Monthly Operating Repts for Dec 1985
ML20137B345
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 12/31/1985
From: Austin G, Pliml G
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
0505A, 1052T, 505A, NUDOCS 8601150274
Download: ML20137B345 (12)


Text

_

OPERATING DATA REPORT DOCKET NO. 30 J95 DATE #4 e/ 07 2

COMPLETED BY 6en4,' Bushis TELEPHONE M #88'/

OPERATING STATUS I'#

O

  1. ^
1. Unit Nune:
2. Reporting Perled: mo #5 /2 w ~70 JW & /2 3/

3##0

3. Licemoed ThenmalPower (MWt):

'##6

4. Nameplete Rating (Gross MWe):

'd V#

s. Design Electrieel Rating (Not MWe):

/o/5

6. Mawa=== dew Cepecity (Grose MWe):

/dd

7. Mani===a DependeMe Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasono:

A/A

\\

l

9. Power Level To Which Restricted,If An Net MWe)-

1

10. Rassene For Restrictione.lf Any-l l

Die Month Vr.-to Date Cumeistive WI'.5

[7/ed,O

/dB6,o f

O

11. Housein Reporting Period 7/V.

J2/, a 73, 7//,, f 1

12. Neuber Of Moore Reactor Wee Critical 6, O D, O o2.62/.F

/

13. Reeseer Rassen shutdown Howe

/oFD,7

_5/o'I.9' 7/, 6dfo.d-

14. Houre Generator On-une O'O AM d.O Is. Umst Rossen shutdown Heure
16. Geon Thanmal Eaergy r"(MWH)

/930630 ISN59085 DDb> 673>%3

'430, lo/ 2 ~

5,d'/7.aOV

/o5,7/2.797

17. Geese Electrieel Ensegy Generated (MWH) ff05> S05

'l 8/SW9 M 3W 528 Is. Not Eieetrieel Energy Genermeed (MWH)

I/o. /

M3

' fo8.7

19. Unit Servios Facter 8/o. /

38,3

/of./

20. Unit AvaileWitty Factor
21. Unit cepecity Factor (Usire $'DC isi)
77. 3
52. f 5f. 8 ff.3
52. J 58.K
22. Unit Capacity Factor (Using DER Net)

Y.Y Y. 7

/ '/. O

23. Unit Forced Outage Rete
24. Shutdowns Scheduled Over Next 6 Months (Type. Dete. and Duration of Each):

6ane.1,.l9% ts k not scheduled refue\\incu adoor.

s e

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Unite la Test Statue (Prior to Commercial Operation):

Forecent Achieved INITIAL CRITICALITY

'JJ INITIAL ELECTRICITY

~

I COMMERCIAL OPERATION

)

8601150274 851231 PDR ADOCK 05000295 (9p73 R

PDR

AVERAGE DAILY UNIT POWER LEVEL O~bb DOCKET NO.

bY ?]*.l UNIT

!A

/M DATE COMPLETED BY

/

/

7kb c7h TELEPHONE MONns ' bede/t16M' DAY

- AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe. Net)

(MWe Net Nb 17 j

d 1,

2

/

19 3

4 20

~/

21 5

6 22

~

7 23 26 ~5

/ o 22 5 u

A97 H)2%

2,

/

10 26 11 27 905

/on?

2,

,2

,3 29 30 14 15 31 16 INSTRUCTIONS On this format, list the average daily unit power levelin MWe. Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

}

50- 2 5 UNIT M AIO M M zieN t/r,,Y L A.

DATE #6 6/ 07 1

/%~'6, CORW121ED Sy 6m/ Ass /vi REFORT asimso m r3f2) w6; tope,/

1 1

i.i.enew 4 g3

~

.3 -

n s

ca.m a comeo.

y l

rl

]g Ewat

d Action to me.

Deu a

.,e- -

v3 t

9 Y

      • l $

Off diis b $61 b b"*' f '

yp ga un jo g512 blo f

S 'I tea Joe 7;i;qoe u M s b 4 ao un i

dae. k "o ".sEN on.s/com lbw i

cAgnnels b Coheidence a>iN dst $

.sicam Generalor level.

I i

l l

4 l

I 2

3 4

Ma*had F: Forced Reason:

Exhibit G Instructions 5: Scheduled A E(uipment Failure (Explain) s.n.nv.g for Preparation of Data

  • a=== of Test 2-Manual scram Entry Sheets for Lkensee C Refueling 3-Aute Scram Event ReporI(LER) File (NUREG.

D Regulatory Rastriction 4-continued 014i)

E4perator Training & IJeanse Examination y*$*dL**d i

F.Administmalve 5

G4perational Errw(Emplain)

Exhibit I Same Source

. (9/77)

Hether(Emplain) i

OPERATING DATA REPORT 50'30Y DOCKET NO.

DATE E o/07 COMPLETED BY & #v5N TELEPHONE N WV OPERATING STATUS 2/04 11/Y

/,'<.LD Notes g, y,gg m.

am 56/2 c/ 7e.1voo f5/2.3/

2. Reporting reeled.
3. Lisemoed Thennel Power (MWt):

MO

4. Nessepiste Rating (Geoss MWe):

/O D

5. Design Electrimi Rating (Not MWe):

/dfd

6. Maximium DependeWe Capacity (Gross MWe): /66
7. Meshnami DepsedeWe Capacity (Net MWe):

/0 W

8. If Changes Occur in Capacity Ratings (Iteme Nunnber 3 Timough 7) Sina last Report, Give Reasons:

A/A

9. Power 1Avel To Whicia Restricted,if Any (Net MWe):

8 A/#

10. Reasses For Restrictions,if Any:

1 1

This Month Yr to.Dete Cumieletive

\\

11. no.re la Reporting eriw 7VH d 87/oO.d 9Md0 p
12. Numsker Of Hours Reactor Was CIltical
o. C 59/W. 2 7/,V/F.5
13. Reneen Rosem Shutdows Hours O. d AA 22/e /
14. nears Geassator On-Une O. O 5 9 0 /o 3

/A laQfo.'7 Is. Unit Rosem Shusdown noure

/9. O A.o M. o

16. Gsees Thermal Eassgy Gemeested (MWH)

M

//o. 57o7, /6/

o7dd 672,5d5

17. Geoes Electrieel Emessy Generated (MWH)

/)

535f, #35

/,,y 3/9.595

18. Not Electrieel Energy e-w (MWH)

- /e ///

5 //Y,/86

/ed 677, W2

19. Unit Seevios Factor AO

/o 7. V 7/1 Y

28. Unit Availsh81ty Factor O, d

/o7. f 70 V

21. Unit Cap city recear (Using MDC Net)

-M 9 5/e. /

S7, O

22. Unit Capacky rector (Using DER Net)

- O. 8

56. /

S 7. o

23. Umst Faeed omtage Rme D.o 6, 3

/5,9

24. Shutdowns Sc.Waiad Over Next 6 Months (Type. Dete, and Duration of Each):

A/A

25. If Shut Down At End Of Report Period, Estleisted Date of Startup:

Mb

26. Unite la Test Stetso (Prior to Commiercial Operation):

Forecent Acideved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (9/77)

AVERAGE DAILY UNIT POWER LEVEL M30V DOCREruO.

CA/N-[

UNIT /hO/d7 DATE

-f NATh/[

COMPLETED BY O 7kdfd7 TELEPHONE 4

' k0}fg MONTH ~ DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe-Net) -h ~

7

~/! !8 ~~ 2 ~! 19 3 7 - /6 u 4 ~ !< ~ 21 5 ~ ~ 6 22 ~! U 7 U ~ ~ 8 24 ~ 9 25 ~ 10 ~ 26 ~ l1 27 ~ 12 28 ~ 13 29 ~ ~ 34 30 -~ 15 31 16 INSTRUCTIONS % this format list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt, (9/77) t

1 I 8O ~30V DOCERTMD. uNormRnDOWNB ANDFOWER REDUCDONg UlWTNAtst LoM lid,f 2 DATE M O/ 67 COIWLETED BY G Av5hn j REPORTAIOpsyg ed. TEE.EppIONE(3/127% 20sc/ "l 1 + 1 .g -

  • T" i.was N

c==esa car-in- ~ }. Ewns l Action to No. Date [ v{3 ~,-t - L; a r- - l 6 50705 .5 7W6 6 2 N $y'&k Vil/l-H SeblelI/rf h lA-= s 1 i l 1 1 1 i I 2 3 4 88a ad

p. Formd h.

Exhibit G-lastructions i S: Scheduled A-Equipsnent Feihue(Emplain) 1-Manual for Preparation of Desa 3.na.a a of Test 2-Manual scram Entry Sheets for L censee c.3,r igng 3-Aute Sorse Ewn Repwi(LEl'.) File (NUREG. 1:::a'anat.a. a'6" 2 D-=. u -r a uh a n n l E4perator Training & IJeanse Esassinesion 9-other F.Adeninistratiw 5 G4perational Errw(Emplain) Exhilds i.Some Sou se ' 19/77) Hether(Emplain)

NOVEMBER

SUMMARY

OF OPERATING EXPERIENCE ' UNIT 1 The unit entered the reporting period at a power level of 810 MWe (78% reactor power). On December 4th at 0348 hours, the unit was taken off line for turbine balancing. On December 6th at 0100 hours, the reactor tripped while in hot stendby, due to "0" shift on steam flow channels in coincidence with 25% steam generator level. On December 7th at 0630 hours the unit was made critical and on December 8th at 1104 hours the unit was synchronized to the gird. The unit remained on line the remair. der of the report period, ending at a power level of 1053 MWe (99% reactor power) having and availability factor of 86.1% and a capacity factor of 78.1%. Unit 2 The unit entered the report period shutdown for the continuation of Cycle VIII-IX refueling outage. The unit remained shutdown for the entire report period. 1052t 0505A L

December Major Safety Related Maintenance Eauipment Work Performed There was no Safety Related Maintenance done this month. { -1052t 0505A i i

REFUELING INFORMATION REQUEST Questions: 1. Name of facility. 2. Scheduled date for next refueling shutdown. 3. Scheduled date for restart following refueling. 4. Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment? If answer is yes, what, in general, will these be? If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref. 10 CFR Section 50.59)? If no such review has taken place, when is it scheduled? 5. Scheduled date (s) for submitting proposed licensing action and supporting information. 6. Important licensing considerat - s associated with refueling, e.g., new or different fuel des gn or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures. 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool. 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies. 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity. s ? age 1 of 3 1052t 0505A

!! nit 1 - Answers l 1. Zion Unit 1 l 2. June 26, 1986,is the scheduled date for the next refueling outage. 3. October 23, 1986 is the scheduled date for initial criticality following refueling. 4. A reload safety evaluation review will take place March 31, 1986 and may identify any unreviewed safety questions. The receipt of new fuel for the next Unit 1 refueling will require a Technical Specification change to allow on-site storage of fuel enriched up to 3.7 w/o U-235. 5. Changes have been submitted. 6. None 7. The number of fuel assemblies a) in the core is 193, and b) in the spent fuel storage pool which have been discharged by Zion Unit 1 is 497. 8. The present licensed spent fuel pool storage capacity (shared with Zion Unit 2) is 2112 fuel assemblies. The installation of the new storage racks has been completed. S. In 1995, Zion Station will !ose full core discharge capability. This date is based on a December, 1983 study. Page 2 of 3 1052t 0505A

Unit 2 - Answers 1. Zion Unit 2 2. The Unit shutdown on September 6,1985 for the current refueling outage. 3. January 14, 1986 is the scheduled date for initial criticality after refueling. 4. The January, 1986 startup will require two Technical Specifications to be approved; they are for RCFC damper removal and the reactor vessel specimen capsule withdrawal schedule. 5. Changes have been submitted. 6. None. 7. The number of fuel assemblies a) in the core is 193, and b) in the spent fuel storage pool which have been discharged by Zion Unit 2 is 511. 8. The present licensed spent fuel pool storage capacity (shared with Zion Unit 1) is 2112 fuel assemblies. The installation of the new storage racks has been completed. 9. In 1995, Zion Station will lose full core discharge capability. This date is based on a December, 1983 study. Page 3 of 3 1052t 0505A

f% '.) CommonwealthEdison Eion Nofsb January 7, 1986 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Conunission Washington, D.C. 20555 Attention: Document Control Desk

Dear Sir:

Enclosed please find the Operating Status Report for the month of December, 1985 for Zion Generating Station. Very truly yours, kaw G. J. Plimi Station Manager Zion Station GLA/ss Enclosure (11) cc: D. P. Galle J. G. Keppler (NRC) L. D. Butterfield H. E. Bliss INP0 R. Johnson Division of Env. Health State of Illinois Tech Staff File I h ,s 1052t 0505A _}}