ML20137E061

From kanterella
Jump to navigation Jump to search
Requests That Replacement of Pressurizer Relief Tank Sightglass Proposed in LER 370/85-10 Be Deleted.Anticipated Deletion of Upper Head Injection Sys as Proposed in Makes Sightglass Replacement Unnecessary
ML20137E061
Person / Time
Site: Mcguire
Issue date: 08/20/1985
From: Tucker H
DUKE POWER CO.
To: Adensam E, Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8508230122
Download: ML20137E061 (1)


Text

_. - - _ _. __________ __ - ____ _ ____

Dune POWER GOMPANY P.O. HO X 3 318 0 CHAM!JYTTE, N.C. 28242 IIAL 11. TIJCKER m ernown VEm Panerna.,

(yo.g) 073-gfM31 August 20, 1985

. uo..

m Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention:

Ms. E. G. Adensam, Chief Licensing Branch No. 4

Subject:

McGuire Nuclear Station Docket Nos. 50-369 and 50-370 Commitment to Upgrade Sightglass

Dear Mr. Denton:

In Licensee Event Report 370/85-10 dated June 26, 1985, Duke Power Company stated that the Pressurizer Relief Tank sightglass on both units would be replaced with a sightglass that has higher pressure and temperature limits.

Due to the anticipated deletion of the Upper Head Injection (UHI) System (proposed in my letter of May 9, 1985), the sightglass no longer needs to be upgraded. This commitment should therefore be deleted (contingent upon approval of UHI removal).

Very truly yours, h'

W Hal B. Tucker JBD/hrp cc:

Dr. J. Nelson Grace, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. W. T. Orders Senior Resident Inspector McGuire Nuclear Station 0508230122 850920 PDR ADOCK 05000370

\\

S PDR

\\

I I D i

-