Advises of Error in Amend 20 to CPPR-108 & CPPR-109 Re FSAR Concerning Paragraph 1.9.94.2 of Reg Guide 1.94 on Welding. Forwards marked-up Page 1.9-74b Indicating Deletion of Phrase.Error Will Be Corrected in Next General Amend
ML20137H069
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 01/08/1986
From: Bailey J
GEORGIA POWER CO.
To: Harold Denton, Youngblood B
Office of Nuclear Reactor Regulation
References
RTR-REGGD-01.094, RTR-REGGD-1.094 0051V, 51V, GN-773, NUDOCS 8601210428
Download: ML20137H069 (2)


Text

-_

s Georgia Power Company

, Project Management Route 2. Box 299A Waynesbors, Georgia 30830 Telephone 404 724-8114 404 554-9961 Southern Company Services, Inc.

Post Office Box 2625 Birmingham, Alabama 35202 Telephone 205 870-6011 Vogtle Project January 8, 1986 Director of Nuclear Reactor Regulation File: X7N00-20 Attention: Mr. B. J. Youngblood Log: GN-773 PWR Project Directorate #4 Division of PWR Licensing A U. S. Nuclear Regulatory Commission Washington, D.C. 20555 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PIANT - UNITS 1 AND 2 CORRECTION TO ERROR FSAR AMENDMENT NUMBER 20

Dear Mr. Denton:

The recently submitted Amendment Number 20 to the Vogtle Electric Generating Plant (VEGP) Final Safety Analysis Report (FSAR) contained an error in regard to Regulatory Guide 1.94. Paragraph 1.9.94.2, VEGP Position, clarification number 9 " Paragraph 7.5 Welding" included the phrase "of structural steel not in tension". This erroneously limits our commitment to use of the Visual Weld Acceptance Criteria (VWAC) by excluding those welds which are in tension.

This is not our intent.

Attached is a marked up copy of page 1.9-74b indicating the deletion of the phrase. We will correct this error in the next general amendment to the VEGP FSAR.

If you have any questions in this regard, please do not hesitate to contact me.

I urs truly, l

J. A. Bailey j

Project Licensing Manager I JAB /JLL/dla Attachment xc: M. A. Miller B. Jones, Esquire H. H. Gregory, III R. A. Thomas 4 G. Bockhold, Jr. T. Johnson L. T. Gucwa D. C. Teper L. Fowler W. C. Ramsey J. E. Joiner, Esquire Vogtle Project File )

B. W. Churchill, Esquire 1

{ i l i l 0051V B601210428 e60108 i

l PDR ADOCK 05000424PDR A

Y -

VEGP-FSAR-1

6. Paragraph 6.11, Inprocess Tests on Concrete and b, Reinforcing Steel This paragraph, Table B, requires that fly ash and pozzolans be checked for physical properties (ASTM i

C618) in accordance with ASTM C311 every 400 tons. _.3 VEGP specifications requires this testing to be performed every 1000 tons except for loss of ignition l20 i and sieve no. 325 which are performed every 200 tons. 17

7. Paragraph 6.12, Mechanical (Cadweld) Splice Testing

)

(6.12.2)

This paragraph requires visual inspection on completed splices shall be performed only after the splices have cooled to ambient temperatures. The VEGP specification does not require splices to be cooled to ambient temperature prior to inspection. Cadwelds are l20 inspected after they have cooled such that it will allow the inspection to be performed without any danger of burns. '

i

8. Paragraph 6.12, Mechanical (Cadweld) Splice Testing (6.12.4)

This paragraph, Item 2.C, requires that one splice, i either production or sister splice, be tested for the next and subsequent units of 33 splices. VEGP ,

i specifications require three test splices for the next and subsequent units of 100 splices. I

9. Paragraph 7.5, Welding l20 l I

This paragraph requires inspection of structural steel '

welding to be performed in accordance with the provisions of Section 6 of the AWS D1.1. Visual welding inspection ef :tructurni :t::1 net- in tencica-performed on or after December 2, 1985 is in accordance ,

with the Visual Weld Acceptance Criteria (VWAC) for Structural Welding at Nuclear Power Plants, NCIG-01, Revision 2, prepared by the Nuclear Construction Issues 17

{ fl Group (NCIG) and accepted by the NRC in their letter to the NCIG dated June 26, 1985. For inspection performed prior to December 2, 1985, the visual acceptance criteria is in accordance with AWS D1.1-75 with the clarifications and modifications described below. f.)

In order to designate the specific set of visual acceptance criteria applicable for a weld, structural steel weld joints within the jurisdication of AWS D1.1 are classified into the following categories:

Amend. 17 7/85 1.9-74b Amend. 20 12/85 I