Notifies of Revised Membership & Quorum Size of Station Operations Review Committee to Enhance Operational Effectiveness & Respond to Questions Raised by Nrc.Rev Will Be Included in Amend 14 to FSAR
ML20137C659
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 01/14/1986
From: Corbin McNeil
Public Service Enterprise Group
To: Adensam E
Office of Nuclear Reactor Regulation
References
NUDOCS 8601160370
Download: ML20137C659 (4)


Text

.e 9

Pubhc Service Electric and Gas Cornpany Corbin A. McNeill, Jr.

Public Service Electric and Gas Company P.O. Box 236, Hancocks Bndge, NJ 08038 609339-4800 Vice President -

Nuclear January 14, 1986 Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission 1920 Norfolk Avenue Bethesda, Maryland 20814 Attention:

Ms. Elinor Adensam, Director Project Directorate 3 Division of BWR Licensing

Dear Ms. Adensam:

STATION OPERATIONS REVIEW COMMITTEE MEMBERSHIP HOPE CREEK GENERATING STATION DOCKET NO. 50-354 Public Service Electric and Gas Company (PSE&G) has revised the membership and quorum size of the Hope Creek Generating Station (HCGS) Station Operations Review Committee (SORC) to enhance operational effectiveness and to respond to questions raised by members of the Nuclear Regulatory Commission (NRC).

These revisions to the HCGS Final Safety Analysis Report (FSAR) will be included in Amendment 14 while the necessary changes to the Technical Specifications will be addressed separately.

Should you have any questions on the subject filing, do not hesitate to call us.

Sincerely,

\\

Y 8601160370 860114 PDR ADOCK 05000354 3 1 A

PDR t-

- 9 s

Director of Nuclear 2

1-14-86 Reactor Regulation Attachment

=

C D.H. Wagner USNRC_ Licensing Project Manager R.W. Borchardt USNRC' Senior Resident Inspector J

9 I

i.

r

,ee-

,.-m-,m m,

-,-,,a-,

em-

-.-, - -e,,-

- = -

~

m

-.s

--+-4~,v ps n:m w-r v

e,.

HCGS FSAR 11/25 Its primary responsibility is to consider potentially significant nuclear and radiation safety issues and related management matters from a progammatic and policy level viewpoint and advise the Vice President - Nuclear.

13.4.1 STATION OPERATIONS REVIEW COMMITTEE The Station Operations Review Committee (SORC) will be established and functional before the initial fuel loading.

Its purpose, throughout the life of the plant, is to advise the General Manager - Hope Creek Operations on all matters related to nuclear safety by reviewing plant operations, procedures, and tests that have nuclear. safety significance.

13.4.1.1 Orcanization Membership of the SORC will consist of, but not be limited to, the following:

a.

Chairman.- General Manager - Hope Creek Operations f,

b.

Members:

  • 1.

..;;istant C;ncral Managcr Vice Chaicaan JL}f.

Technical Manager - Vice Chairman 2.j[.

Operations Manager - Vice Chairman i

J[.

Maintenance Manager

$l.

Radiation Protection / Chemistry Manager l

j' f.

Opcrating Engincer-l

^ 7.

Maintenance Enginecr-l 5](.

Instrument and Control Engineer l

h 13.4-2 Amendment 13 e

-V

-h^

-~-"-N

HCGS FSAR 11/85

/

6 Che:r.istry Engineer or fhdM frofec/rk 61c lNe# l

} ::.

Tcchnical Engineer l

} 11.

Radiction Prctectier Engineer l

} 12.

Scnior h'uclcar Chift Super"iecr l

7.

EySTGm3 EMSW On-Site Saf ety Review Engineer [2 26SCA/66 l

13.4.1.1.1 Alternates All alternate members shall be appointed in writing by the Chairman to serve on a temporary basis.

13.4.1.1.2 Ouorum A quorum of the SORC shall consist of the Chairman or his 1

desionated alternate andfii cc,# members including alternates.

However, no more than two alternates shall participate as voting members in SORC activities at any one time.

13.4.1.2 Meetings The SORC will meet at least once per calendar month and as convened by the Chairman or Vice Chairman.

Minutes of all formal meetings shall be maintained.

Copies of minutes from SORC meetings are sent to the Manager - Off-Site Review, the General Manager - Nuclear Safety Review and the Vice President - Nuclear.

13.4.1.3 Responsibility The SORC.is responsible for the following duties:

a.

Review of: (1) Station Administrative Procedures and changes thereto; and (2) Newly created procedures or changes to existing procedures that involve a significant safety issue.