Summary of 850808 Briefing W/Doe,Epri,Ge,Rockwell Intl Corp, Westinghouse & BNL Re large-scale Prototype Breeder Response to Station Blackout Event.Agenda Encl
ML20137G428
Person / Time
Issue date: 08/20/1985
From: King T
Office of Nuclear Reactor Regulation
To: Speis T
Office of Nuclear Reactor Regulation
References
REF-GTECI-A-44, REF-GTECI-EL, TASK-A-44, TASK-OR NUDOCS 8508270295
Download: ML20137G428 (6)


Text

.

o August 20, 1985 l

MEMORANDUM FOR: Themis P. Speis, Director, Division of Safety Technology, Office of Nuclear Reactor Regulation FROM:

Thomas L. King, Chief, ARG, Division of Safety Technology, Office of Nuclear Reactor Regulation

SUBJECT:

SUMMARY

OF BRIEFING ON LMR RESPONSE TO A STATION BLACK 0UT EVENT On August 8, 1985 DOE and EPRI personnel provided us with a briefing on how LMRs intend to accommodate a station blackout. The requirements and design criteria to be applied to address the station blackout issue were presented as well as plant response to a station blackout event using the large Scale Prototype Breeder (LSPB) design as an example. The agenda and list of attendees are enclosed. Copies of the handouts from the briefing are available in my office.

Significant points from the meeting were:

1)

The criteria to be applied to the LMR designs are consistent with the requirements that have been developed under USI-A-44 " Station Blackout" for LWRs.

2)

The plant response to a station blackout event is intended to maintain coolable core geometry. However, loss of plant lifetime is permitted by the. designers in the event of a station blackout event.

3)

LMRs, due to their enhanced natural convection and leak tight, low pressure system properties have a high potential of being able to withstand a station blackout of long duration.

.If and when we commit to further ir.teractions in the LMR area it is DOE's intent to formally submit a generic report on LMR station blackout for our review.

If you would like to see the handouts from the meeting or discuss any of the above further please let me know.

/y

<,\\

B508270295 050020 Thomas L. King, Chief

)D'l PDR GTECI GELA Advanced Reactors Group m /'

Division of Safety Technology Office of Nuclear Reactor Regulation

Enclosures:

DIST: Central File ARG r/f A. Rubin T. King s/ k As stated NRC PDR DST /CHRON M. El-Zeftawy ARG Staff P Ms W

..ARGIDST!N.RR c,,ic.,..g.

.u.. o

. 8/f/,85,,,,,..

.m>

OFFICIAL RECORD COPY w.o

-n.w t.a: sow peoooomacueno

Enclosure Larg4 scale Prototype Breeder dos /EPRI Meeting ylth NRC Phillips Building - Room P110 August 8, 1985 AGENDA Objechives submission of Safety Discussion Report and station Blackout safety Report Presentation subiect ResDonsibility 9:00 -

9:30 Introduction CoMO SDR Overview CoMO 9:30 - 12:00 station Blackout Safety Report RI/3

- Background and overall Requirements E

- Criteria 3

- Require.d Plant Functions including E

Environmental and Monitoring Requirements

  • - Evaluation of Plant Response RI ass SHRs Fuel Handling and Storage

- Summary 3

- Conclusions 3

- Agreements Requested from NRC 3

12:00 -

1:00 LUNCH 1:00 -

3:30 General Licensing Discussions (DOE /CoM0/NRC only)

/

9 9

0

.g

d Enclosure DOE /EPRI MEETING WITH NRC LARGE SCALE PROTOTYPE BREEDER AUGUST 8, 1985 ATTENDEES ORGANIZATION S. Gray EPRI/COMO E. Gray EPRI/COMO T. King NRC/NRR S. Sands NRC/NRR A. Rubin NRC/NRR T. McIntosh DOE /NE G. Sherwood DOE /NE W. Kwant General Electric J. Brunings Rockwell International J. Peoples Westinghouse AESD B. Horak BNL I

/;// D

/ L //

2

,gf h

UNITED STATES g'

',p, NUCLEAR REGULATORY COMMISSION L-

.l WASHINGTON, D. C. 20555 k,.v../

August 20, 1985 MEMORANDUM FOR:

Themis P. Speis, Director, Division of Safety Technology, Office of Nuclear Reactor Regulation FROM:

Thomas L. King, Chief, ARG, Division of Safety Technology, Office of Nuclear Reactor Regulation

SUBJECT:

SUMMARY

OF BRIEFING ON LMR RESPONSE TO A STATION BLACKOUT EVENT On August 8, 1985 00E and EPRI personnel provided us with a briefing on how LMRs intend to accommodate a station blackout. The requirements and design criteria to be applied to address the station blackout issue were presented as well as plant response to a station blackout event using the Large Scale Prototype Breeder (LSPB) design as an example. The agenda and list of attendees are enclosed. Copies of the handouts from the briefing are available in my office.

Significant points from the meeting were:

1)

The criteria to be applied to the LMR designs are consistent with the requirements that have been developed under USI-A-44 " Station Blackout" for LWRs.

2)

The plant response to a station blackout event is intended to maintair coolable core geometry. However, loss of plant lifetime is permitted by the designers in the event of a station blackout event.

3)

LMRs, due to their enhanced natural convection and leak tight, low pressure system properties have a high potential of being able to withstand a station blackout of long duration.

If and when we commit to further interactions in the LMR area it is DOE's intent to formally submit a generic report on LMR station blackout for our review.

If you would like to see the handouts from the meeting or discuss any of the above further please let me know.

M A

Thomas L. King, Chief Advanced Reactors Group Division of Safety Technology Office of Nuclear Reactor Regulation

Enclosures:

As stated

~.

Enclosure Larg4 scale Prototype Breeder DOB/EPRI Meeting,With MRC Phillips Building - Room P110 August 8, 1985 e

AGENDA Objec'tives submission of Safety Discussion Report and Station Blackout Safety Report Presentation Eubiect Responsibility 9:00 -

9:30 Introduction CoMO SDR Overview CoM0 9:30 - 12:00 Station Blackout safety Report RI/W

- Background and Overall Requirements W

- Criteria w

- Required Plant Functions including W

Environmental and Monitoring Requirements

'- Evaluation of Plant Response RI RSS SHRB Fuel Mandling and Storage

- Summary W

- Conclusions W

- Agreements Requested from NRC W

12:00 -

1:00 LUNCH 1:00 -

3:30 General Licensing Discussions (DOE /CoM0/NRC only) e M

~

r

p.,

L1

4 Enclosure l

DOE /EPRI MEETING WITH NRC LARGE SCALE PROTOTYPE BREEDER AUGUST 8, 1985 r

ATTENDEES ORGANIZATION S. Gray EPRI/COMO l

E. Gray EPRI/COMO T. King NRC/NRR S. Sands NRC/NRR A. Rubin NRC/NRR T. McIntosh DOE /NE G. Sherwood DOE /NE W. Kwant General Electric J. Brunings Rockwell International

'd. Peoples Westinghouse AESD i

B. Horak BNL i

[

i l

i I

-.