ML20137H843

From kanterella
Jump to navigation Jump to search
Application for Amends to Licenses NPF-2 & NPF-8,revising Note 9 of Tech Spec Table 4.3-1 to Require Clearing of Trip Signal Prior to P-9 Setpoint.Fee Paid
Date released: 05/30/2020 Download: ML20137H843


Proposed Tech Spec Changes to Note 9 of Table 4.3-1, Requiring Clearing of Trip Signal Prior to P-9 Setpoint
ML20137H873
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 11/22/1985
From:
ALABAMA POWER CO.
To:
References
Download: ML20137H873 (3)
Application for Amends to Licenses NPF-2 & NPF-8,revising Note 9 of Tech Spec Table 4.3-1 to Require Clearing of Trip Signal Prior to P-9 Setpoint.Fee Paid
ML20137H837
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 11/22/1985
From: Mcdonald R
ALABAMA POWER CO.
To: VARGA S A
Office of Nuclear Reactor Regulation
References
Download: ML20137H837 (3)