGUARDS WASHINGTON, D. C. 205S5

&g August 13, 1985 /

Honorable Nunzio J. Palladino "

Chainnan -

U. S. Nuclear Regulatory Comission Washington, D. C. 20555 -

Dear Dr. Palladino:

SUBJECT:

ACRS REPORT ON THE V0GTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 During its 304th meeting, August 8-10, 1985, the Advisory Committee on Reactor Safeguards reviewed the application of the Georgia Power Company (Applicant), acting on behalf of itself and as agent for the Municipal Electric Authority of Georgia, the Oglethorpe Power Corporation, and the City of Dalton, Georgia, for licenses to operate the Vogtle Electric Generating Plant, Units 1 and 2. The ACRS reported on the construction permit application for this plant on April 16, 1974 The Georgia Power Company also operates the two-unit Hatch Plant, Unit 1 of which has been operating since 1974. Members of the ACRS Subcommittee on Vogtle Electric Generating Plant toured the facility on July 18, 1985 and met in Augusta, Georgia on July 18-19, 1985 to discuss the application.

During our review we had the benefit of discussions with representatives and consultants of the Applicant, the Southern Company Services, Inc.,

Westinghouse Electric Corporation, and the NRC Staff. The Subcommittee also received oral comments from members of the public. We also had the benefit of the documents referenced.

The Vogtle plant is located near Augusta, Georgia. The plant was originally planned as a four-unit station but has been scaled down to two units. Each unit is a four loop Westinghouse pressurized water reactor (PWR) with a rated power level of 3411 MWt. The nuclear steam supply system is similar to several other previously reviewed PWRs, such as Comanche Peak and Wolf Creek. The Applicant has substituted the more ,

advanced Westinghouse Model F steam generators for the originally pro-posed Model D; Construction of Unit 1 is about 80 percent complete while that of Unit 2 is about 50 percent. The Applicant currently estimates the fuel load date for Unit 1 to be December 1986 and for Unit 2 to be about 1.5 years later. Should there be a significant delay in this schedule, we would expect to examine the need for additional review of Unit 2.

In its Safety Evaluation Report, the NRC Staff identified a number of open issues that it needed to resolve prior to the granting of operating licenses. During our meeting, the NRC Staff reported that a number of these issues had been resolved, and we believe the remainder can be dealt with satisfactorily.

Y Honorable Nunzio J. Palladino August 13, 1985 NRC Staff reports of inspections since 1977 have revealed relatively few deficiencies and the Applicant has been responsive to the NRC findings.

To assure compliance with the connitments made in the Final Safety Analysis Report, the Applicant has instituted a Readiness Review Pro- -~

gram. This program includes an independent design review and an NRC review of the findings. In addition, in 1983, the Applicant initiated a Quality Concern Program which pennitted anyone with a concern regarding the quality of the Vogtle units to express it confidentially or anony-mously and have it investigated and resolved. We believe that the Vogtle units have been conservatively designed and constructed and that the management has been alert to the changing state of the nuclear industry and has taken steps to upgrade the plant over its long con-struction life.

We believe that, subject to the resolution of the remaining open issues identified by the NRC Staff, and subject to satisfactory completion of construction, staffing, and preoperational testing, there is reasonable assurance that the Vogtle Electric Generating Plant, Units 1 and 2, can be operated at power levels up to 3411 MWt without undue risk to the health and safety of the public.

Sincerely, i

Nf N ,i g David A. War Chainnan

References:

1. Georgia Power Company " Final Safety Analysis Report, Vogtle Electric Generating Plant Unit I and Unit 2," Volumes 1-33 and Amendments 1-17
2. U. S. Nuclear Regulatory Comission, " Safety Evaluation Report Related to the Operation of Vogtle Electric Generating Plant.

Units 1 and 2," USNRC Report NUREG-1137, dated June 1985

3. Written statement and addendum by W. F. Lawless dated July 19, 1985