ML20137F602
| ML20137F602 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 08/13/1985 |
| From: | Edelman M CLEVELAND ELECTRIC ILLUMINATING CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| PY-CEI-OIE-0090, PY-CEI-OIE-90, NUDOCS 8508270015 | |
| Download: ML20137F602 (2) | |
Text
-_
1 1
l I
I THE CLEVELAND ELECTRIC ILLUMIN ATING COMPANY l
P.O. BOX 97 N PERRY. OHIO 44081 m T EL EPHON E (216) 259-37 37 m ADDRESS-10 CENTER RO AD Semng The Best Location in the Nation Murray R. Edelman MANAGER EIM NUCLE AR ENGINE t RING g glU s c4 DEPARTMENT 4 ?. Q August 13, 1985 -
\\ %[
PY-CEI/01E-0090 L T q'y
%u mrc..
E.
E ILM Mr. James G. Keppler Regional Administrator Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Organization Change
Dear Mr. Keppler:
22, 1985, the' Cleveland Electric Illuminating Company Effective July reorganized the plant management staff for 1. ry Nuclear Power Plant Maintenance Section, Perry by adding two Section General Supervisors.
Plant Operations Department was divided into Material Services Section and Maintenance Section, and Technical Section, Perry Plant Technical Department was divided into Instrumentation and Controls Section and The remaining sections in both departments are not Technical Section.
affected.
Materials Services Section reports to Mr. J. M. Lastovka, who is now responsible for procuring and maintaining the plant stores inventory of spare parts and supplies, and for supervising activities of the plant helper Maintenance Section remains under Mr. D. J. Takacs, who is responsible for planning and executing maintenance, repair and overhaul work on plant crew.
electrical and mechanical systems.
Instrumentation and Controls Section reports to Mr. R. P. Jadgehew, who is now responsible for maintenance, calibration and repair of plant instrumentation Technical Section and controls, including measuring and test equipment.
remains under Mr. W. R. Kanda, who is responsible for technical support and services related to reactor technology, plant computer systems, monitoring Mr. Lastovka and Mr.
plant performance, and equipment and system testing.
Takacs report directly to the Manager, Perry Plant Operations Department.
Mr. Jadgehew and Mr. Kanda report to the Technical Superintendent, who reports to the Manager, Perry Plant Technical Department.
AUG 19 N I
B508270015 850813 0 DR ADOCK 0500
r--
-Mr. James G. Keppler August 13, 1985 PY-CEI/01E-0090 L
\\
This organizational change will be reflected in future revisions to our quality assurance program, the Final Safety Analysis Report and key plant procedures.
Please call if you have any questions.
Very truly yours, Murray R. Edelma Vice President Nuclear Group MRE:njc cc:
Mr. J. A. Grobe, USNRC Site Mr. D. Keating, USNRC Site Mr. C. E. Norelins, USNRC Region III Mr. R. L. Spessard, USNRC Region III Mr. J. Stefano, USNRC Washington (2)