ML20137B485

From kanterella
Jump to navigation Jump to search
Forwards Rev 14 to Security Force Training & Qualification Plan,Incorporating Changing Classification of Training & Qualification Plan from Safeguards to 10CFR2.790. Rev Withheld (Ref 10CFR2.790(b)(1))
ML20137B485
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 03/14/1997
From: Hill W
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9703210345
Download: ML20137B485 (2)


Text

-

Northem States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401 1927 Telephone (612) 330-5500 SAFEGUARDS INFORMATION March 14,1997 10 CFR Part 50 Section 50.54(p)

U S Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Submission of Revision 14 to the Monticello Nuclear Generating Plant Security Force Trainina and Qualification Plan Pursuant to 10 CFR Part 50, Section 50.54(p), we are submitting four copies of Revision 14 to the Monticello Security Force Training and Qualification (T&O) Plan. This revision incorporates changing the classification of the T&Q Plan from " Safeguards" to "10CFR2.790".

This letter also serves as an application to " withhold from public disclosure" this T&Q Plan as described in 10CFR2.790(b)(1). This request is based on 10CFR2.790(d)(1) as this plan is associated with the security of the facility but is not safeguards.

Because this plan has been considered safeguards, and the NRC has not had an opportunity to review this application for 10CFR2.790 status, the attached document is marked as safeguards material and must be treated as such until downgraded. We plan to downgrade the plan to 10CFR2.790 on July 1,1997, therefore we request approval of this application by that time. At that time you will be sent a new copy of this plan for your records, without the safeguards markings, and you will be asked to destroy this copy.

Until the application discussed above is approved, this revision contains Safeguards Information as identified by the Commission in 10 CFR Part 73, Section 73.21. This submittal should not be made available for public inspection and should not be placed in the public document room.

Please contact Lonnie Wilkerson at (612) 295-1321 if you have any questions related to this submittal.

ff batk Y

William J. Hill Plant Manager 1

Monticello Nuclear Generating Plant

)

SAFEGUARDS INFORMATION i

When Separated from Enclosures, I

Handle This Document as Decontrolled

~

f I J.

,n 9703210345 970314 ljll,]Kl-ll*ll'@l']'l$IlE]

PDR ADOCK 05000263 F

PDR

~

J

SAFEGUARDS INFORMATION 4

i c: Regional Administrator-Ill, NRC (w/ 2 copies)

NRR Project Mgr, NRC (transmittal letter only) i NRC Resident inspector (transmittal letter only)

J Silberg (transmittalletter only)

Enclosure:

Monticello Security Force Training and Qualification Plan Rev 14 When Separated from Enclosures, Handle This Document as Decontrolled 1

SAFEGUARDS INFORMATION