NPDES Noncompliance Notification:On 850724,Outfall 002 Ph & Flow Exceeded Specs.Caused by Inability to Isolate Pond During Upgrading of Banks.Release Terminated on 850724
ML20137F592
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 08/15/1985
From: Andrews R
OMAHA PUBLIC POWER DISTRICT
To: Martin R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
LIC-85-369, NUDOCS 8508270010
Download: ML20137F592 (3)


Text

,

Omaha Public Power District 1623 Harney Omaha. Nebraska 68102 402/536-4000 August 15, 1985 LIC-85-369

$ @ $ [} Y i

Mr. Robert D. Martin Regional Administrator U. S. fluclear Regulatory Comission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011

Reference:

Docket flo. 50-285

Dear Mr. flartin:

f4PDES Pennit Violation The Omaha Public Power District, pursuant to an agreement made by letter dated April 15, 1983, provides the attached information regarding non-compliance with the Fort Calhoun Station flPDES Pennit flumber f4E 0000418.

A copy is also being provided to the Director, Office of fluclear Reactor Regulation.

Sincerely, l

!NdV l

R. L. Andrews l

Division Manager fiuclear Production RLA/TPM/dao Attachments cc:

Mr. Harold R. Denton, Director l

Office of fluclear Reactor Regulation U. S. fluclear Regulatory Commission Washington, DC 20555 LeBoeuf, Lamb, Leiby & MacRae 1333 flew Hampshire Avenue, fi.W.

l Washington, DC 20036 Mr. E. G. Tourigny,flRC Project Manager Mr. L. A. Yandell, f4RC Senior Resident Inspector ifr. T. V. Grove 850827001o 850915 0500g6 PDH ADOCK f;

pg 7,c.

s I

+,

y, s i,*.4 i f nph iymen h t oti si Opportunity

=

== x

-[.

a.

a

'W,

.[:l%

Omaha Public Power District 1623 Harney Omaha, Nebraska 68102 402/536 4000 August 5, 1985 85-QARA-106 l

Mr. Jay D. Ringenberg Section Head Permits & Compliance Section Water Quality Division State of Nebraska Department of Environmental Control Box 94877, State llouse Station Lincoln, NE 68509-4877 RE:

NPDES Noncompliance Report for the Fort Calhoun Power Station

Dear Mr. Ringenberg:

Please find enclosed a NPDES Noncompliance Report for the Fort Calhoun Power Station from a sample taken on July 24, 1985.

This violation occurred during upgrade work on both cells of the chemical equalization and decantation holding basins with the banks of both cells being reshaped and lined with crushed rock.

It was during this work that the plant staff was unable to isolate the west cell of the chemical ponds which resulted in a pH violation.

This work will be concluded shortly with no further violations anticipated.

Verbal notification was made to Mr. Dick Varner of the DEC on August 2, 1985.

If you have any questions or comments on any of the above, please contact Tim Grove (536-4659) or myself (536-4501).

I Sincerely,

( hd% fit [N 7

4..,,

F.

hurtell J

Division Manager Quality Assurance & Regulatory Affairs FAT /TVG:jbk Enclosure f meioumen,tgrg;',opponunau iwa

FI D

[

hERMITEE liATE:

]

wterms o rtrcarttar er t uvirorutrisct corete t

.b" J

J tanon:t rotturaer oisci :ct etiviratiou cvstra o

n,.D / /l UON COMPLIANCE REPORT 18-Chaha Public Pcwer District Fort Calhcun Station TIIIS REPORT MUST BE FILED W1IEN TIIE LABORA'IDRY j

TEST EESULTS FROM NJY EFFLUDIT SAMPLE EXCEEDS Date TI!E LIMITS IN YOUR NPDES DISCIARGE PERMIT.

UE0003418 8 i5 0 i 7 23 4 Sample r!a?a T so.*anf 2 1gAa t.'s ris DaT Taken INSTRUCTIONS FOR QMPIETIO!! ARE ON BACK.

l i

QUANTITY (IC/ DAT)

CetectNTitATIUM (MC/L) r87I2t THCY r.PAM!TER SAMFLE 1

1 ME A7f E.YE Fl42 tttTt Uls tT1 AvtRAct tRIttttt tesI!TS as,atyg gg s m ett3 FT* **T

[ \\,

4/]

Coseti tN REFeeffD F?RMtT CceetT3Cao

. m ert.

Ftrauf f Ct5sDifien

/_\\

9.1 G

Std.

\\/

n, ir Ph.

C=if u==

/\\

6.0 9.0 Units /\\-

rLOu

,,mn,

>.179 MGD X

X cascription and Outfall 002-Water Treatment Plant.

Both cells of the chemical ponds were upgraded wTth the banks being cause o',

reshaped and lined with crushed rock. During this work the plant staff was unable to isolate the west pond which resulted in a pH violation. The release was terminated at 1415 on 7/24/85.

,lon Coryliance.

gf_..

c e, r..cir.t n.Cm,e ernen vmr er erno=

e.rt

, u, n.,, r...,,,,. rm,,,., m., To v.,,

d MnM//)

Y

, ern i,, ii..,,.,,, i t i.... r., i,,,r 9

Divisicn F.anager Thurtell, Frank A.

CA & Reg. Affairs 3 l5 018 0 12 or cr "r ra~' r- = an ur seca tam >=nP,si=n n er ru-ird ue5 Tin nn, 1:.e

,u.

=

en

' S "d. r= " r. aa ***^ " -

ernrea na aun-urra aan

_. _., _