ML20137H254
| ML20137H254 | |
| Person / Time | |
|---|---|
| Issue date: | 08/20/1985 |
| From: | Stello V Committee To Review Generic Requirements |
| To: | Dircks W NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| References | |
| REF-GTECI-A-46, REF-GTECI-SC, TASK-A-46, TASK-OR NUDOCS 8508280234 | |
| Download: ML20137H254 (5) | |
Text
-.
-,. - - - - - ~.
_-.~.
^Nif **
pauog
.k UNITED STATES NUCLEAR REGULATORY COMMISSION s
T.
l wasHmorow, o. c. nosss
%...../
AUG 2 01985 I
,e r
f MEMORANDUM FOR:
William J. Dircks Executive Director for Operations FROM:
Victor Stello, Jr., Chaiman j
Comittee to Review Generic Requirements
SUBJECT:
MINUTES OF CRGR MEETING NUMBER 78 The Comittee to Review Generic Requirements (CRGR) met on Monday (, July 8,1985 from 12-6 p.m.
A list of attendees for this meeting is enclosed Enclosure 1).
1.
T. Speis (NRR) presented for CRGR review the proposed resolution of A-46,
" Seismic Qualification of Equipment in O sumarizes this matter (Category 2 Item)perating Plants.
l i
2.
B. Johnston (NRR) briefed the CRGR concerning updated recomendations on Fire Protection Policy and Program actions. Enclosure 3 sumarizes this j
matter (Category 2 item).
l 3.
F. Congel (NRR) briefed the CRGR concerning SRP 12.6 series pertaining to l
expansion of spent fuel storage pools. Enclosure 4 sumarizes this matter j
(Category 2 item).
i 4.
C. Serpan (RES) briefed the CRGR concerning agency activities in the development of NDE qualification and perfomance demonstration criteria. sumarizes this matter (Category 2 item).
5.
G. Arndt (RES) presented for CRGR review the proposed Revision of Appendix J (Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors) of 10 CFR Part 50 Enclosure 6 sumarizes this matter (Category 2 Item).
l 6.
J. Zudans (IE) presented for CRGR review, the proposed amendments to i
10 CFR 21. " Reporting of Defects and Noncompliance: and20CFR50.55(e),
l
" Reporting of Defects in Design and Construction." Enclosure 7 sumarizes j
this matter (Category 2 item).
Enclosures 2 through 7 contain predecisional information and therefore will not l
be released to the Public Document Room until the NRC has considered (in a l
l public forum) or decided the matters addressed by the enclosures.,
[
e t
t i
I t
ME
r.
4 l
AUG 2 01985 2-Questions concerning these meeting minutes should be referred to Walt Schwink (492-8639).
Original eigned by James H. Sniezek k[ Victor Stello, Jr., Chairman I
Comittee to Review Generic I
Requirements
Enclosures:
As Stated cc: Comission (5)
SECY Office Directors Regional Administrators CRGR Members G. Cunningham T. Speis W. Johnston F. Congel C. Serpan G. Arndt J. Zudans Distribution:
VStello JRoe R0GR Staff JHSniezek WLittle Central File RHernon EFox JPhilips JHenry RErickson ETriner JZwetzig FHebdon PDR(NRG/CRGR)
OFC :ROGR D
- CED R
..... : y NAME :JW ek
- S 3
......h........:............:............:............:............:...........
/\\ 85 DATE:7/9/
V
\\
OFFICIAL RECORD COPY
t o
i i
4 i
I 1
I i
LIST OF ATTENDEES CRGR MEETING NO. 78 July 8, 1985 1
CRGR MEMBERS V. Stello R. Bernero E. Jordan J. Scinto C. Seyfrit (for J. Heltemes)
R. Cunningham OTHERS 2
J. Sniezek J. Austin i
M. Taylor J. Zudans T. Cox C. Cameron J. Conran G. Lanik j
W. Brach C. Browr T. Speis M. Federline N. Anderson D. Kirkpatrick 1"
F. Schroeder F. Jape K. Kniel F. Maura l
T. Chang S. Rozak G. Bagchi S. Hare V. Benaroya D. Lurie i
B. Johnston F. Congel D. Notley O. Lynch B. Shields J. Muscara F. Rosa C. Z. Serpan 4
T. Wambach S. Block D. Muller J. Richardson G. Arndt J. Burns J. Shapaker J. Huang M. Taylor R. Hernan i
G. Arlotto 1
A. Tse S. Feld B. Richter e
C. A. Petraute J. Pulsipher i
i 1
.- -