ML20137C884
ML20137C884 | |
Person / Time | |
---|---|
Issue date: | 11/08/1985 |
From: | Hawkins E, Wastler S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
References | |
REF-WM-64 NUDOCS 8511260651 | |
Download: ML20137C884 (3) | |
Text
o ~
M-bb DISTRIBUTION Docket File WM-181 PDR/DCS DBangart, RIV WM-181/SLW/85/11/04/0 SWastler 1 URF0 r/f NOV 0 S 1985 URF0:SLW Docket No. WM.181 0400181301E MEMORANDUM FOR: Docket File No. WM-181 FROM: Sandra L. Wastler, Project Manager Licensing Branch 1 Uranium Recovery Field Office, Region IV
SUBJECT:
MEETING MINUTES - NOVEMBER 1, 1985 MEETING BETWEEN URF0, DOE AND TAC ON LAKEVIEW, OREGON UMTRAP SITE RAP, PSCR AND DSCR A meeting was held at the Uranium Recovery Field Office (URFO) in Denver, Colorado, on November 1, 1985, between URF0, DOE and the TAC (Jacobs-Weston) to discuss URFO's comments on the final RAP, PSCR and DSCR for the Lakeview, Oregon UMTRAP site. At the outset of the meeting, URF0 informed DOE that the NRC could not concur in the final RAP. The URF0 review of the RAP and DSCR indicated insufficient information in the technical areas of ground water and surface water hydrology, geology and seismology. The URF0 staff discussed their comments in these areas in detail with DOE and the TAC, as well as comrents on specific details in the areas of radiation protection and geotechnical engineering. URF0 also indicated that nany of the coments had been made by URF0 previously, but on draf t versions of the same documents, responses were incomplete or inadequate. URF0 will transmit the comments on the RAP and DSCR by November 8, 1985. URFO's PSCR comments would be slightly delayed to complete the ground-water review.
In addition. 00E, TAC and URF0 agreed to use the Title !! Ground Water Standards for design of the disposal site at Lakeview until such time as the EPA re. issues the Title i standards. The Title I standards were set aside by the 10th Circuit U.S. Court of Appeals' decision of
$FC : : .h : : :
.....:............:.......... e.P.............:............:............:............:...........
%AME : : : : : : :
PATE 85/11/08 : : : : : :
0511260651 851108 PDR WASTE WPt-64 PDft
WM-181/SLW/85/11/04/0 2- NOV 0 81985 September 03, 1985. No action will be taken regarding ground-water cleanup standards (if any) at the mill site. Any decision will be deferred until EPA issues revised Title I standards, r -
lD Sandra L. Wastler, Project Manager Licensing Branch 1 Uranium Recovery Field Office or tc'r -' v'.- . , f Region IV r.n u a y, t., ,a Approved by:
Edward F. Hawkins, Chief Licensing Branch 1 Uranium Recovery Field Office, Region IV 0F u.
- URfD URF0
. . . . . : . 3. y .i . . . ...:....... L:............:............:............:............:...........
EHawkins NAME :swM{sr/.kv :
.....:...........:....77....:............:............:.........................:...........
DATE :85/11/08 : fjg/13 :
-