b UNIVERSITY OF VIRGINIA r A, 1 DEPARTAIENT OF NUCLEAR ENGINEERING AND ENGINEERING PHYSICS NUCLEAR REACTOR FACILITY III J
SCHOOL OF ENGINEERING AND APPLIED SCIENCE L
r CHARLOTTESVILLE, VA 22901 u
a November 18, 1985 Telephone: 804-924-7136 Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Attention: Mr. Cecil 0. Thomas
Dear Mr. Thomas:
During a recent NRC inspection of our Reactor Facility in the operations area, it was discovered that several unplanned shutdowns occurring on our 2 MW UVAR reactor, License No. R-66, during the calendar year 1984 had been inadvertently omitted from our 1986 annual report, upon transcription from the reactor logbook. We are therefore submitting an addendum to our 1984 annual report listing all of our unplanned shutdowns and corrective actions taken.
It should be pointed out that the shutdown frequency registered is common to research reactors. Generally, the scrams have absolutely no safety implications for the operation of the reactor, resulting from building power failures, electronic noise, etc.
In the addendum, the shutdowns that were inadvertently left out are marked Wft
- a. asterisk.
7 Sin T{b4p~
m R.. Mulder, Director UVA Reactor Facility cc: Office of Inspection & Enforcement Region II Sworn to c.d :d~rNj Mfm ma this Atlanta, GA
~
Mr. Donald J. Burke Witnm >. :... -
f,.. e,.
Surry Nuclear Power Station N { [g Resident Inspector P:try PA!c MyCommusionExpires fk g OS11270185 851118 F2DR ADOCK 0500 2