ML20137H884
| ML20137H884 | |
| Person / Time | |
|---|---|
| Site: | 07100192 |
| Issue date: | 03/28/1997 |
| From: | Jesse Rollins VECTRA TECHNOLOGIES, INC. |
| To: | Shankman S NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| References | |
| JDR-97-020, JDR-97-20, NUDOCS 9704030140 | |
| Download: ML20137H884 (1) | |
Text
..
- _. =-
71-oli L V
i VECTRA March 28,1997 JDR-97-020 Ms. Susan Frant Shankman, Chief Transportation Safety and Inspection Branch Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 I
Subject:
Request for Response Schedule Extension
Reference:
- 1. NRC Demand for Information (DFI) Letter, Dated January 13,1997
- 2. NRC Inspection Report No. 71-0192/97, Dated March 6,1997
Dear Ms. Shankman:
VECTRA herewith requests an extension of the response due date for the Reference 2 i
Inspection Repon to April 11,1997, the same date for which our response to the DFI (Ref.1) is due. The need for our extension is based on the fact that the issues identified in the Inspection Report are interrelated to the DFI issues and, therefore, require concurrent response preparation.
7 i
Your timely consideration in responding to this request is appreciated. Should you have any related questions, please call me or Ray Fortney at 408-281-6000.
Sincerely, Jack D. Rollins Manager ofLicensing VECTRA Technologies, Inc.
1 cc:
Mr. Charles J. Haughney, Acting Director, NRC SFPO l
Mr. Timothy J. Kobetz, NRC SFPO t
i O
hj g 9704030140 970328 i
DR ADOCK 0710 2
g YECTRATechnologh. 'nc.
6203 Son ignocio Ave., Suite 100 Son Jow, CA 95119. Tel:(408) 629 9800 Fox:(408) 2814186 / (408)2814202