UNITED STATES y
NUCLEAR REGULATORY COMMISSION
)
y
't 73 l
- i.,.j ( j REGION til j
l .,g)' ;g soi wARRENVILLE ROAD uSLE. ILLINOIS 60532-4351 January 23, 199'/
l 4
~
~
SIGNIFICANT LICENSEE MEETING NOTES THIS MEETING WAS OPEN TO PUBLIC ATTENDANCE l
Name of Licensee:
Commonwealth Edison Company Name of Facility:
Zion Nuclear Power Sta g. g iqg I g g
9 i
Docket Nos.
50-295: 50-304 PUBLIC DOCUMENI HL 1
Date of Meeting:
January 3. 1997 l
Location of Meeting:
NRC Region III 801 Warrenville Road 4
Lisle, Illinois Purpose of Meeting:
To discuss the findings from the licensee l
l contracted Independent-Safety Assessment (ISA) l and the effects of the recently identified l
i technical issue involving degraded containment paint coatings on the readiness for the restart of Unit 2.
Meeting notes are enclosed.
Approved By:
V
/
M. L. Dapas. Chief
- /'
Reactor Projects Branch 2 Enclos0re:
Meeting Notes See Attached Distribution i
l
.I
/Q Nb i
9703260198 970123 PDR ADOCK 05000295 P
PDR 4
~
Significant Licensee Meeting Notes Sionificant Licensee Meeting Distribution H. L. Thompson, Jr.. Acting Executive Director for Operations A. C. Thadani Associate Director for Technical Review. NRR J. W. Roe. Director. Division of Reactor Projects III/IV. NRR R. P. Zimmerman. Associlite Director for Projects. NRR Chief.- PIPB. NRR Region III Coordinator. OEDO Project Directorate, NRR Project Manager. Project Directorate. NRR J. L. Caldwell. Director. Division of Reactor Projects. RIII J. A. Grobe. Deputy Director. Division of Reactor Projects. RIII C. D. Pederson Director. Division of Nuclear Materials Safety. RIII R. J. Caniano. Deputy Director. Division of Nuclear Materials Safety. RIII G. E. Grant. Director. Division of Reactor Safety. RIII M. N. Leach. Acting Deputy Director. Division of Reactor Safety. RIII M. A. Ring. Chief. Lead Engineers. Division of Reactor Safety. RIII J. L. Lynch. Acting Regional State Liaison Officer. RIII PMNS (E-Mail)
RIII Public Affairs (E-Mail) 4
l Q
l Enclosure NRC/Commonwe h Edison January 3,1997 Public Meeting Notes Meeting Purpose - To discuss the findings from the licensee contracted technical i n ue involving degraded containment pai for the re art of Unit 2.
Meeting notes are enclosed.
NRC Par ipants Bill Feach. Regional. Administrator Jamo a <,11, Division Director. Division of Reactor Projects.
Marc Dapas, ranch Chief. Division of Reactor Projects. Branch 2 Ron Gar
_. Branch Chief. Engineering Specialists Branch 2 7
Eugene Cobey. Zion Resident inspectorve-tills. Project Engineer. Div Commonwealth Edison Participants John Mueller. Zion Site Vice-President Dennis Farrar. Commonwealth Edison Nuclear Regulatory Services Manager Discussion on Zion Containment Coatina Issue
(
The meeting began with a discussion on the recently identified issue concerning containment coatings. A summary of the discussion follows:
lhe resident inspectors recently identified conditions of peeling paint in the Unit 2 containment.
the Final Safety Analysis Report regarding containment coati i
t The NRC expressed concern with the use of unqualifie'd paint in pontainment.
discussed the need to resolve these issues before startup of Unit 2.
The NRC NRC's safety concern is that the paint could be transported to the containment The sump and clog emergency core cooling system strainers.
l The NRC also expressed concern that degraded paint coatings may exist in the Unit 1 containment.
The NRC emphasized the importance of the licensee ensuring that operability and safety evaluations be conducted to i
address the degraded conditions with the Unit 1 and Unit 2 containments in l
accordance with guidance in Generic letter 91-18 and requirements contained in 10 CFR Part 5'0.59.
J The licensee stated that opentors were currently reducing power to allow i
inspection of the Unit 1 containment since the operability of Unit I was an provide the appropriate level of assurance that safety sys to nperat e
O o
NRC/ Comed Meeting Notes,
Discussion on Licensee Resoonse to the ISA Findinos The licensee discussed the purpose of the ISA and why. in light of the ISA findings. licensee management remained confident that Unit 2 was ready for restart.
The licensee expressed confidence in the new management team's ability to effect needed changes in licensee aerformance based upon the results of various self-assessments that had aeen recently completed and a review of performance indicator data for the past few months which showed improvement in several areas. including operator workarounds, corrective maintenance work, temporary alterations, configuration control. surveillance testing, and procedure quality. The licensee stated that the initiatives to implement the Plant Operations Review Committee concept and unitize the Operations and Maintenance organizations were also keys to improved performance.
Regarding the ISA, the licensee indicated that the team's charter was to perform a historical review of performance at Zion to determine why performance was cyclic and the reasons for the inability to fix problems, as well as to ensure the licensee was focusing on the correct issues.
The licensee indicated that the ISA served to reinforce to the staff why performance must change at Zion.
The licensee further indicated that the ISA did not find any new issues which had not already been addressed in NRC inspection reports or other assessments of licensee performance.
The NRC commented that since a written report had not yet been issued. it was difficult to verify that the licensee has ) laced the ISA isSJes in the proper context without knowing the specifics whici formed the basis for the team s conclusions.
The licensee indicated that since the ISA was a historical review of licensee performance, the team's findings do not reflect the results of some of the recent improvement initiatives at Zion station.
The licensee expressed confidence in the staff at Zion to implement necessary action alans and to focus attention on improvement initiatives while both Unit 1 and Jnit 2 were operating.
Licensee Actions Subseauent to Meetina On Januar'y 16, 1997, the licensee announced an extension to the Unit 2 refueling outage to address recently identified technical concerns (including the containment coatings) and to perform more comprehensive reviews to ensure the unit is ready for restart.
(See Preliminary Notification PN-397003)
.